REFURBISHMENT OF FSPU CAMPUS, UITM SHAH ALAM TOWARDS GREEN BUILDING APPROACH

PROJECT EVALUATION AND DEVELOPMENT PROJECT BRIEF March 2013

PROJECT EVALUATION AND DEVELOPMENT Session : March 2013 Theme :


REFURBISHMENT OF FSPU CAMPUS, UITM SHAH ALAM TOWARDS GREEN BUILDING APPROACH

PMC

Prof Madya Sr. Ruslan Affendy Arshad En. Muhammad Kamal Ahmad Prof Madya Ngah Yahya Embong Hj. Khalid bin Yusof Group Brig.Gen.Hj Mohd Amin Din Pn. Farrah Norizzah Mohd.Yussof
Zarina Alias

Coordinator: Moderators :

A B C D

PM Zuraidah Abas Pn. Farrah Zuhaira Ismail Azizan Abdul Aziz En. Shazwan Mohd Saari PM Hj. Jamaluddin Md Aris Siti Suhaida Sahab Zainab bte Nordin Hj Khalid Yusof Dr Zalida Salleh
Introduction :

The chosen theme for this semesters PED course is refurbishment of Faculty of Architecture, Planning and Surveying, UiTM Shah Alam. The course will provide opportunities for the final year undergraduates to work as a team in producing a suitable proposal to plan, design and develop project which is beneficial to the client. Background:

In 1971 the School of Arts and Architecture had undergone major reorganisation, and this led to the establishment of two separate schools; one, which emphasized on the built environment, and the other on the arts and design. Subsequently, the built environment school was named as the School of Architecture, Planning and Surveying which was later known as the Faculty of 2

Architecture, Planning and Surveying. However, the Malay acronym "FSPU" (which stands for Fakulti Senibina, Perancangan dan Ukur) is commonly used within UiTM. Located at Shah Alam and within the Klang Valley, the faculty has gained its reputation as one of the pioneering institutions which offered courses in the field of the built environment. At present, the faculty comprises 11 academic deparments running 29 academic programmes ranging from diploma, undergraduate to postgraduate level of study. Currently, the student population exceeds 11,000 undertaking courses in Shah Alam, Seri Iskandar, Arau and Kota Samarahan campuses. In view of this development, there is a need to upgrade the faculty to a better standard in terms of providing infrastructure and facilities. This measure will enable the faculty and staff to move forward for achieving the mission to place UiTM in the world map.

Project Requirement Undergraduates are required to prepare a proposal to Board of Excutive, UiTM Shah Alam. Among the elements to be considered for development are: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Objectives 1. 2. 3. 4. 5. 6. Scope 1. Upon embarking the LRT project, Uitm has been given a grant to upgrade the facilities for the University. You are the Design and Built Contractor who 3 To promote creative ideas in redesigning of complex for future use. To expose students with the technique and procedure of refurbishment project. To evaluate the economic impact from the project. To study the legislatives planning, procedures and process of refurbishment. To identify the benefits of project to the students, faculty and Uitm. To identify various activities can be held to promote the faculty. Accessibility Circulation/parking Public Amenities Security Facility for Disable Commercial areas Sanitary System and Health Administrative Buildings/Library/Lecture Theatre/Studio/Classroom Sport Facilities Recreational Facilities Training/IT Center/Child Care Center/R&D Center Others ( add-on components which compliment the development)

is required to prepare a proposal based on the Clients need statement and submitted to the Board of Executive, UiTM Shah Alam for approval. The complex shall be refurbished to accommodate 5000 students and 500 lecturers. You are required to upgrade the existing buildings and infrastructure works due to parking problems. You are also required to apply new concept of development such as Sustainability, IBS, Renewable Resources and ensure to 50% of the area is still Green.

Task 2. 3. 4. 5. Students have to work in group, maximum of 5 members. With the assistance of supervisors, students are required to perform site visit (Local or Oversea) for initial study related to the theme. To choose the FSPU actual site for the development. To perform group presentation during the interim evaluation and at the end of semester and submit comprehensive project proposal on the day of presentation.