1. 2. 3. 4. 5. FIDIC Contract Form and type Applicable Contents Contents review End of Document
2013. 04. 26
1
1.
FIDIC :
1. 2. : Federal International des Ingenieurs Conseils : International Federation of Ingenieurs Conseils
TYPE
Conditions of Contract for Plant and Design-Build for Electri Yellow Book cal and Mechanical Plant, and for Building Engineering work s, Designed by the Contract : The Plant and Design/Build Co ntract Conditions of Contract for EPC/Turnkey Project : Silver Book The EPC/Turnkey Contract Short Form of Contract : The Short Form Green Book
2008
Conditions of Contract for Building and Engineering Works, Pink Book Designed by the Employer : The Construction Contract MDB Harmonised Edition Conditions of Contract for Design, Build and Operate Projec Gold Book ts 3
3. Applicable Contents
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. GENERAL PROVISIONS THE EMPLOYER THE ENGINEER THE CONTRACTOR NOMINATED SUBCONTRACTORS STAFF AND LABOUR PLANT, MATERIALS AND WORKMANSHIP COMMENCEMENT, DELAYS AND SUSPENSION TESTS ON COMPLETION EMPLOYERS TAKING OVER DEFECTS LIABILITY MEASUREMENT AND EVALUATION VARIATIONS AND ADJUSTMENTS CONTRACT PRICE AND PAYMENT TERMINATION BY EMPLOYER SUSPENSION AND TERMINATION BY CONTRACTOR RISK AND RESPONSIBILITY INSURANCE FORCE MAJEURE CLAIMS, DISPUTES AND ARBITRATION
4
1.4 Governing law and Language( ) (Substantive Law) (Procedural Law) (Local Jurisdiction) 1.5 Priority of Documents( The Particular Conditions - Part A,B The General Conditions The Specification, The Drawings, and the Schedules and any other documents
6
5. The Employer() 2.1 Right of Access to the site() , Contractor Procedural Law Claim . (a) Time(or times) (b) , Contractor However .
1. 2. Check Point Project case study ?
1.
Check Point
6. The Engineer() 3.1 Engineer Duties and Authority Impartial . , Employer Agent . 3.3 Instruction of the Engineer
2working days
7. The Contractor() 4.1 Performance Security() P-Bond . FIDIC Surety security . 4.3 Contractor representative( key person) Key person CV 4.7 Setting out()
7. The Contractor(Continue) 4.8/4.9 Safety Procedure/Quality Assurance 4.13 Right of way and facilities 4.15 Access Route 4.16 Transport of goods
7. The Contractor(Continue) 4.19 Electricity, Water and Gas REQUIRED DURING CONSTRUTION VS REQUIRED DURING TEST ON COMPLETION 4.21 Progress reports() MPR(Monthly progress report)
1. 2. Check Point
? Approach
8. Nominated Subcontractors() 5.1 Definition of Nominated Subcontractor Nominated Subcontractor Nominated Vendor Vendor Vs Supplier 5.2 Objection to Nomination
1. 2.
Remedial
Verification ? Validation ?
Quality assurance
Test
Check Point
Accept Rejection
10. Commencement, Delays and Suspension 8.1 Commencement of Works 8.2 Time for Completion 8.3 Programme
10. Commencement, Delays and Suspension 8.4 Extension of Time for Completion(EOT)
(a) a Variation (unless an adjustment to the Time for Completion has been agreed under Sub-Clause 13.3 [Variation Procedure]) or other substantial change in the quantity of an item of work included in the Contract, (b) a cause of delay giving an entitlement to extension of time under a SubClause of these Conditions, (c) exceptionally adverse climatic conditions, (d) Unforeseeable shortages in the availability of personnel or Goods caused by epidemic or governmental actions, or (e) any delay, impediment or prevention caused by or attributable to the Employer, the Employers Personnel, or the Employers other contractors
10. Commencement, Delays and Suspension(Continue) 8.6 Rate of Progress Expedite of Progress / Acceleration / Contingency work 8.7 Delay Damages L/D Liquidated damages Vs Penalty
11. Tests on Completion() 9. Test on Completion 10. Employer Taking Over( ) 11. Completion of Outstanding Work and Remedying Defects
MC Certificate PT Certificate Taking over Certificate
Warranty Period
Buying down Substantial Completion Or Final Completion Or Taking over of parts of the works`
Punch-list Priority