Sie sind auf Seite 1von 6

AZIZ ALIM aziz_alim@rediffmail.com Palm, azizalim@gmail.

com East, Mumbai

CORRESPONDENCE ADDRESS: 411, Summit Appartment, Royal Aarey Milk Colony, Goregaon Ph no. +91-9654984895 Passport No: - F7334637 OBJECTIVE

Looking forward to join an esteemed organization and work with a core team to provide cost effective and customer centric services using technical and interpersonal skills for the accomplishment of self as well as organizational goals. SYNOPSIS 1) An incisive professional with over 7 years of experience in Installation, Integration and Commissioning of Telecom and Networking Equipment with Client and Vendor management. 2) Managing project with interaction with different vertical like Technical, Pre-sales, AMC for the Customer Satisfaction and Project Execution within given time frame successfully. 3) Project Execution of RELIANCE 3G DELHI, ETISALAT DELHI, TTSL CDMA DELHI, TTSL GSM & UNITCH VELOCITY in UP WEST CIRCLE and VIDEOCON GSM in PUNJAB CIRCLE. 4) Overall Execution of ARMY Telecom Project (ASCON) consisting of Microwave and OFC. 5) Supervision of different contractors working for the Cable pulling,

Termination/Installation, Acceptance Testing and Maintenance of the optic fibre cables for the FTTX roll out. 6) End to end testing of fiber optic cables which is connected to the ATM Backbone Switches for any Losses. 7) Experience of installation, commissioning and integration of NEC IPASO200 Equipment, 3100 and 3400 series NSN ATM switches and Siemens HIPATH 4500 Series Equipment, Alcatel SDH Equipment, OFC, Microwave and E1 Link in the Network. 8) Hands on experience on OTDR, Power Meter, Source Meter and Visual Fault Meter.

9) Experience of Planning of transmission Access/ Back bone network and Up gradation of 2G Network to 3G Network. 10) Worked in the integration of NMS of Microwave Radio using Alcatel omni 512

Router so that it can be accessed in NOC Delhi. 11) Monitoring projects with respect to Budgeted Cost, demand forecasts, Time over-

runs to ensure timely execution of projects with effective resource utilization to maximize the output. 12) Working Knowledge of LAN, WAN, TCP/IP, ROUTING PROTOCOL (OSPF). Having

Working experience as a team member of FMS.

ACADEMIA Bachelor of Technology (Electronics & Communication) from M.J.P. Rohilkhand University, Bareilly, U.P., in 2005 with D.G.P.A.: 7.36/10. SSC from DMPS, Raebareli, with C.B.S.E. Board in 2000 with: 79.20%. HSC from DMPS, Raebareli, with C.B.S.E. Board in 1998 with: 68.80%. INDUSTRIAL EXPERIENCE 18th Dec. 2009 Till date Organization Name: NEC (I) PVT LTD Designation: Sr. Engineer-Projects Project: TTSL DELHI CDMA, TTSL ETISALAT DELHI, RELIANCE 3G DELHI & VIDEOCON (PUNJAB) PROJECTS. PROJECT DETAIL: Worked on the Implementation of the TTSL CDMA DELHI, TTSL ETISALAT DELHI, RELIANCE 3G DELHI & VIDEOCON (PUNJAB) GSM for PUNJAB Circle, Coordinating with Vendor for the I&C and Customer for NOC Activity and other project related activities. JOB DESCRIPTION: Planning of transmission Access/Back bone network All the Project Management activities like Publishing DPR, Material Reconciliation Report. Up gradation 2G Network to 3G network.

Responsible for monitoring and maintenance NEC SDH Radio and NEC SDH Optic fiber back-bone links till the Final Acceptance Test by Client. Installation commisioning and integration of MW link for NEW BTS on field. Plan for backup connectivity for the MW links with ring protection to avoid outage Guide the Installation team for implementation of critical Microwave links. Customer Interaction for Transmission Needs. Involved in carrying out preventive and corrective maintenance on NEC 34 Mb/s and 140 Mb/s PDH radio equipments Other Passive Infra Such as Battery Power Plant Troubleshooting at the time of implementation. Client Management Involved in Design and Implementation of Projects for external clients Vendor Management Experience with end to end E1 testing Plan and implementation of work for task completion and supervision of subcontractors work.

10th Aug. 2009 9th Dec 2009 Organization Name: TRIADSS SOLUTION (3rd Party Payroll of NEC (I) Pvt Ltd.) Designation: Project Coordinator Project: UNITCH VELOCITY & TTSL GSM (UP WEST CIRCLE) PROJECT DETAIL: Worked on the Implementation of the Unitech Velocity & TTSL GSM for UPWEST Circle and as Coordinator, Coordinating with Vendor for the I&C and Client for other project management related activities. JOB DESCRIPTION: 1. Client Management. 2. Vendor Management. 3. Project coordination & execution. 4. Manage day to day project activities & resolve all project execution issues. 5. Coordinating with operator such as TTSL for the Project information. 16th Dec. 2006 9th Aug 2009 Organization Name: Indian Telephone Industries Ltd.

Designation: Engineer -Projects Project: ASCON (ARMY STATIC COMMUNICATION NETWORK) PROJECT DETAIL; Worked on up-gradation of Indian Army Communication Network ASCON phase-3 project for which a HPNNI based ATM Network was planned consisting of Siemens Surpass 3100 & 3400 series ATM switches were being installed for backbone of the network and ISDN (Hi-path 4500, Siemens) switches for access side and integrated and redundant NMS at Delhi was provided for Smooth management of whole network. . Worked on installation of Alcatel routers (omni access 512) for the connectivity of Microwave NMS at Delhi using OSPF protocol. KEY FEATURES OF ASCON PROJECT; Turnkey Project. Spread across entire country. Establishes backbone for Army Communication. Has overlay network consisting of OFC, Microwave and Satellites for redundancy. Deals with Voice, Data and Live video streaming as per Army requirement. ATM switch is used at the network side for networking at the user interface and ISDN switches are used on the subscribers side. JOB DESCRIPTION; Worked as NOC Engineer for ASCON Network, involving Support and Management for Siemens ATM & Hipath switches. Tracking and directing the workflow of faults and planned events. System administration, exchange alarm monitoring and traffic supervision Working on various communication systems technologies such as fibre-optic transmissions, digital trunked radio, public address & telephony. Optical power loss measurement test of optical fiber link by using power meter (FPM 300). Troubleshooting for day-to-day problems occurring in the network. Finding the cable cut using OTDR, Source Meter, Power Meter and Visual Fault Locater. Responsible for ensuring safety procedures being followed when carrying out optic fiber projects. Terminations of fibre optic cables to patch panels (ODF) Generation of fault tickets for assignment to field engineers.

Implementation of daily network changes as required by Army. Co-ordination with various field units to resolve their problems.

OTHER ASSIGNMENTS FOR ITI; Planning of Network, IP addressing for the network. Implementation (Installation, Testing and Commissioning), Operation and Maintenance of ASCON Project End to End. Responsible for technical support for the entire project. Worked on upgrade of Microwave Link, OFC. Worked on the Layer-3 routing using the BIAS of ATM switches. ATM- Planning for PNNI & H-PNNI addresses IP address and other services LAN, WAN. ISDN switch interfaces with different P-BAX exchanges through LD (loop disconnect), E&M signaling, E1CAS signaling and Qsig signaling. Providing ISDN and analog telephone lines. .

Aug. 2005- Nov 2006 Organization Name: Aurotel Communication (P) Ltd. Designation: Engineer Sales and Marketing JOB DESCRIPTION Follow up with the customer for the requirement and market analysis Meeting with the Client for there requirement so that there is no gap in the interaction. Configure & maintaining Security Settings for Desktop, Laptop according to companys Security policy Prepare INVENTORY report as needed. Configuration and maintenance of the various product if needed sometime. Configuration and maintenance of LAN, WAN and TCP/IP protocol PROJECTS DURING B.TECH Projects Undertaken at: INSTITUTE OF ENGINEERING & TECHNOLOGY, BAREILLY Major Project

Duration Name Description

3rd Feb, 2005 20th May, 2005. Analysis and Design of Gap Coupled Micro strip Antenna

The two concentric Annular Ring patch Antenna are analyzed. Consequently, various parameters such as input Impedance, VSWR, return loss, resonance frequency and Radiation patterns have been theoretically analyzed as a function of gap length and feed locations. COMPUTER PROFICENCY Operating Systems Programming Languages Database Tools : Windows 2000, XP, 2003, UNIX, LINUX : C, VB, and MATLAB. : MS Access, SQL 2000 : Microsoft Office INDUSTRIAL TRAINING Done training in HCL Technologies for 6 weeks during third year. Duration: Description: 5/06/04 15/07/04 Library Management system in Visual Basic using Microsoft Access. HOBBIES Sports, Reading, Making friends, Surfing the net. PERSONAL INFORMATION Date of birth Fathers name Marital Status Gender Nationality Email : 16th June 1983 : Mr. Mohd Alim : Single : Male : Indian : aziz_alim@rediffmail.com, azizalim@gmail.com

DATE:

AZIZ ALIM

Das könnte Ihnen auch gefallen