Sie sind auf Seite 1von 29

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

Pl Please Turn T off ff your mobile! Or Switch to vibration mode!

Check! Right Now!


BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

SCREEN

1 2 3 4 5

Dont Panic Switch Off All Electrical Equipment Dont Run, Walk Fast! Go to the Assembly Point Wait for the Final Instruction
BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

1. Safety Moment 2. Previous Meeting 3 HSE Programs 3. P 4. HSE Statistics


Performance per Area and Total

7. Weekly Inspection
Committee Inspection Weekly Inspection

8. Incident Report- NM 9. Medical Cases 10. Environmental Issues 11. Action Plans
Hanlim Seoyong (Infra) Jong Hap (PB) Seoyong RWC-CAR Status

5. HSE Findings Summary


HSE Findings by Company Evaluation E l ti by b Findings Fi di Score S

6. Findings Analysis per Discipline

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

NO.

ITEMS

ACTION PLANS
Both Seoyong (I), Jonghap (PB) reported none on HSE nonconformance but HSJV/KEPCO team spotted deviations in the area area. Both companies to present action plans on next meeting. Hanlim E&C group acquired high number of HSE findings with score of 4.5. This rating is based on established scoring by HSE Department that is proportional to the severity of given risk. The subcontractor will present on next meeting their corrective actions. HSE Manager inquired about Seoyongs action on last week RWC. Seoyong confirmed to verify status of corrective action.

ACTION BY

DUE DATE

STATUS

Low HSE Fi di Findings

Seoyong (I) Jonghap (PB)

Next Meeting M ti

DONE

High HSE Findings

Hanlim E&C

Next Meeting

DONE

Medical Case

Seoyong

Next Meeting

DONE

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

OtherPTWissues: WorkingwithoutapprovedJHA/PTW CompetencyofPermitHolders/Supervisor Relatedactions: ScreeningofPermitHolders,andPermit Issuers

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

Current Status Batches : 2, Attendees : 34


BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property/Vehicle Accidents Environmental Release

Ancillary Area For the Cum Week

Camp Area For the Cum Week

Office Area For the Cum Week

Power Block For the Cum Week

Village 1 For the Cum Week

Village 2 For the Cum Week

HSJV Total For the Cum Week

0 0 0 0 0 0 0 0

0 0 4 4 4 0 4 0

0 0 1 0 0 0 0 0

0 0 4 3 1 0 1 0

0 0 0 0 0 0 0 0

2 0 9 5 0 0 4 0

3 0 3 0 0 0 0 0

22 0 69 12 4 3 7 0

0 0 0 0 0 0 0 0

0 1 7 0 0 0 2 0

0 0 0 0 0 0 0 0

0 0 3 1 0 0 1 0

3 0 4 0 0 0 0 0

24 1 96 25 9 3 20 0

Forthisweek OneStrike Policy 2

Cumulative 136*

Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 31 (2013)
BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

Issued Findings
K E P C O H S J V
S U B C O N

Status
Total

Open
KEPCO HSJV Subcon KEPCO

Closed
HSJV Subcon

NearMiss CAR OC&WF TOTAL

0 1 0 1

0 1 0 1

1 13 0 14

0 0 0 0

0 0 0 0

0 7 32 39

2 178 289 469

20 178 199 32 289 321 53 469 523

BARAKAH NUCLEAR POWER PLANT PROJECT

7/28/2013

(This Week From July 20 July 26, 2013)


PPE Plant&Equipment Health&Welfare FirePrevention MaterialManagement Signs,Barriers&barricades Scaffolding WorkingatHeight FallProtection Access&Egress WasteManagement ColorCoding ElectricalSafety Hand&PowerTools Lifting Training HotWorks Environmental Supervision RoadSafety PoorIllumination Documents Excavation PTW ConfinedSpace LOTO SteelErection

0
0

3 3

5 5

9 9

10

15

20 19

22

24 24

26 26

29

31

34 33

39 38 37

Source: CAR, Near Miss, Walkthrough and Observation Card

10

15

20

25

30

35

40

45

BARAKAH NUCLEAR POWER PLANT PROJECT

1
Replace eye protection with blurred vision and scratch lens (Power Block, Advan Advan) ) Proper respirator, hand gloves when handling Bitumen compounds (Office Area, Seobon Seobon) ) Supervisor to use suitable eye protection when exposed to laser beams. (Ancillary Area, Hwacheon Hwacheon) ) Flagman must use the approved vest color (Power Block, WBG) Provide spill containment tray for threading machine. 1 Towers Tech) (Village 1, Warn all drivers to fill in equipment checklist prior start of work (Batching Plant, Eugene) Install anti-whip arrestor for concrete pump truck discharge pipe line. (RCB1, Seoyong) Seoyong) Ensure limit switches for MEWP are installed and working .(O&M, Al Inayah)

2
Regular suction or disposal g p of toilet sewage waste (Power Block, Advan Advan) ) Provide first aid kit at the workshop (Village 1, WBG) Provide rest shelter for workers at site (Mixing Basin, Al Raeel Raeel) ) Inform worker not to use drinking water for washing hands (Office Area, Seobon) Seobon)

PPE

Plant and Equipment


BARAKAH NUCLEAR POWER PLANT PROJECT

Health and Welfare

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

Findings perDiscipline Piping


Mech 49 10% 28 5% Arch(I) 100 19%

Village1 42 8%

FindingsperArea
AncillaryArea 75 14% CampArea 6 1%

Elec 67 13%

OfficeArea 81 16%

Civil 87 17%

Arch(PB) 189 36%

PowerBlock 316 61%

BARAKAH NUCLEAR POWER PLANT PROJECT

10

7/28/2013

(This Week From July 20 July 26, 2013)

FindingsperCompany(ArchPB)
100 80 60 40 20 0 Advan D&I DOW Seobon Seoyong(PB)

93 43 15 4

FindingsperCause(ArchPB)
WorkingatHeight WasteManagement Training Supervision Si B i &B i d Signs, Barriers Barricades Scaffolding PTW PPE Plant&Equipment MaterialManagement LIfting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection Environmental ElectricalSafety Documents ColorCoding Access&Egress

34

3 3 1 6 6 4 5 4 2
0 5

10 14

12 11

13 21 13 11 14

40 35 30 25 20 15 10 5 0

38

FindingsperArea(ArchPB)
31 2 1 7 10 19 1 13 4 2 22 26 1 2 10

5 11
10

13
15 20 25

Corrective Action Clearing of rebars, cables, and other materials exposed at ground. Provide barricades at crawler crane and laydown area.
BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

FindingsperCompany(ArchInfra)
30 25 20 15 10 5 0

24

28

FindingsperCause(ArchInfra)
22
WorkingatHeight WasteManagement Training Signs,Barriers&Barricades PTW PPE PoorIllumination Plant&Equipment MaterialManagement LOTO LIfting Housekeeping Health&Welfare Hand&PowerTools FirePrevention FallProtection Environmental ElectricalSafety ColorCoding Access&Egress
0

2 4 1 2 1 5

16 7 3
Towerstech Uwell YooA

6 9

Hanlim

Seobon

Seoyong

10 2 7 7 7 10

11

FindingsperArea(ArchInfra)
50 40 30 20 10 0 AncillaryArea CampArea OfficeArea Village1

45 23 6 26

1 2
2

5 3
4

10

12

Corrective Action Spill containment trays to be provided for crane, and pipe threading machine. Arrangement of scaffolding, wooden materials scattered on ground.
BARAKAH NUCLEAR POWER PLANT PROJECT

11

7/28/2013

(This Week From July 20 July 26, 2013)

FindingsperCompany(Civil)
50 40 30 20 10 0 AlRaeel Athena Eugene Gusan Hilalco WBG

FindingsperCause(Civil)
WorkingatHeight

44 23 5 2 3 10

3 1 3 2 2 1 3 3 3 3

Training Signs,Barriers&Barricades RoadSafety Plant&Equipment LIfting

5 7 7 5 8 9 10

FindingsperArea(Civil)
35 30 25 20 15 10 5 0

Health&Welfare FirePrevention

31 19 3 2 6 4 5 3 5 5 4

Excavation ElectricalSafety ConfinedSpace Access&Egress

1
0 2

2 2 2 2

3
4 6 8 10 12

Corrective Action Expedite repair of water cooler intended for Hilalcos workers. Removal of stagnant water to prevent development of illness at site. Drivers and HSE personnel shall use equipment checklist prior start of work.
BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

FindingsperCompany(Mech)
20 15 10 5 0 Geumhwa Hwachon Samjin Seil Youn Chang Samho AlInayah

FindingsperCause(Mech)
WorkingatHeight WasteManagement Supervision Signs,Barriers&Barricades S ff ldi Scaffolding PPE PoorIllumination Plant&Equipment MaterialManagement LIfting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection Environmental ConfinedSpace Color Coding C l C di Access&Egress 0 1

16 10 2 11 4 4 2

1 1 1 1 1 1

2 2 2 7 7 6

FindingsperArea(Mech)
16 14 12 10 8 6 4 2 0

14 8 3 2 1 4 3 1 2 2 1 8

2 2

1 1 1 2
2 3

3
4 5 6 7 8

Corrective Action Complete main parts of scaffolding, scaf tag signed prior use of scaffolding. Use of eye protection when exposed to rays from laser machine, and engaged in high speed cutting machine for plywood.
BARAKAH NUCLEAR POWER PLANT PROJECT

12

7/28/2013

(This Week From July 20 July 26, 2013)

FindingsperCompany(Piping)
20 15 10 5 0 SungChang YounChang(PB)

19

FindingsperCause(Piping)
WorkingatHeight WasteManagement Signs,Barriers&Barricades ff ld Scaffolding RoadSafety PPE Plant&Equipment MaterialManagement Housekeeping HotWorks Health&Welfare FirePrevention FallProtection Environmental ElectricalSafety Color Coding C l C di 0 1

1 1 1 1 3 3 1 1 2 3 1 4 2 1 2 1
2 3 4 5

FindingsperArea(Piping)
25 20 15 10 5 0 AncillaryArea PBABUnit1 PBTGB1

20

Corrective Action Proper storage of gas cylinder in laydown area protected from exposure to sunlight. Follow reverse parking of vehicles at fabrication shop.
BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

FindingsperCompany(Elec)
40 30 20 10 0 Daemyung HyundaiC&I Jonghap JongHap(PB)

FindingsperCause(Elec)
17
WorkingatHeight WasteManagement Signs,Barriers&Barricades Scaffolding PTW PPE PoorIllumination Plant&Equipment MaterialManagement LIfting Housekeeping HotWorks Health&Welfare Hand&PowerTools FirePrevention FallProtection ElectricalSafety ColorCoding Access&Egress
0

30 17 3

3 1 2 2 1 1 2 1 2
2 4

8 4 4 5 6 8

FindingsperArea(Elec)
30 25 20 15 10 5 0

27 10 8 4 6 3 3

3 4 6 4
6 8 10

Corrective Action Follow safe use of ladder with one worker to assist and hold ladder at the base. Provision of safe working platform for working at height jobs.
BARAKAH NUCLEAR POWER PLANT PROJECT

13

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

60 50 40 30 20 10 0
4 6 3 6 9 2 3 4 3 2 51 41 34 30

26

24

21

17 5

14 1 1

16

BARAKAH NUCLEAR POWER PLANT PROJECT

14

7/28/2013

60
9,Housekeeping

50
5,Housekeeping

40 30 20 10 0

4,FallProtection 4,Access &Egress 5,Health& Welfare

RoadSafety ConfinedSpace PTW RoadSafety Excavation Documents Supervision Environmental Training ElectricalSafety 5,Housekeeping HotWorks 5,PPE Hand&PowerTools 4,Housekeeping LIfting 4,Health& ColorCoding Welfare WasteManagement 4,Housekeeping 3,Health& Signs,Barriers&Barricades Welfare MaterialManagement 4,Plant& Equipment Plant&Equipment FirePrevention Access&Egress WorkingatHeight FallProtection Scaffolding Health&Welfare PPE Housekeeping

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From July 20 July 26, 2013)

TowersTech

100 90 80 70 60 50 40 30 20 10 0
Seoyong Seoyong(PB)

KEPCO/HSJV SUBCON Manpower

800 700 600 500 400 300 200 100 0


DOW Geumhwa AlRaeel Samho Sungchang

Seobon

Advan

Hanlim

Hwachon

Samjin

Eugene

Jonghap(PB)

YounChang(PB)

BARAKAH NUCLEAR POWER PLANT PROJECT

HyundaiC&I

YounChang

Daemyung

WBG

Jonghap

Hilalco

Gusan

YooA

D&I

15

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

FindingsScore=NumberofCausalxRisk(FactorScore) 8.0
6.3
Source: CAR, Near Miss, Walkthrough and Observation Card reported by KEPCO & HSJV

6.0 4.0 2.0


0.0 2.6 2.5 3.2 2.2 1.2 2.5 1.5 0.4 2.8 2.0 1.0 1.2 0.7 1.5

0.0

Legend : (I) Infra, (PB) Power Block

ActionPlan forCompanyrequiringassistanceandsupportfromthesystem 1.JointInspection willbecarriedoutbyAreaManagementTeam. 2.SpotTrainingwillbegiven toworkersaboutmajorfindings 3.Actionplanwillbe submittedtoHSJVHSETeamdevelopbyTOWERSTECH


BARAKAH NUCLEAR POWER PLANT PROJECT

16

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

Total No. of Findings : 16


Top Hazards Cause Plant&Equipment WasteManagement Nos 5 4
Health& Welfare,1 LIfti 1 LIfting,

Signs,Barriers& Barricades,1

Plant& Equipment,5

Control Measure Ensuretoturnoffswitchof equipmentbeforeleaving andwhennotinuse. Soilprotectionagainst concretewasteshouldbe providedduringconcrete works.

Due Date Done

Hand&Power Tools,1

Always

PPE,1

Housekeeping,1 FallProtection,1

Waste Management,4

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

17

7/28/2013

Scaffolding,4

Total No. of Findings: 23


Top Hazards

Poor Illumination,1 ConfinedSpace,1 Access&Egress,1 Waste Management,1 ElectricalSafety,1 Plant& Equipment,4

Cause Scaffolding Plant&Equipment

Nos 4 4

Control Measure

Due Date

Ensurethatscaffoldingare inspected andprovidedwith greentagbeforeuse. Equipmentmustbe inspectedandcolorcoded beforeuseonsite.

Done
Hot Works, H tW k 1

Done

ColorCoding,1 Supervision,1 RoadSafety,2 FirePrevention,3

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

Hand&Power Tools,2

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

18

7/28/2013

Inspection Committee Inspection Weekly Inspection

Date 2013-07-23 2013-07-24

Attendees HSJV, KEPCO, HSE Management Team HSJV HSE Team

Remark 1 Finding 6 Findings

BARAKAH NUCLEAR POWER PLANT PROJECT

FindingsperCompany
3 2 1 0

2 1 AlInayah Hanlim

2 1 Towerstech YounChang

FindingsperCausal
PoorMaintenance NoInspection NeedsTraining NoSignages

2 2 1 1
0 1
BARAKAH NUCLEAR POWER PLANT PROJECT

Key item : MEWP


2 3

19

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

AREA : Power Block, Advan

25 June 2013

CORRECTIVE ACTION:

PLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

20

7/28/2013

AREA : GIB, Seoyong

25 July 2013

CORRECTIVE ACTION:

PLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

AREA : GIB, Jonghap

21 July 2013

CORRECTIVE ACTION:

PLANNED SUPERVISOR PREVENTIVE ACTION

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

21

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

D&I Whiledoingrebar RebarWorker activity,rebar suddenlyslippedandIPs PowerBlock glovescaughtinbetween slingbelt TGB1 andrebar. rebar Hisleftthumb gotinjured. 21072013
21:15

Injuryleft thumb.

Proper AssessedbyDr.Kim coordination Woundcleaningwith between salinedone riggerand Withdressing worker application Useof AnalgesicIMmedicine crowbarto given i disengage Referredtohospital trapped rebars

BARAKAH NUCLEAR POWER PLANT PROJECT

22

7/28/2013

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Laundryworkerentered theroomandhave Personnelwere LaundryBoy argumentwithIPwhich advisedtoreport promptedtheworkerto AssessedbyDr. any Kim Sprainleft StaffCamp disagreements. pushIPandloses Referredto lateralankle LaundryRoom Scheduleof balancewhich hospitalforXRay dryingisset accidentally yfellonthe whenACis floorandsustainedpain 21072013 unavailable. onhisleftankle.
08:00

JONGHAP

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

IPwithhisteam performedtherebar RebarWorker erectionactivity. Reportedly,IPhadhis Minormiddle PowerBlock finger middlefingercaughtin AB1Unit4 laceration betweentherebars causingminorlaceration 21072013 tothesaidfinger.
20:45

ADVAN

Useof appropriate AssessedbyDr.Kim handgloves. Woundcleaningwith Proper salinedone coordination Withdressing between application riggerand Analgesic g IM workers. k medicinegiven Awarenessof workersto givenhazards.

BARAKAH NUCLEAR POWER PLANT PROJECT

23

7/28/2013

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

SHINWOO
H/EPainter
4

Righteyepain PowerBlock withforeign AB1 body 22072013 10:00

Whiletakingarestin frontofventilationfan hedidnotnoticethata AssessedbyDr.Kim housekeeperissweeping Eyewashingwith salinedone thefloorandthe accumulatedduskflew Eyedropsmedication given g directlytohimthat causedirritationtohis eyes.

Settimeto performdaily cleaningof restrooms. Provide housekeeping toolsto collectdirton floor dustpan, etc.

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

24

7/28/2013

Opening Meeting

NMDC Dredging Area

Heavy Equipment Shop

Power Block

Ancillary

Batch Plant

Description CEMP 3 rd Party Audit Conducted on 24 th .July.2013 1 Moderate finding for NMDC and 2 Minor findings for HSJV The draft audit report will be issued on 3rd.August.2013
BARAKAH NUCLEAR POWER PLANT PROJECT

Issuedon11.July.2013 Waiting gspare p p partsfromUSA


Location Description Action taken Status
Marine Works Wharf Phase 2 Crawler Crane on barge observed discharging heavy black smoke while dredging works. Ensure to conduct preventive maintenance according to manufacturers specification OPEN
BARAKAH NUCLEAR POWER PLANT PROJECT

25

7/28/2013

No.0

Date

Action by Company

Status

Closing Date

Expiration Date

Ref. No. CAR

Main Area

Sub-Area

Issued By

Issuer Company

11 July 2013

Athena

Crawler Crane on barge with body number LIMA 2400-B observed discharging heavy black smoke from the exhaust system while dredging works in progress which contributes to degradation of ambient air quality.

OPEN

16 July 2013

16 June 2013

1621

Wharf

Phase 2

Renato Ponce

HSJV

BARAKAH NUCLEAR POWER PLANT PROJECT

WASTETYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal p Hazardous TotalSolidWaste

WASTEMANAGEMENTUPDATE Week=18/07/2013 25/07/2013 Thisweek


Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

Lastweek
Recycle(%)

Collected(m3) Disposal(m3) Recycled(m3)

48 32 104 0 0 176 96 0 0 456

0 0 675 0 0 90 0 336 0 1,101

45 0 0 0 0 0 0 0 0 45 9.87%

56 24 88 0 0 104 72 0 8 352

0 0 405 0 0 45 0 376 8 834

0 45 0 0 0 0 0 0 0 45 12.78%

Legend: Collected WastefromSitetoTemporaryStorageArea Disposal WastefromTemporaryStorageAreatoLandfillArea Recycle Treatedwaste(GMET)toRecyclingPlants BARAKAH NUCLEAR POWER PLANT PROJECT

26

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

27

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

28

7/28/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT BARAKAH NUCLEAR POWER PLANT PROJECT

29

Das könnte Ihnen auch gefallen