SUPER-STRUCTURE

Sr No 14.1 Ref. to MoRTH Spec. 1500 &1600 1700 C Description Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 30 Unit = 1 cum Taking output = 15 cum a) Material Cement Coarse sand 20 mm Aggregate 10 mm Aggregate b) Labour Mate Mason Mazdoor c) Machinery Concrete mixer (cap. 0.40/0.28 cum) Generator 33 KVA Basic Cost of Labour, Material & Machinery (a+b+c) for 15 cum For formwork and staging add the following: 14.1C Case I (i) 1 Height 5m to 10m hour hour 6.00 6.00 87353.00 214.40 343.04 1286.38 2058.21 P&M-009 P&M-079 day day day 0.90 1.50 21.00 149.61 218.18 143.38 134.65 327.27 3010.91 L-12 L-11 L-13 tonne cum cum cum 6.10 6.75 8.10 5.40 6267.63 1751.22 2257.95 2257.95 38232.54 11820.72 18289.39 12192.93 M-081 M-005 M-053 M-051 Unit Quantity Rate Rs Cost Rs Remarks/ Input ref.

14.1

Case I Using Concrete Mixer

Basic Cost of Labour, Material & Machinery (a+b+c) for 15 cum d) Formwork and staging 25 per cent of (a+b+c) e) f) Overhead charges @ 10 % on (a+b+c+d) Contractor's profit @ 10 % on (a+b+c+d+e)

87353.00 25.00 21838.25 10919.13 12011.04 132121.41 8808.09 say 8808.00

Cost for 15 cum = a+b+c+d+e+f Rate per cum = (a+b+c+d+e+f)/15 14.2 1600 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications Unit = 1 MT Taking output = 1 MT a) Material HYSD bars including 5 per cent for laps and wastage Binding wire b) Labour for cutting, bending, tying and placing in position Mate Blacksmith Mazdoor Basic Cost of Labour & Material (a+b) c) d) Overhead charges @ 10 % on (a+b) Contractor's profit @ 10 % on (a+b+c) say 14.11 1500,160 0,1700 & 2704 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification Unit = 1 cum Taking output = 1 cum a) Material Cement concreteM30 Grade Refer relevant item of concrete in item 12.8(G)by using batching plant, excluding formwork i.e. per cum basic cost (a+b+c) (Excluding OH & CP) ( Refer relevant item of concrete in item No. 13.8 (G) except that form work may be added at the rate of 2 per cent of cost against 3.5 per cent provided in the foundation concrete. HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP) Overhead charges @ 10 % on (a) Contractor's profit @ 10 % on(a+b) say Note The grade of reinforced cement concrete may be adopted as M30 for severe conditions and M25 for moderate conditions. cum 1.00 5755.00 tonne Kg 1.05 8.00 46443.46 65.00

48765.64 520.00

M-082 M-072

day day day

0.44 3.00 8.00 51041.00

149.61 180.78 143.38

65.83 542.34 1147.01 5104.08 5614.49 61759.39 61759.00

L-12 L-02 L-13

Rate per MT = a+b+c+d

5755.00

Item 12.8 (G)

115.10

tonne

0.05

51041.00

2552.05 Item 14.2 A 842.22 926.44 10190.80 10191.00

b) c)

Rate per cum (a+b+c)