SCOPE OF APPLICATION Rigging study is describe the guidelines and operating step of Lifting Gasifier. 03. REFERENCE 1. HaGun Engineering RIGGING DEPARTMENT REFERENCE 04. EQUIPMENT No Equipment 01 Crawler Crane 02 Boom Length 57 meter 05. RIGGING TOOLS No Equipment 01 Sling dia. 1.5" x 8 M 02 Chain Block 03 Shackle SWL 04 Manila Rope 7/8"x100M 06. SAFETY REQUIREMENTS No Equipment 01 Safety Barricade Red White 02 Safety Cone 07. SAFETY FACTOR CALCULATION No Equipment 01 Weight of material 02 Crane Block 03 Wire Sling 04 Spreader Beam 05 Shackle 06 Total Weight 07 Crane Capacity 08 Safety Factor
LIFTING STUDY OBJECT 40 TON BY CRAWLER CRANE 150TON OVER ELEVATION 32 METER
SLING
BOOM 57 ME
FL+32000
TER
FL+29400
FL+26400
FL+23700
FL+16000
SF =
49.50 42.23
= 1.17
RIGGING DEPARTMENT
ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK
START DATA MATERIAL 1. DIMENSION 2. WEIGHT REFERENCE 1. RIGGING BOOK 2. EQUIPMENT MANUAL ASME B30.5-2004 Mobil & Locomotive cranes 4. ASME B30.6-2003 Derrick 5. ASME B30.10-1999 Hook 6. ASME B30.21-2005 manually lever operated hoist ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 8. ASME B30.26-2004 Rigging Hardware 9. BS EN 5973 Scaffolding 10. Australian Standard, AS 3569--1989, Wire ropes 11. Australian Standard, AS 2759--1985, Wire ropes 12. AWS Dl4.1/D14.1M:2005 Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment 3.
R max 14000 mm
7.
Yes
TAILING DESIGN
Risk
ACTION
CONTROL
Final Inspection by HaGun Engineering Yes Prepare Final Report for ApprovaL Handover FINISH
No
R1
40
00