Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4 GLAST INSTRUMENTS
4.1 GLAST LAT PROJECT
4.1.1 INSTRUMENT MANAGEMENT 4.1.1.1 PROJECT MANAGEMENT
1M1TR1150 1M1000830 1M1000890 1M1000291 1M7942000 1M7R050 1M1000300 1M1000301 1M1000271 1M1000310 1M7941110 1M79530 1M99040 1M79540 1M79560 1M1000311 1M7941090 1M7R040 1M1000114 1M7R010 1M7941070 1M7R020 1M7941440 1M79610 1MFSWFQT10 1M7R030 1M79620 1M7941080 Start LAT Integration & Test Start of FY 2006 Start of FY 2006 Flight Tracker Tower 12 RFI Flight PDU Box-Elec to I&T LCB Flight Units - Elec to Elec Flight Tracker Tower 13 RFI Flight Tracker Tower 14 RFI Flight Tracker Tower 8 RFI Flight Tracker Tower 15 RFI Flight Harness-Elec to I&T Release FSW for FQT Start 16 Tower Comprehensive Performance Test FQT Scripts Complete FQT Complete Flight Tracker Tower 16 RFI Flight Event Processor Units-Elec to I&T 1st Flight EPU/SIU-Elec to I&T Flight Operations Review (L-9 mo.) 2nd Flight EPU/SIU-Elec to I&T Flight GASU Box-Elec to I&T 3rd Flight EPU/SIU-Elec to I&T Final EGSE incl S/C Sim, FSW-Elec to I&T FSW RFI to I&T FSW FQT - Elec to I&T 4th Flight EPU/SIU-Elec to I&T Delta Test Readiness Review 5th Flight EPU/SIU-Elec to I&T 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03OCT05 0 03OCT05* 0 03OCT05* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05OCT05 06OCT05 06OCT05 07OCT05 07OCT05 11OCT05 14OCT05 14OCT05 17OCT05 17OCT05 24OCT05 31OCT05 02NOV05 02NOV05 02NOV05 14NOV05 14NOV05 22NOV05 23NOV05 01DEC05 01DEC05 01DEC05 06DEC05 09DEC05 20DEC05 03OCT05 565 0 0 17 57 10 16 16 14 471 28 555 50 550 545 458 38 37 161 29 23 Start LAT Integration & Test Start of FY 2006 Start of FY 2006 Flight Tracker Tower 12 RFI Flight PDU Box-Elec to I&T LCB Flight Units - Elec to Elec Flight Tracker Tower 13 RFI Flight Tracker Tower 14 RFI Flight Tracker Tower 8 RFI Flight Tracker Tower 15 RFI Flight Harness-Elec to I&T Release FSW for FQT Start 16 Tower Comprehen FQT Scripts Complete FQT Complete Flight Tracker Tower Flight Event Process 1st Flight EPU/SIU-El Flight Operations 2nd Flight EPU/S Flight GASU Box-Elec to I&T
22 3rd Flight EPU/SIU-Elec to I&T 22 524 19 15 518 11 FSW RFI to I&T FSW FQT - Elec to I&T 4th Flight EPU/SIU-Elec to I&T Delta Test Readiness Review 5th Flight EPU/SIU-Elec to I&T Final EGSE
0 03OCT05* 23DEC05
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
Sheet 2 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
Sheet 3 of 21
Activity ID
Activity Description Start of FY 2006 Flt. Modules 3 thru 16 ready for Integration
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 155 Start of FY 2006 Flt. Modules 3 thru 16
4.1.4 TRACKER
4T000105 4T000050 0 03OCT05* 0 02NOV05 458
4.1.4.4 TOWER STRUCTURE & ASSEMBLY 4.1.4.4.2 TOWER CABLE PLANT (SLAC/UCSC) 4.1.4.4.2.2 FABRICATE FLEX CIRCUIT CABLES (UCSC)
4T42S005 4T42S230 4T42S250 (Rec) NR, Qual Units/Layouts 2nd Src Flex Cable (Rec) TWR 15 2nd Src Flex Cable in Italy (Rec) TWR 16 2nd Src Flex Cable in Italy (5-16) 1 1 1 3 3 0 03OCT05* 03OCT05 0 03OCT05* 03OCT05 0 03OCT05* 03OCT05 0 03OCT05 05OCT05 569 569 569 567 567 (Rec) NR, Qual Units/Layouts 2n (Rec) TWR 15 2nd Src Flex Cabl (Rec) TWR 16 2nd Src Flex Cabl (Rec) Tower 15 Flex Circuit Cab (Rec) Tower 16 Flex Circuit Cab
4T00445973 (Rec) Tower 15 Flex Circuit Cable in Italy (not) 4T00445983 (Rec) Tower 16 Flex Circuit Cable in Italy (not)
0 03OCT05* 05OCT05
4.1.4.4.3 TOWER ASSEMBLY 4.1.4.4.3.6 FLIGHT TOWER ASSEMBLY (INFN) 4.1.4.4.3.6.A Tower 8 Assembly (INFN)
4T052173 4T052171 4T052176 Ship Tower 8 to SLAC Receiving & Testing TWR 8 AV: Deliver Flight Towers 8 to I & T 3 2 0 0 05OCT05* 07OCT05 0 10OCT05 0 11OCT05 11OCT05 14 14 14 Ship Tower 8 to SLAC Receiving & Testing TWR 8 AV: Deliver Flight Towers 8 t
Sheet 4 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.4.5 TRACKER TEST & CALIBRATION 4.1.4.5.3 FLIGHT TOWER TESTING (INFN)
4T053600 Flight Tower Test Support (INFN) 120* 83 11MAY05A 28OCT05 546 Flight Tower Test Supp
Sheet 5 of 21
Activity ID
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 509 509 Start of Envir. Testing @ NRL LAT Turnover
4.1.7 ELECTRONICS
7E00000100 7ED0000070 0 23DEC05 0 23DEC05*
4.1.7.4 DATAFLOW ELECTRONICS (TEMs + PROCESSOR FARM) 4.1.7.4.3 TKR/CAL TEM ELECTRONICS
1MDOE00040 Tower Electronics Module - 8th Unit 1MDOE00050 Tower Electronics Module - 16th Unit 0 0 0 0 30SEP05 30SEP05 566 566 Tower Electronics Module - 8th U Tower Electronics Module - 16th
4.1.7.4.4.4 FLIGHT UNITS 4.1.7.4.4.4.3 FLIGHT UNIT FAB, ASSEMBLY & TEST
7E44000870Assembly/Inspect/Coat 7E44000900Functional Test 7E44000910Interface test 7E44000920Performance Test 7E44000930Ambient pressure thermal cycle test 7E44000950Functional Test 7E44000960IA: GASU Flight Unit 92* 1 1 1 7 1 0 52 26JUL05A 05DEC05 0 03OCT05 0 04OCT05 0 05OCT05 0 06OCT05 0 17OCT05 0 03OCT05 04OCT05 05OCT05 14OCT05 17OCT05 05DEC05 498 531 531 531 531 531 498 Functional Test Interface test Performance Test Ambient pressure thermal c Functional Test IA: GASU Flight Unit Assembl
0 03OCT05* 31OCT05 0 0 05OCT05 0 20OCT05 0 26OCT05 0 07NOV05 0 22NOV05 0 0 06DEC05 0 08DEC05 0 13DEC05 0 22DEC05 04OCT05 19OCT05 25OCT05 04NOV05 21NOV05 22NOV05 22NOV05 07DEC05 12DEC05 21DEC05 23DEC05
4.1.7.4.5.4 FLIGHT UNITS 4.1.7.4.5.4.3 FLIGHT UNIT FAB, ASSEMBLY & TEST
7E45000940Ambient pressure thermal cycle test 7E45000955Pack/Ship/Unpack LCB FUs to SLAC 7E45000950Functional Test 1 4 5 0 03OCT05 0 03OCT05 0 03OCT05 03OCT05 06OCT05 07OCT05 10 10 10 Ambient pressure thermal cycle Pack/Ship/Unpack LCB FUs to Functional Test
Sheet 6 of 21
Activity Activity ID Description 7E45000960AV: LCB Flight Units (1/2 of 6) 7E45000965IA: LCB Flight Units (3/4 of 6) 7E45000970IA: LCB Flight Units (5/6 of 6)
Early Start
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 10 AV: LCB Flight Units (1/2 of 6) 532 532 IA: LCB Flight Units (3/4 IA: LCB Flight U
4.1.7.4.8 GASU GLOBAL TRIGGER (GLT) ELECTRONICS 4.1.7.4.8.4 FLIGHT UNITS 4.1.7.4.8.4.3 FLIGHT UNIT FAB, ASSEMBLY & TEST
7E8G000780GLT Flight Unit w/ FU GASU ACD EM 94* 50 22JUL05A 05DEC05 498 GLT Fligh
4.1.7.5.2.4 FLIGHT UNITS 4.1.7.5.2.4.2 QUALIFICATION UNIT FAB, ASSEMBLY & TEST
7E52400500Vendor SIB Assembly/Test Summary 113* 80 24MAY05A 01NOV05 527 Vendor SIB Assembly
4.1.7.5.3 GASU EVENT BUILDER ELECTRONICS 4.1.7.5.3.4 FLIGHT UNITS 4.1.7.5.3.4.3 FLIGHT UNIT FAB, ASSEMBLY & TEST
7E53000870GASU EB Flight Unit w/ FU GASU ACD EM 94* 40 22JUL05A 05DEC05 498 GASU EB
4.1.7.5.4 SIU BACKPLANE 4.1.7.5.4.3 FLIGHT UNITS 4.1.7.5.4.3.2 QUALIFICATION UNIT FAB, ASSEMBLY & TEST
7E54300500Vendor SIU BP Assembly/Test Summary 97* 85 24MAY05A 10OCT05 8 Vendor SIU BP Assembly/Tes
Sheet 7 of 21
Activity Activity ID Description 7E54330560Ambient pressure thermal cycle test 7E54330580Functional Test 7E54330585Pack/Ship/Unpack FU SIU B/P to SLAC 7E54330590IA: SIU B/P Flight Units (1/2 of 6) 7E54330600IA: SIU B/P Flight Units (3/4 of 6) 7E54330610IA: SIU B/P Flight Units (5/6 of 6)
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 8 Ambient pressure thermal cycle 8 8 8 528 528 Functional Test Pack/Ship/Unpack FU SIU B/P IA: SIU B/P Flight Units (1/2 of IA: SIU B/P Flight U IA: SIU B/P Fl
11 AV: 4th Flight EPU/SIU Box for I&T 11 AV: 5th Flight EPU/SIU Box for I&T
4.1.7.6.2 POWER DISTRIBUTION UNIT (PDU) 4.1.7.6.2.3 FLIGHT UNITS 4.1.7.6.2.3.2 QUALIFICATION UNIT FAB, ASSEMBLY & TEST
7E62000500Vendor Assemble/Test Summary 7E62000501CO#1 to AF for PDU Box Mods 205* 20 90 01FEB05A 18NOV05 0 01NOV05* 30NOV05 519 525 Vendor Assemb CO#1 to AF
Sheet 8 of 21
Activity Activity ID Description 7EC6000125 AV: Protoflight PDU Box for I&T 7EC6000135 Pack/Ship/Unpack FU PDU Box 7EC6000150 Mass/TC Test 7EC6000160 Vibration Test 7EC6000190 Thermal Vacuum Test 7EC6000180 EMI/EMC Test 7EC6000200 Review I&T Flight Unit 7EC65E0000 AV: Flight PDU Box for I&T
Early Start
Early Finish 06OCT05* 07NOV05 18NOV05 22NOV05 02DEC05 06DEC05 07DEC05 08DEC05
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 57 AV: Protoflight PDU Box for I&T 519 519 519 519 519 519 519 Thermal Vacuum Test EMI/EMC Test Review I&T Flight Unit AV: Flight PDU Box for I&T Pack/Ship/Unpack Mass/TC Test Vibration Test
4.1.7.6.7.3 FLIGHT UNITS 4.1.7.6.7.3.3 FLIGHT UNIT FAB, ASSEMBLY & TEST
7E67330510Assembly/Inspect/Coat 7E67330560Ambient pressure thermal cycle test 7E67330580Functional Test 7E67330585Pack/Ship/Unpack FU CPS to SLAC 7E67330590IA: CPS Flight Units (1/2 of 6) 7E67330600IA: CPS Flight Units (3/4 of 6) 7E67330610IA: CPS Flight Units (5/6 of 6) 79 1 5 4 0 0 0 99 13JUN05A 03OCT05 0 03OCT05 0 03OCT05 0 04OCT05 0 0 0 03OCT05 07OCT05 07OCT05 07OCT05 11NOV05 28NOV05 9 9 9 9 9 527 527 Assembly/Inspect/Coat Ambient pressure thermal cycle Functional Test Pack/Ship/Unpack FU CPS to S IA: CPS Flight Units (1/2 of 6) IA: CPS Flight Un IA: CPS Flight Units (5/6 of 6)
Sheet 9 of 21
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 53 50 50 50 Write Test Scripts FU Formal Build Testing (a FU Formal Build Testing (a FU Formal Build Test Comp
4.1.7.9.6.5 FU DOCUMENTATION
7EN9651010 7EN9651020 7EN9651030 Version Description Document FU Test Report Design Documents 397 397 460* 460* 106* 0 0 95 02FEB04A 01NOV05 95 02FEB04A 01NOV05 91 02FEB04A 01DEC05 96 02FEB04A 01DEC05 60 01JUL05A 01DEC05 0 0 01DEC05 01DEC05* 39 39 19 19 524 19 iA: FU Documentation Complete 19 FU Documentation Complete Version Description FU Test Report Design D FU Docum Developm
7EN9651000 FU Documentation 7EN9651040 Development of FSW Long Term Maintenance Plan 7EN9653100 iA: FU Documentation Complete 7EN9653110 FU Documentation Complete
Sheet 10 of 21
Activity ID
Early Start
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 524 22 EGSE Flight Unit Electronic
Sheet 11 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.8 MECHANICAL SYSTEMS 4.1.8.1 MANAGEMENT 4.1.8.1.1 MANAGEMENT AND ENGINEERING (SLAC) 4.1.8.1.1.1 MECH SYSTEMS MILESTONES
8M0002100 8M0001600 AV: I-PSR Material Ready LAT Integration started (driven by 4.1.9) 0 0 0 0 03OCT05 30SEP05 556 566 AV: I-PSR Material Ready LAT Integration started (driven b
4.1.8.5 THERMAL CONTROL SYSTEM (SLAC) 4.1.8.5.2 CONTROL SYSTEM FABRICATION (SLAC)
8M0019407 Test Qual Heater Control Box 20 0 03OCT05 28OCT05 476 Test Qual Heater Contr
4.1.8.6 RADIATORS, HEAT PIPES, THERM TEST, X-LAT (LM) 4.1.8.6.7 LAT THERMAL-BALANCE TEST SUPPORT (LM)
8M670015 Deliver T-Bal test reports, TMM to GSFC 0 0 30SEP05 566 Deliver T-Bal test reports, TMM to
4.1.8.8 FABRICATION, ASSEMBLY, AND TEST 4.1.8.8.7 GRID BOX ASSY (GBA) 4.1.8.8.7.3 GRID BOX ASSY OPERATIONS 4.1.8.8.7.3.2 GRID BOX BASE ASSY OPERATIONS
8M0045366 GBBA #1 TCS Operations 8M0045365 GBBA #1 functional test 0* 2 0 03OCT05* 30SEP05 0 03OCT05 04OCT05 564 564 GBBA #1 TCS Operations GBBA #1 functional test
4.1.8.8.8 GRID BOX TEST 4.1.8.8.8.1 GRID BOX TEST ENG SUPPORT
8M0045395 8M0045390 Write SLT test report SLT test readiness review 20 10* 0 04OCT05 31OCT05 545 541 Write SLT test report SLT test readiness r 0 24OCT05* 04NOV05
4.1.8.A MISSION I&T SUPPORT 4.1.8.A.3 MISSION THERMAL TEST SUPPORT (LM)
8M0044402 (PR) Phase 3 Mission Thermal Test Supt FY06 1 0 03OCT05 03OCT05 319 (PR) Phase 3 Mission Thermal T
Sheet 12 of 21
Activity ID
Activity Description ND: X-LAT Thermal Plate-Mech to I&T ND: Flight Tkr Towers 12 RFI ND: Flight PDU Box Elec to I&T ND: Flight Tkr Towers 13 RFI ND: Flight Tkr Towers 8 RFI ND: Flight Tkr Towers 14 RFI ND: Flight Harness-Elec to I&T ND: Flight Tkr Towers 15 RFI ND: Flight Event Process Units-Elec to I&T ND: Flight Tkr Towers 16-RFI ND: Flight GASU Box Elec to I&T ND: Flight SIU Elec to I&T
Early Start
Early Finish 30SEP05 05OCT05* 06OCT05 07OCT05* 11OCT05* 12OCT05* 14OCT05* 14OCT05* 02NOV05 02NOV05* 22NOV05 20DEC05
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 61 17 57 16 14 13 28 471 38 458 23 11 ND: X-LAT Thermal Plate-Mech to ND: Flight Tkr Towers 12 RFI ND: Flight PDU Box Elec to I&T ND: Flight Tkr Towers 13 RFI ND: Flight Tkr Towers 8 RFI ND: Flight Tkr Towers 14 RFI ND: Flight Harness-Elec to I& ND: Flight Tkr Towers 15 RF ND: Flight Event Pro ND: Flight Tkr Tower ND: Flight GA ND: Flight SIU Elec to I&T
4.1.9.1.2 TRAVEL
9IN0000166 Travel - 3 months float (10/05 - 12/05) 58* 0 03OCT05 23DEC05 508 Tr
4.1.9.4 MECH GROUND SUPT EQUIP 4.1.9.4.5 FLIGHT UNIT 4.1.9.4.5.1 LAT INTEGRATION 4.1.9.4.5.1.1 ENGINEERING
9I009038 Proof Test Def'n, LAT Trans Container 30 0 03OCT05* 11NOV05 40 Proof Test Def'n,
Sheet 13 of 21
Activity Activity ID Description 9I008518 (REC) LAT Vibration Test Fixture 9I008528 Assemble LAT Vibration Fixture
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 14 (REC) LAT Vibration Test Fixture 14 Assemble LAT Vibration Fixture
4.1.9.6 INTEG, FACILITIES, CONFIG & TEST 4.1.9.6.1 MANAGEMENT & ENGINEERING
9I016513 IFCT Manager* (10/1/05 - 12/23/05) 58* 0 03OCT05 23DEC05 508 IFC
4.1.9.6.4 CALIBRATION UNIT 4.1.9.6.4.3 SLAC PARTICLE BEAM TEST 4.1.9.6.4.3.2 PREP
9I007060 9I007070 9I010100 Procure End Station A cleanroom Test beam prep Setup ESA CU cleanroom 10 10 10 0 03OCT05* 14OCT05 0 07NOV05 0 21NOV05 18NOV05 06DEC05 473 458 458 Setup ESA CU cleanroom Procure End Station A clean Test beam prep
4.1.9.6.5.1.3 PREP
9I016302 Increased Survey & Alignment Supt of Inspection 97 50 15APR05A 14OCT05 556 Increased Survey & Alignme
Sheet 14 of 21
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 20 22 17 17 18 Integrate Flight Tkr/Cal Tower 11 Install Tower 11 in Bay 15 Rec/Inspect TKR Towers 12 Integrate Flight Tkr/Cal Tower Install Towers 12 in Bay 6
9I0172219 Rec/Inspect TKR Towers 12 9I017122 9I017132 Integrate Flight Tkr/Cal Tower 12 Install Towers 12 in Bay 6
9I0172330 Rec/Inspect TKR Towers 14 9I018412 9I018752 Integrate Flight Tkr/Cal Tower 14 Install Tower 14 in Bay 2
4.1.9.6.5.1.F ACD
9I018002 Integrate / Test Flight ACD on Grid 5 0 02NOV05 08NOV05 11 Integrate / Test Flig
Sheet 15 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.9.8 ENVIRONMENTAL TEST 4.1.9.8.1 MANAGMENT & ENGINEERING 4.1.9.8.1.2 MEETING SUPPORT
9I024429A 9I024422 9I024431 NRL General Facility Usage / Planning FY05 NRL General Facility M & S NRL General Facility Usage / Planning FY06 193* 58* 58* 60 01MAR05A 01DEC05 0 03OCT05* 23DEC05 0 03OCT05* 23DEC05 524 49 508 NRL Gene NR NR
4.1.9.9 SCIENCE VERIFICATION, ANALYSIS & CALIBRATION 4.1.9.9.5 FLIGHT UNIT 4.1.9.9.5.2 INFRASTRUCTURE
9I025896 SVAC Support Lat Operations 3/1/05 - 12/05 209* 72 01MAR05A 23DEC05 114 SV
Sheet 16 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.A PERFORMANCE AND SAFETY ASSURANCE 4.1.A.1 PERFORMANCE ASSURANCE MANAGEMENT 4.1.A.1.2 TRAVEL
AP1001090 Travel: FY06 Q1 58 0 03OCT05 23DEC05 114 Tr
Sheet 17 of 21
Activity Description Pre-Environmental Test Review 1st Two Towers Ready for Calibration Ground Readiness Test #3 Ground Readiness Test #5 IOC S/W Release 1
Early Start
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 -55 566 566 Pre-Environmental Test Review 1st Two Towers Ready for Calibra Ground Readiness Test #3
4.1.B.1 PROJECT MANAGEMENT 4.1.B.1.2 MEETINGS & REVIEWS 4.1.B.1.2.2 IOC INTERNAL REVIEWS
BI00000320 IOC-CDR Discrepancy Closeouts 30 0 03OCT05 11NOV05 536 IOC-CDR Discrepa
4.1.B.4.5 IOC SYSTEM DEVELOPMENT 4.1.B.4.5.1 DEVELOPMENT MODEL (1st SET OF HW)
BI00000900 Develop Procurement Specification (1st set) 30 1 1 1 1 1 1 92 03MAY04A 11NOV05 0 03OCT05 0 28OCT05 0 28OCT05 0 28OCT05 0 28OCT05 0 28OCT05 03OCT05 28OCT05 28OCT05 28OCT05 28OCT05 28OCT05 -52 -42 -42 -42 -42 -42 -42 Develop Procurem (PR) 1st set Hardware & Softwar (REC) Servers (1st set) (REC) Workstations (1s (REC) Peripherals (1st (REC) COTS Software ( (REC) Network Hardwa BI451PR000 (PR) 1st set Hardware & Software BI00000910 BI00000920 BI00000930 BI00000940 BI00000950 (REC) Servers (1st set) (REC) Workstations (1st set) (REC) Peripherals (1st set) (REC) COTS Software (1st set) (REC) Network Hardware (1st set)
Sheet 18 of 21
Activity ID BI00001151
Early Start
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262 507 IOC/SAS I/F Initial Test
4.1.B.7 LAT INTEGRATION & TEST 4.1.B.7.1 QUALIFICATION UNIT TEST SUPPORT 4.1.B.7.1.1 FUNCTIONAL TESTS
BI00001330 BI00001340 Functional Test Modules A/B Functional Test Modules 1/2 15 15 0 03OCT05 0 24OCT05 21OCT05 11NOV05 493 536 Functional Test Modules Functional Test M
Sheet 19 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.C EDUCATION AND PUBLIC OUTREACH 4.1.C.4 EDUCATOR TRAINING 4.1.C.4.2 NSTA
CE400RB215 NSTA 12/05 5* 0 05DEC05* 09DEC05 518 NSTA 12/05
Sheet 20 of 21
Activity ID
Activity Description
Early Start
Early Finish
FY05 FY06 Total SEP OCT NOV DEC J Float 295 12 19263 101724 317 14 21285 1219262
4.1.D SCIENCE ANALYSIS SOFTWARE 4.1.D.4 SCIENCE SOFTWARE 4.1.D.4.2 ANALYSIS SOFTWARE
DS6MFC0210 Analysis Software support (FY 06) 36* 0 03OCT05 21NOV05 114 Analysis Softw
Sheet 21 of 21