Beruflich Dokumente
Kultur Dokumente
1860 - 1953 9 1860 Thomas Armstrong starts production of cork t taps for bottles in the U.S. 1899 Co k sheets show Cork sho excellent insulation performance: first Armstrong Patent for production cork insulation l b boards d 1953 Armstrong develops Armaflex in U.S.
1954 - 2000 The oil crisis of the 70s increases the demand of energy saving products... 1984 Introduction of Tubolit (PE-Insulation for H&P) 1989 CFC free Production of Insulation Products 1990 1999 Development of product solutions for specialised p application areas (UVResistant, Halogen Free, ) 2000 Armstrong concentrates on core businesses and sells the insulation branch
Year
25 mm Other Elastomeric = 1000,, ( (WVP 0.1 Perm-in) ) Electric % of Electric Electric different K Heat gain different Cost (THB) cost (THB) (W/(m.K) (W/m)
0.0369 0.0418 0.0468 0.0518 0.0568 0.0618 0.0668 0.0718 0.0768 0.0818 7.54 8.43 9.30 10.15 10.97 11.77 12.55 13.31 14.05 14.78 33.05 36.90 40.73 44.44 48.06 51.57 54.99 58.32 61.56 64.72 0.00 3.14 6.17 9.10 11.93 14.67 17.31 19.87 22.35 24.74 129.29 0% 9% 18% 26% 33% 40% 46% 52% 57% 62%
1 2 3 4 5 6 7 8 9 10
AVG
Ttl Total
*Forcalculationmethodpleasecalltotechnicalteam
HotelTheVenetian Macau,constructed since2007 FMapprovedproject Class ClassO O firespec. spec Max.125mmClassO Armaflexforchilled water t pipe i Armafixwasusedtoo
Proven performance
IKEA&MegaBangna
Thebiggestdesign furnituresolutoinin ASIA. Floorarea40,000m2 Over24,000m2 ArmaflexSheetwillbe installedforairductand 5,000mtubeinchilled waterpipe
Proven performance
ParkVenture,Bangkok Ecodrivencomplex Floorareaover 81,000m2 Over20,000 20 000m ArmaflexTubewill beinstalledforair duct LEEDPlattinum Certificate
Proven performance
RafflesPlaza,Chengdu Investedby CapitaLandtobe completedin2011 Floorareaover 300,000m2 Over30,000m2 Armaflexwillbe installedforairduct LEEDGoldCertificate
Proven performance
MaritinAir HQ newMartinAir HQat S hi h l Schiphol Airport,Amsterdam 19mmand25mm Armaflexforduct insulation Armaflexforchilled waterpipe LEEDcertified
ProvenPerformance
ProvenPerformance
ProvenPerformance
ProvenPerformance
Proven Performance
BirdNest 2008Beijing OlympicsMain Stadium 65,000 , mArmaflex tubeforchilledwater pipeinsulation 87,000m2 Armaflex sheetinstalledforair ductinsulation.
ProvenPerformance
GuangzhouWestTower 440mhigh,The6th highestbuidingin theworld 103 storieswitharea upto247,000m2 Besidesinsulaitonfor pipes,over100,000 m2 Armaflex installedforairduct
ProvenPerformance
TorreAgbar,Spain 130millionEuro project,Barcelona Atotalfloorspaceof 39,000 , m 2 15,000m2Armaflex forairductinsulation 14 14,000 000mArmaflex A fl tubeforpipe insulation
ProvenPerformance
BelfastCityHall Builtin Belfast,UK,1906. Spacewasa particularissue. issue 25mmArmaflex installedasthermal andacousticduct liner.
ProvenPerformance
Proven Performance
NewOrleansSuperdome TheSuperdome repairprojectcost $300millionbecause ofdamagecausedby H i Hurricane K Katrina. ti Forrepairand replacementjob, 80,000ft f 2 Armaflex f wasinstalledasduct linerforbetterIAQ.
ProvenPerformance
Airport,Shanghai PudongInternational AirportPhaseIandII, Hongqiao Transportation C t for Center f SHEXPO. EXPO Atotalof300,000m2 Armaflexwas installedfor f pipeand ductinsulation
ProvenPerformance
ProvenPerformance
ProvenPerformance
ProvenPerformance
For more information p please visit to www.armacell.com or contact to : info.th@armacell.com Tel. : + 66 32 353 205 to 7