Beruflich Dokumente
Kultur Dokumente
If you have any questions, please feel free to contact Andy Routsis at
978.957.0700 or e-mail him at andyr@traininteractive.com.
IN-MOLD RHEOLOGY TEST Machine #
Mold #
# of Cavities
1. Set-up a first stage short shot using a fast injection speed
Material Type
2. Mold a part and record: Fill Time
Pressure at Transfer Cycle Time
3. Reduce injection speed and repeat until table is complete
4. Calculate and plot data Name
5. Choose a recommended fill time in the flattened region Date
1st Stage Fill Time Transfer Pressure Shear Rate Effective Viscosity
Shot Weight (t) ( psi ) (1÷t) ( t × psi )
Melt Temp. 1
2
3
4
5
SHOT
High (stiff)
6
7
8
9
10
VISCOSITY ( t × psi )
Low (easy)
0
Slow Fast
0
SHEAR RATE ( 1 ÷ t )
1st Stage Fill Time Transfer Pressure Shear Rate Effective Viscosity
Shot Weight (t) ( bar ) (1÷t) ( t × bar )
Melt Temp. 1
2
3
4
5
SHOT
High (stiff)
6
7
8
9
10
VISCOSITY ( t × bar )
Low (easy)
0
Slow Fast
0
SHEAR RATE ( 1 ÷ t )
SHOT
4. Repeat with increasing 2nd Stage Time beyond gate seal
5. Plot on chart 6
6. Determine the time frame during which the gate seals 7
7. Determine the optimal 2nd Stage Time 8
9
10
Part Weight (grams)
0
2nd Stage Time (seconds)
Name
Date
Plastic Temperature
Plastic Pressure
Pack Time ( s ) Plastic Pack Pressure ( ppsi ) Fill & Pack Part Weight ( g )
Plastic Cooling
Cooling Timer ( s )
Clamp
Name
Date
Plastic Temperature
Plastic Pressure
Pack Time ( s ) Plastic Pack Pressure ( pbar ) Fill & Pack Part Weight ( g )
Plastic Cooling
Cooling Timer ( s )
Clamp