Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation
WORK ACTIVITY Manual handling of large items Manual handling activities PERSONS AT RISK Strains, crushing, cuts and abrasions PTS Operatives HAZARDS IDENTIFIED RISK CONTROL MEASURES RISK LEVEL LEVEL EMPLOYED ADJUSTED 5 Assess all activity before undertaking work and express caution when manipulating 4 and moving large items and loads. Clear area of potential obstructions and warn others of hazards 5 Assess all activity before undertaking work and express caution when manipulating 4 and moving large items and loads. Clear area of potential obstructions and warn others of hazards 4 Ensure all portable electric equipment and power tools are incorporated in a 1 maintenance programme that regularly inspects and tests the items to ensure their integrity and lack of defect. Ensure only competant persons (NSI8) operate M.E.W.P.S and in accordance with 8 4 operational recommendations and approved practice. Ensure provision use of correct PPE and FALL RESTRAINTequipment.Notify all others in the vicinity of work being done. Banksman to operate emergecy stop in the event of malfunction 6 Use only competent trained operator and ensure routes are planned prior to crane 3 movement Banksman to operate emergency stop in event of malfunction 6 Secure all loads and ensure only competent banksmen assist operations. 3 5 Conduct crane work in accordance with PTS company policy,LOLER REGS and 3 BS7121 Acc. Yes

Strains, crushing, cuts and abrasions PTS Operatives

Yes

Use of Portable Electric Appliances & Power tools etc. Use of mobile elevated work platform Mobile Crane working

Electrocution & other fault associated PTS Operatives hazards Working from height, falling objects, falling persons etc. Vehicular movement on site Movement of large loads on site Collisions and equipment damage PTS Operatives & all persons in vicinity All persons in vicinity All persons in vicinity All persons in vicinity

Yes

Yes

Yes Yes Yes

POWER TECHNOLOGY SOLUTIONS

Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation

WORK ACTIVITY

HAZARDS IDENTIFIED

PERSONS AT RISK All persons in vicinity All persons in vicinity All persons in vicinity All persons in vicinity

RISK

CONTROL MEASURES

RISK LEVEL Acc. ADJUSTED 3 Yes 3 3 3 Yes Yes Yes

All terrain fork lift truck operations

Vehicular movement on site

Movement of large loads on site Transport of equipment and Vehicular movement on site large loads on site Collisions and equipment damage

LEVEL EMPLOYED 6 Use only competent trained operator and ensure routes are planned prior to truck movement. 6 Secure all loads before movement. 6 Clear area and routes of obstructions and inform others of activity being undertaken. 4 Use banksmen, especially for reversing manoeuvres.

RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL

All works

Inclement weather conditions

All persons in vicinity

All works

All works

Danger to and from persons gaining All persons in vicinity unauthorised access.All people will have competancies and trained to Danger from live overhead electric PTS Operatives & all lines,All equipment is deemed as live persons in vicinity and working at 400kv. Slips, trips, falls etc. Noise pollution PTS Operatives

Miscellaneous All works

4 3 7 5 6

PTS operatives & all persons in vicinity Walking on Trench Covers Collapse of weak Trench PTS operatives & all Covers,High pressure Air pipes in persons in vicinity Working in the proximity of Noise pollution from circuit breakers PTS operatives & all Unsilenced Circuit opening / closing persons in vicinity Power failure of Crane Crushing from suspended load, PTS operatives & all crushing distance off 600mm to be persons in vicinity

All working will be restricted to daylight hours, and where rainfall or the likelihood of rainfall is present, necessary works will be protected by the provision of impermeable sheeting. All access and vehicular movements will be controlled by the erection of temporary fencing surrounding the work area. Such fencing will be secured in position and clearly posted with appropriate signs indicating undertakings. All works to be undertaken under a permit to work system, and isolation from other sources of supply to be checked as required. Demarcation of the work area to be adhered to whilst assuring correct minimum clearances from all other lines and bus sections. Encourage diligence and conscientiousness at all times and employ good housekeeping measures as are inherent throughout PTS/RWE works. Eliminate the production of significant noise levels wherever possible, if this is not possible then ensure noise is reduced as best as is practicable and provide hearing Avoid stepping on cable trenches at all times. Any damaged trench covers should be reported and barriered with immediate effect. Ear protection to be worn when working in close proximity to in service circuit breakers. Communicate with client with regards to likelihood of circuit breakers being Emergency Control measures in place as per points 7a &7b or method statement.

Yes

Yes

Yes

3 1 1 1

Yes

Yes

Risk Levels are gauged between 0 and 10, indicative of their assessed potential to occur.

RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL