Oct.-2006 DATE
0 REVISION
M.D PREPARED BY
GS REVIEWED BY
SB APPROVED BY
A.J.P.E
Table Of Contents
1. 2. 3. 4. 5. 6. 7. 7.1 7.2 7.3 8. 9. 10. PROCEDURE No. SCOPE AND PURPOSE APPLICABILITY RESPONSIBILITY GENERAL DEFINATION CONTRACT REVIEW POST-AWARD Receipt and Distribution of Contractual Documents Review of Contractual Documentation Amendments RECORDS REFERENCES ATTACHMENTS
A.J.P.E
1.
PROCEDURE No.
P101S
2.
3.
APPLICABILITY
All Bids and contracts, all Areas , Post Award.
4.
RESPONSIBILITY
. . . . . . . Area Manager Project Manager Heads of Departments/Divisions Vice President Engineering Vice President Operations All Members of the Project Team Project Accountant
5.
GENERAL
The Project Manager and his team shall review the contract and ensure that all the elements of the contract were addressed in the proposal and that all Customer instructions and requirements have been addressed.
6.
DEFINATIONS
Contractual Documentation: Documentation embraced by the formal agreement between Organization and Customer , for the purpose of carrying out the given works. Contractual Documentation includes legal, commercial and technical documents, as well as the related correspondence.
A.J.P.E
Area Accountant
7.
If as a result of the Review , any of the above items should require clarification or amplification . The Project Manager shall inform the Customer accordingly by means of properly complied Technical Query Forms, P101S-2, and maintain the queries pending until all questions are satisfactorily answered.
A.J.P.E
Receipt and Distribution of Contractual Documentation All Contractual documentation ( including commercial and technical correspondence ) received from sources shall be handled in accordance with the A.J.P.E. Quality Assurance Procedure P 102 Document and Data Control, or by Project Specific Procedures, where and when applicable. All contractual documents received shall be checked against their transmittal forms for correctness. After receipt of the documentation form the customer, the Project Manager shall delegate the task of the review to the relevant Project Personnel. Review Of Contractual Documentation The Project Personnel shall review all the documents, with respect to their conformity with the scope of work under contract, congruity with previously established design, commercial implications and Technical acceptability of any necessary additional deviations. Such deviations shall be reported to the Customer as Technical Quires , as described in the following section. Paragraph Deleted Each discipline shall maintain a file of relevant documents of their interest or shall have free access to documents, which are applicable to their Scope of Work. Amendments Any necessary deviations from the contractual documents imposed by the site conditions or incompatibilities in standards shall be reported to the Project Manager and relayed to the Client/Consultant for his review and response. A Technical Query Form, Form P101S-2 shall be used for this purpose. Upon receipt of the reply to the technical queries from Customers , a copy shall be sent to the originator and QA/QC Engineer. The Project Manager and /Planning Engineer and the Quantity Surveyor shall review the original. The Planning Engineer shall determine if the action proposed by the Customer will have a schedule impact. The quantity Surveyor shall determine the cost impact of the proposed answer to the query, if any. Should a cost or schedule impact be anticipated, the Project Manager shall send a letter to the Customer in this regard. Similarly, any necessary deviations from the contractual documentation imposed by incompatibilities in basic design , standards, codes & specifications shall be reported to the Project Manager and a Wavier request shall be sent to Customer for review and response. A Waiver Request form P101S-4 shall be used for this purpose and shall be completed with all supporting information, justification, cost & schedule impacts etc.
A.J.P.E
A Technical Query Log form P101S-3 and Waiver Request Log form P101S-5 shall be regularly reviewed and updated . For major change orders or cost impact the Project Manager shall report and liaise with the Area Manager or Estimating Department. Based on the changes, the Head of the Department may initiate a new contract review. For major cost impact a report shall be submitted to management detailing the technical and commercial aspects. A Copy of the variation order will be addressed to the following : . . . . . . . . 8. Head Office Accountant Estimation Department When applicable, the Bank of revision of the value of the Performance Bond. Chief Executive Officer Vice President Engineering Vice President Operations Project Accountant
RECORDS The Project Manager with his Project Team shall ensure that proper records for the Contract Review are kept and maintained . Records shall be maintained in the Site office for the duration of the Project. Records shall be transferred to the Area Head Office after the achievement of the Project and kept for a period of Three Years.
9.
REFERENCES . . A.J.P.E. Corporate Quality Assurance Manual Procedure P102, Document and Data Control .
10
ATTACHMENTS . . . . . Form P101S-1, Contract Review Comments Form P101S-2, Technical Query Form P101S-3, Technical Query Status Log Form P101S-4, Request for Waiver Form P101S-5, Waiver Request Log
A.J.P.E
Project :
Page :
Part / Specification
Remarks
Action
Action By:
A.J.P.E
TECHINICAL QUERY
P101S-2
Project : Rev :
Discipline : Technical Query Subject : St. Steel Electrical Instruments Piping Civil Pipeline
A.J.P.E
Project :
Date Issued
Issued By
Reply Date
Cost Impact
Schedule Impact
A.J.P.E
PROJECT : CLIENT : LOCATION : REQUEST FOR WAIVER No : SYSTEM : 1. Waiver Description : Discipline :
2. 3.
YES / NO YES / NO
PROJECT MANAGER
SIGNATURE
DATE
SABTANK RESPONSE
NAME
P101S-4, Rev, 1, Date 18-05-2003
SIGNATURE
DATE
A.J.P.E
Project : Client : Date : Waiver No Date Issued Issued By Reply Date Page : Sheet : Cost Impact Schedule Impact Of Follow Up Letter