Sie sind auf Seite 1von 26

DONG-IN ENTECH K1, INC.

SFB Bldg # 11, BEZ Mariveles, Bataan, Philippines

Prepared by: Checked by: Noted b y: Approved b y:

Wally boy A. Francisco ErlindaPunzalan LeslieBuenaventura J.C. Lee


Industrial Engineer Supervisor PPC Head Production Manager

MOMENTUM DS SO9 Production Details...Revision 0


Prepared by

Wally boy A. Franc


Industrial Enginee

MOMENTUM DS SO9 Production Details...Revision 0


Prepared by: Checked by: Noted b y: Approved b y:

Wally boy A. Francisco ErlindaPunzalan LeslieBuenaventura J.C. Lee


Industrial Engineer Supervisor PPC Head Production Manager

Prepared by: Checked by: Noted b y:

Wally boy A. Francisco


Erlinda Punzalan
Leslie Buenaventura
Industrial Engineer Supervisor PPC Head

MOMENTUM DS SO9 Production Details...Revision 0


Approved b y:

J.C. Lee
Production Manager

MOMENTUM DS SO9 Production Details...Revision 0


DONG-IN ENTECH K1, INC.
SFB Bldg # 11, BEZ Mariveles, Bataan, Philippines

A. MANPOWER ALLOCATION

PARTS: MANPOWER
LEGLOOP 22
WAISTBELT 28
MESH BAG 4
BELAY LOOP 2
CENTER PIECE 4
60
Reference in Machine Layout

B. MACHINE LAYOUT
SUMMARY OF MACHINES

TYPES OF MACHINES
SN 8
DY 40
DY w/ FOLDER 4
BASS 4
BARTACK 4
TOTAL 60

MOMENTUM DS SO9 Production Details...Revision 0


MOMENTUM DS SO9 Production Details...Revision 0
Prepared by: Checked by: Noted b y: Ap

Wally boy A. Francisco ErlindaPunzalan LeslieBuenaventura


Industrial Engineer Supervisor PPC Head Pr

MOMENTUM DS SO9 Production Details...Revision 0


ked by: Noted b y: Approved b y:

Punzalan LeslieBuenaventura J.C. Lee


ervisor PPC Head Production Manager

Prepared by: Checked by: Noted b y: Approved b y:

Wally boy A. Francisco


Erlinda Punzalan
Leslie Buenaventura J.C. Lee
Industrial Engineer Supervisor PPC Head Production Manager

MOMENTUM DS SO9 Production Details...Revision 0


DONG-IN ENTECH K1, INC.
SFB Bldg # 11, BEZ Mariveles, Bataan, Philippines

TOTAL OPERATION 52
TARGET 30
MANPOWER USED 40

Prepared by: Checked by: Noted b y: A p p r o v e d b y:

Rosemel C. Balceta WallyboyFrancisco LeslieBuenaventura J.C. Lee


OJT-Industrial Engineer Industrial Engineer PPC Head Production Manager

GRUBSTAKE ...Production Details...Revision 0 Page 9 of 1


GRUBSTAKE ...Production Details...Revision 0 Page 10 of 1
GRUBSTAKE ...Production Details...Revision 0 Page 11 of 1
Prepared by: Checked by: Noted b y: Approved b y:

Rosemel C. Balceta
Wally boy Francisco
Leslie Buenaventura J.C. Lee
OJT-Industrial Engineer Industrial Engineer PPC Head Production Manager

GRUBSTAKE ...Production Details...Revision 0 Page 12 of 1


DONG-IN ENTECH K1, INC.
SFB Bldg # 11, BEZ Mariveles, Bataan, Philippines

A. MANPOWER ALLOCATION

PARTS: MANPOWER
WAISTBELT VECTRAN
LEGLOOP VECTRAN
WAISTBELT
LEGLOOP

TOTAL 0

B. MACHINE LAYOUT
SUMMARY OF MACHINES

TYPES OF MACHINES MACHINE


SN
DY
BASS
BARTACK

TOTAL 0

HERCULES SIT HARNESS...Production Details...Revision 0 Page 13 of 1


HERCULES SIT HARNESS...Production Details...Revision 0 Page 14 of 1
HERCULES SIT HARNESS...Production Details...Revision 0 Page 15 of 1
Prepared by: Checked by: Noted b y: Approved b y:

Wally boy A. Francisco


Erlinda Punzalan
Leslie Buenaventura J.C. Lee
Industrial Engineer Supervisor PPC Head Production Manager

HERCULES SIT HARNESS...Production Details...Revision 0 Page 16 of 1


DONG - IN ENTECH K -1 INC.
SFB Bldg. # 11, BEZ MARIVELES, BATAAN, Philippines

MOTION & TIME STUDY


Buyer: TIMBUK 2
Item Name: GRUBSTAKE
Main line: PREPARATION

Machine COLOR Normal % Standard Standard


No Operation QTY UNIT Cycle Observed Rating Time O/P per HR
Type Allow
THREAD 1 2 3 Time Time DY
A FLAPS
SN 1 1 Topstitch F-velcro to flaps lining black 1 pc 50 50 49 49.67 99 49.33 7 53 68 3
SN 2 2 Baste flaps lining to flaps black 1 pc 61 58 55 58.00 95 55.00 7 59 61 1
DY 3 3 Insert SR male to webb then baste to upper 1 pc 22 22 20 21.33 97 20.67 7 22 163

FRONT BODY
SN 4 1 Baste lining to front body 1 pc 73 72 69 71.33 98 69.67 7 75 48
SN 5 2 Fold then baste front compression end 1 pc 46 44 40 43.33 94 40.67 7 44 83
BT 6 3 Bartack front compression end 1 pt 14 13 12 13.00 92 12.00 7 13 280
DY 7 4 Baste front compression 4 pts 61 55 54 56.67 92 52.33 7 56 64
BT 8 5 Bartack front compression 3 pts 20 18 17 18.33 91 16.67 7 18 202
DY 9 6 Baste lower compression w/ logo 4 pts 75 72 68 71.67 95 68.33 7 73 49
BT 10 7 Bartack lower compression 2 pts 17 16 14 15.67 91 14.33 7 15 235

BOTTOM
SN 11 1 Baste lining to bottom base 1 pc 71 69 69 69.67 98 68.33 7 73 49

SHOULDER STRAP
DY/F 12 1 Binding shoulder support 2 pcs 74 72 70 72.00 97 70.00 7 75 48
SN 13 2 Baste support to lower strap 2 pcs 65 50 46 53.67 79 42.33 7 45 79
DY 14 3 Baste & top upper & center strap 2 pcs 48 48 47 47.67 99 47.33 7 51 71
DY 15 4 Baste & top center & end to lower strap 2 pcs 105 103 101 103.00 98 101.00 7 108 33
DY 16 5 Baste upper, insert sponge then close 2 pcs 356 354 340 350.00 98 344.00 7 368 10
DY/F 17 6 Binding shoulder strap 2 pcs 136 134 132 134.00 99 132.00 7 141 25
BM 18 7 Fold & crosstitch webbing w/ LL 2 pcs 56 50 49 51.67 92 47.33 7 51 71

Standard time 1339


***NOTE: Unit in Time = Second
OBSERVED TIME = AVERAGE OF CYCLES
RATING = 200 - SLOWEST CYCLE X 100
AVERAGE OF CYCLES
NORMAL TIME = OBSERVED TIME X RATING/100
STANDARD TIME = NORMAL TIME X 1.07
STANDARD OUTPUT PER HOUR = 3600 SECONDS / STANDARD TIME
DONG - IN ENTECH K -1 INC.
SFB Bldg. # 11, BEZ MARIVELES, BATAAN, Philippines

MOTION & TIME STUDY


Buyer: TIMBUK 2
Item Name: GRUBSTAKE
Main line: BACK BODY

COLOR Normal Standar


Machine % Standar
No Operation QTY UNIT Cycle Observed Rating d O/P
Type Allow d Time
THREAD 1 2 3 Time Time per HR DY
LAPTOP POCKET
SN 19 1 Baste inner support 1 pc 15 14 12 13.67 90 12.33 7 13 273
SN 20 2 Close inner support 1 pc 27 23 23 24.33 89 21.67 7 23 155
SN 21 3 Baste lower corner of laptop pocket 1 pc 29 28 28 28.33 98 27.67 7 30 122
SN 22 4 Topstitch M-velcro to upper center 1 pc 19 18 18 18.33 96 17.67 7 19 190 1
DY/F 23 5 Binding upper 1 pc 38 33 30 33.67 87 29.33 7 31 115
SN 24 6 Baste lower lining 1 pc 40 44 37 40.33 101 40.67 7 44 83
SN 25 7 Baste lining to hypalon 1 pc 45 43 42 43.33 96 41.67 7 45 81

BACK BODY
SN 26 1 Baste back lining,insert sponge then close 1 pc 73 73 71 72.33 99 71.67 7 77 47
DY 27 2 Fold, crosstitch & close crossbar w/ webbing 1 pc 149 145 140 144.67 97 140.33 7 150 24
SN 28 3 Double fold webbing ends then baste 2 pcs 39 32 31 34.00 85 29.00 7 31 116
BT 29 4 Bartack crossbar 4 pts 25 25 20 23.33 93 21.67 7 23 155
BT 30 5 Bartack webbing ends 2 pcs 29 29 26 28.00 96 27.00 7 29 125
DY 31 6 Attach crossbar to back body 2 pcs 37 37 35 36.33 98 35.67 7 38 94

Standard time 552


***NOTE: Unit in Time = Second
OBSERVED TIME = AVERAGE OF CYCLES
RATING = 200 - SLOWEST CYCLE X 100
AVERAGE OF CYCLES
NORMAL TIME = OBSERVED TIME X RATING/100
STANDARD TIME = NORMAL TIME X 1.07
STANDARD OUTPUT PER HOUR = 3600 SECONDS / STANDARD TIME
DONG - IN ENTECH K -1 INC.
SFB Bldg. # 11, BEZ MARIVELES, BATAAN, Philippines

MOTION & TIME STUDY


Buyer: TIMBUK 2
Item Name: GRUBSTAKE
Main line: ASSEMBLE

COLOR Normal Standar


Machine % Standar
No Operation QTY UNIT Cycle Observed Rating d O/P
Type Allow d Time
THREAD 1 2 3 Time Time per HR DY
ASSEMBLE
DY 32 1 Baste side body lining to back body 2 pcs 73 72 70 71.67 98 70.33 7 75 48
DY 33 2 Baste side body to back body 2 pcs 109 107 106 107.33 98 105.67 7 113 32
BT 34 3 Bartack crossbar 4 pts 35 33 33 33.67 96 32.33 7 35 104
DY 35 4 Close side body 2 pcs 98 95 88 93.67 95 89.33 7 96 38
DY 36 5 Join flaps 1 pc 70 68 65 67.67 97 65.33 7 70 51
SN 37 6 Baste lining to front side 2 pcs 83 80 75 79.33 95 75.67 7 81 44
DY 38 7 Attach front side to side body & flaps 2 pcs 93 92 89 91.33 98 89.67 7 96 38
DY/F 39 8 Binding front side 2 pcs 50 49 48 49.00 98 48.00 7 51 70
DY 40 9 Topstitch binding 2 pcs 59 55 50 54.67 92 50.33 7 54 67
DY/F 41 10 Binding upper 1 pc 48 46 45 46.33 96 44.67 7 48 75
BT 42 11 Bartack webbing w/ M-SR 1 pt 14 12 10 12.00 83 10.00 7 11 336
SN 43 12 Topstitch M-velcro to vertical webbing 2 pcs 45 44 42 43.67 97 42.33 7 45 79
DY 44 13 Join front body to main body then top vertical webbing 2 pcs 846 832 828 835.33 99 824.67 7 882 4
DY 45 14 Join bottom to main body 1 pc 176 174 167 172.33 98 168.67 7 180 20
DY/F 46 15 Binding bottom 1 pc 167 166 166 166.33 100 165.67 7 177 20
SN 47 16 Topstitch F-velcro to laptop keeper 1 pc 33 32 30 31.67 96 30.33 7 32 111
DY 48 17 Baste laptop keeper inside 1 pc 25 22 21 22.67 90 20.33 7 22 165
DY 49 18 Attach shoulder strap & handle to back body 2 pcs 301 292 284 292.33 97 283.67 7 304 12
DY 50 19 Topstitch inner webbing support w/ label 1 pc 488 475 468 477.00 98 466.00 7 499 7
DY 51 20 Topstitch outer webbing support 1 pc 495 479 470 481.33 97 467.67 7 500 7
BT 52 21 Bartack strap & handle 6 pts 60 58 58 58.67 98 57.33 7 61 59

TOTAL 52 Standard time 3433


***NOTE: Unit in Time = Second
OBSERVED TIME = AVERAGE OF CYCLES
RATING = 200 - SLOWEST CYCLE X 100
AVERAGE OF CYCLES
NORMAL TIME = OBSERVED TIME X RATING/100
STANDARD TIME = NORMAL TIME X 1.07
STANDARD OUTPUT PER HOUR = 3600 SECONDS / STANDARD TIME
36mp
5324 24
SN HIGH BASS BARTACK dy/f
SN HIGH BASS BARTACK dy/f
SN HIGH BASS BARTACK dy/f

#DIV/0!