CVT-P03-12 (G+6 RESIDENTIAL BUILDING) PROGRESS MEETING NO.

07 HELD ON AT SITE OFFICE

zz" AUGUST

2013

ATTENDEES: S.N. NAME Mr. Rawad Assaf Zien Addeen Mr. Mohsen Ragheb COMPANY Mis. CVT Mis. RCC E-MAIL rawad@cvtec.ae M_O_H_S_E_N@hotmail.com MOBILE

1 2

0554743462 0506186073

Distribution: Mr. Jaree Ali Mr. Ezz Watzon

MIs. CV Tee - MIs. RCC

MINUTES OF MEETING

The following
ITEM

items were discussed:


DESCRIPTION Date Actior
I

1.0
1.1

Program of Work: Monthly report reflect the site situation to be submitted by RCC. Structural (column & slab) works: 6th Floor - Expected HC+P - originally scheduled on Expected 2013 The current Delay is 84 Days. 1-Sept-13

RCC

1.2

zs"

August 2013

so" June 2013


11th September

2.0 2.1

Material and Shop Drawings: Updated (Material + shop drawing + sub-contractors) submittal logs to be submitted. RCC undertake to submit all HVAC Material and Shop drawing next week. Delay in submitting drawing. the water supply revised shop 29-Aug-2013
RCC

2.2

26-Aug-2013

RCC

2.3

28-Aug-2013

RCC

2.4

Main entrance Marble reached in site. RCCto keep all material in safe place and cover it. Elevator's shop drawing to be revised and r.e~submit according to final approved drawings.

22-Aug-2013

RCC

2.5

28-Aug-2013

RCC

1:'/ :#
2.6 RCCasked for final ground floor dra{i'R
~ e,

/.

/",-,' ';:(."\~',. --:n~,., ().'1l-r'" r;" 11 . ~.


OE"",..,N 8; SUPERVI. IN

~,~,

~.

8-A Ig013
ONLy-'

2.7
2.8

~ (11':0. """,x :31'l10, Dunai U A E CV Tec approved cement blocks to t)~?(..\~d in Ground 2'2~~~2013

CVTec RCC RCC& Owner

floor bl,ock.wo:k.s.
Delay In finalizing the wooden works

~,E~I!..~El:J_3
selec

q~J:r
29-Aug-2013
2

lon-arTCF

contracts.

2.9 3.0 3.1 3.2

Rest of MEP materials to be submitted. 29-Aug-2013

RCC

Sub-Contractor:
Delay in submitting kitchen cabinet sub-contractor. 29-Aug-2013 29-Aug-2013
RCC RCC

Delay in submitting three quotations of garbage shut work, which is a provisional sum item. Delay in signing the contract with (Alkhwater General Maintenance LLC) as a nominated swimming pool subcontractor.

3.3

29-Aug-2013

RCC

4.0
4.1

Blocks and Plastering Works:


CV Tec asked for mockup flat of plaster work for approval with coordinate with all MEP and civil requirements. RCCto improve the block works quality in general. 26-Aug-2013
RCC

4.2 4.3 70% of block work of (i", 2 ,3 site.


nd rd )

24-Aug-2013

RCC RCC

floors done in the

5.0 6.0

RCCasked for the final ceramics selection. RCC asked program. for approval of the updated baseline

29-Aug-2013 29-Aug-2013

CV Tee and Owner

CVTec

7.0

CV Tec asked for method of statement pool structural works. Owner asked to cancel the Generator ground floor.

of swimming

29-Aug-2013

RCC

8.0

room

in the

RCC

9.0

RCCasked for an approved hard copy of sanitary ware shop drawing which sent by email on 9-Jul-29"Ja~~C~ .. '-'i""as a soft copy. /.:;~iV)..!Y:':W'l A '19-~Ll<T,,2013 /7 .. :;.'i',"~-'iI. '~"'.:o::"

CVTec

10.0