2/24/2013
SCREEN
1 2 3 4 5
Dont Panic Switch Off All Electrical Equipment Dont Run, Walk Fast! Go to the Assembly Point Wait for the Final Instruction
2/24/2013
1. Previous Meeting 2. HSE Programs 3. HSE Statistics Performance per Area and Total 4. HSE Findings Summary Findings analysis- cause wise, Company, and Area HSE Findings by Company Reported Near Miss Evaluation by Findings Score
2/24/2013
NO.
ITEMS
ACTION PLANS
Everyone is invited on activity today, all staff are join and support pp the 2013 HSE Objectives j advised to j by affixing their signature on the banner, and demonstrating their commitment in HSE objectives.
ACTION BY
DUE DATE
STATUS
Banner Signing S
____
Information I f ti
Hwachon although on initial phase with their Low Submission construction will promote submission of HSE of HSE Findings findings and aim to exceed from the total findings reported by HSJV and KEPCO. Seobon once again tops HSE findings after ratings are applied on all raised issues. The organization will revert back on next meeting on their planned countermeasures. Copy of the emergency evacuation for identified non-permit required confined space at Power Block will be forwarded to ENEC HSE Mr. Chris. The entry access is located through a hole in dense set of vertical rebars.
Hwachon
Next Meeting
Seobon
Next Meeting M ti
HSJV
Done
Description : Banner signing day last 18 Feb. 2013, 11:30 to 1:30 PM. Staff and Management participated in the campaign for 2013 HSE Objective. Senior Management personnel show their commitment for a safe construction.
BARAKAH NUCLEAR POWER PLANT PROJECT
2/24/2013
Installed 0 1 0 1
Stand by 5 3 NA 8
No. of winch (for emergency rescue) : 9 winch is available when emergency situation.
Description : Non - permit required confined space, retrieval system. Available number of Nonwinch at site that can be used as retrieval of personnel during emergency at limited entry vertical access confined space.
BARAKAH NUCLEAR POWER PLANT PROJECT
2/24/2013
Thi slide This lid is i to t be b presented and discussed by HSJV Electrical Team.
BARAKAH NUCLEAR POWER PLANT PROJECT
2/24/2013
Methods of Communication :
1. Safety Alerts 2 Tool box meetings 2. 3. Notice boards 4. MeetingsMeetings daily, weekly, monthly 5. Incident reports 6. Others
Description : The manner HSE issues are communicated from site. Site Manager of Subcontractor should lead in the transfer of information. All HSE issues and instructions should reach workers and understands the message correctly.
BARAKAH NUCLEAR POWER PLANT PROJECT
2/24/2013
Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property/Vehicle Accidents Environmental R l Release
0 0 0 0 1 0 0 0
0 0 1 0 1 0 1 0
0 0 0 0 0 0 0 0
0 0 0 0 1 0 1 0
0 0 0 0 0 0 0 0
2 0 0 2 0 0 1 0
0 0 2 1 0 0 2 0
5 0 4 3 1 0 3 0
0 0 0 0 0 0 0 0
0 1 2 0 0 0 1 0
0 0 0 0 0 0 1 0
0 0 2 0 0 0 2 0
0 0 2 1 1 0 3 0
7 1 9 5 3 0 9 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Cumulative 109*
Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 4 (2013)
Area
SUBCON
350
KEPCO&HSJV
SUBCON
Ancillary Area Camp Area Office Area Power Block Village 1 Village 2
5 4 5 5 5 5
52 20 74 318 77 16
8 16 5 51 6 0
44 4 69
300
267
250
200
150
267 71 16
69 51 6 Power Block
71
50
16 0 Village2
Total Findings
557
Office Area
Village1
2/24/2013
Issued Findings
K E P C O H S J V
S U B C O N
Status
Total
Open
KEPCO HSJV Subcon KEPCO
Closed
HSJV Subcon
0 3 0 3
0 3 0 3
0 0 0 0
0 0 0 0
0 0 0 0
0 43 40 83
2/24/2013
CAR/NM
0 0 0
Total
Signs,Barriers&barricades Access&Egress MaterialManagement PPE FirePrevention ElectricalSafety Plant&Equipment WorkingatHeight Scaffolding Lifting ColorCoding WasteManagement Health&Welfare Environmental Documents Hand&PowerTools Training FallProtection HotWorks PoorIllumination PTW ConfinedSpace
59 52 45 39 34 32 29 25 24 22 21 20 13 11 11 9 9 8 8 6 5 1
0 10 20
10
2/24/2013
1
Install barricade on open excavation ( RCB, Al Raeel) Provide details, warning signs on electrical distribution panel (Power Block, Gusan) Provide warning signage, and barricade on pipelines under hydro test (TGB, Younchang PB) Lifting works should be enclosed by barricade (Village 1, Hyundai C&I) Erect access way for personnel working at height (RCB, Advan) Removal of obstruction on access to substation (STC, Jonghap) Ensure ladder is secured as per industry practices (RCB, Seoyong PB) Clearing entrance of building from portable tools (Village 1, Eunmin)
2
Surplus electrical cable should be kept at designated place (ADB, Seobon) Water proofing materials must not be left in the working area. (TGB1, Isam Kabbani) Initiate arrangement of storage area at steel fabrication ex. A place for plywood (Ancillary, Yooa) Perform material arrangement in the area. (TGB, D&I)
Material Management
11
80 70 60 50 40 30 20 10 0
Seoyong Seoyong(PB) TowersTech Gusan Gusan(PB) Eunmin Jonghap Jonghap(PB) YounChang YounChang(PB) Hwachon WBG Hilalco Advan Hanlim Uwell YooA HyundaiC&I Samjin Eugene Daemyung Seobon D&I AlRaeel DOW Samho
BARAKAH NUCLEAR POWER PLANT PROJECT
2/24/2013
12
2/24/2013
FindingsScore=NumberofCausalxRisk(FactorScore) 10.0 9.0 80 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0
Source: CAR, Near Miss, Walkthrough and Observation Card reported by KEPCO & HSJV
70 7.0 6.0 3.8 3.6 4.1 2.1 2.2 0.2 0.9 2.9 1.5 1.5 0.2 3.6 1.0
13
2/24/2013
Health& Welfare,1
HotWorks,1
Signs,Barriers& Barricades,1
ColorCoding,1
Hand&Power Tools,1
El t i lSafety, S f t 1 Electrical
Access& Egress,11
Nos 11 9
Due Date
Always
g 4 Scaffolding,
Always
FirePrevention,6 Housekeeping,9
Supervision,1 Scaffolding,1
Nos 9 5
Training,2
Health& Welfare,2
Control Measure Removalofexcessconcrete intimelymanner. Arrangementofcables awayfromwetsurfaces surfaces. Install barricadeonopen excavation.Scaffolding surplusmaterialsshouldbe boundedbybarricade.
Due Date
Hand&Power Tools,2
Always
Plant& Equipment,2 Material Management,3 Access& Egress,3 FirePrevention,3 Signs,Barriers& Barricades,5 Workingat Height,4
Always
14
2/24/2013
Access&Egress,1 Training,1
Control Measure Management of housekeepingat constructionsite,and insidecamp p barricadeof Complete excavation,construction materialandstationary equipment.
Due Date
Signs,Barriers& Barricades,6
Always
PPE, PPE 4
Housekeeping,6
Always
Plant& Equipment,4 Lifting,2
15
2/24/2013
February 19,2013
CORRECTIVE ACTION:
February 19,2013
CORRECTIVE ACTION:
16
2/24/2013
CORRECTIVE ACTION:
17
2/24/2013
FindingsperCompany
5 4 3 2 1 0
Advan Geumhwa Hanlim Samjin Seobon Seoyong(PB) Uwell
Total
4 2 1 1 2 2 1 1
YounChang YounChang(PB)
FindingsperCausal
NoPPE LacksFirePreventionEquipment LacksTraining ImproperEquipment PoorGrounding LacksSafetyControl NoWorkPermit 0 1 1 1 1 2 2 2 3 6
18
2/24/2013
No.
Source of Injury
Area
Description
Immediate Action
Theabovementioned employeewashelpingto unloadsteelembeddedplate fromtheloadingbodyofpick Consult SteelFixer up.Duringthetime,oneplate Oral wasstackedwiththeother Backpain analgesic Powerblock platethenheappliedmore givenfor (laydown pressureandhisbackgot pain area) suspected t dli ligament tsprain. i Th The plateweightwasaround25kg 16022013 andhandledbytwopersons
Hilal Co.
11:20
19
2/24/2013
No.
Source of Injury
Area
Description
Immediate Action
HSJV Workshop
TowerCrane Operator PowerBlock 17022013 17:00 Workersrightknee washitbyaslow movingcrane trolley.
Pain,Right knee
Analgesicspray applied Elasticbandage applied Icecompress done Oralanalgesic given Mefenamic Acid
No.
Source of Injury
Area
Description
Immediate Action
Hewasdoinghis surveyactivitieson Surveyor thegroundlevel DoctorReferral Hitting his A&Bareawhen rightlower tooutsidefor PowerBlock suddenlyahand back further RCB/ABArea cutterfellfromthe portionof treatmentina groundhittinghis hisear Hospital. 17022013 rightlowerback portionofear. 10:00
Seoyong
20
2/24/2013
No.
Source of Injury
Area
Description
Immediate Action
YooA
Whilehesteppedonthe Elastic cabinsstair,hislegslipped Bandageapply andhelosthisbalance Ancillary, Pain,Rt withsplint and fell down with Steel Ring& Referralto 4 Fabrication weldingmachine.Hisright Smallfinger Hospitalfor handring&smallfingers Shop Swelling further trappedinbetween evaluation weldingmachineand 18022013 CheckXray. ground. 15:40 Welder
21
2/24/2013
Intersectionbetween rebarshopandwarehouseinancillaryarea Allcontrolvalvesareexposed topotentialaccident/incidents without fenceandsignagearoundthe STPFacility Installthefenceandpropersignage topreventaccessofunauthorized personnel OPEN
BARAKAH NUCLEAR POWER PLANT PROJECT
22
2/24/2013
CLOSED
BARAKAH NUCLEAR POWER PLANT PROJECT
23
2/24/2013
No.0
Date
Action by Company
Description
Status
Closing Date
Expiration Date
Ref. No.
Main Area
Sub-Area
Issued By
Issuer Company
UA/UC
20Feb13
Hilalco
Power Block
GIBArea
HSJV
Renato Ponce
UC
20Feb13
Advan
Power Block
RCBU nit2
HSJV
Renato Ponce
UC
24Feb13
HSJV O&M
KEPCO
Yang,Ji Young
UC
WASTETYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal Hazardous TotalSolidWaste
Lastweek
Recycle(%)
0 90 0 0 0 0 0 0 0 90 9.19%
0 0 0 45 0 0 0 0 0 45 3.86%
Legend: Collected WastefromSitetoTemporaryStorageArea Disposal WastefromTemporaryStorageAreatoLandfillArea Recycle Treatedwaste(GMET)toRecyclingPlants BARAKAH NUCLEAR POWER PLANT PROJECT
24
2/24/2013
25
2/24/2013