Sie sind auf Seite 1von 23

001

03May2012

NRN

DIFC

RDD/BR

BR

000

11Nov2011

NRN

DIFC

RDD/BR

KB BR

THIS DRAWING HAS BEEN PREPARED, REVIEWED, AND APPROVED BY SARGENT & LUNDY LLC

BLOCK-1 FIBER OPTIC CABLE TAB


SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603-5780

NRN 11/08/2011

RDD/BR 05/03/2012 ELECTRICAL

1-0923053.01 3OS
Page 1 of 197

EE-681703

001

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:07 pm

1. 2. 3. 4. 5. 6.

Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

= = = = = =

Total calculated lengths of cables in the cable tab. Actual cable lengths pulled. Estimated length to be pulled. Cable quantity ordered. Estimate of cables excess (+) or shortage (-) quantity. Overpull (+%) when field pulled lengths are above design estimates; Underpull (-%) when field pulled lengths are below design estimates. Length A B C = A - B1 D E=D-B-C B - B1 F = ---------- x 100% B1 ( B1 is the total estimated length of pulled cables, whereas B is the actual length pulled. )

Illustration
Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

No. of Cables X Y<=X -

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company


Length in Meters
On Order Over/ Short Field Dev Total Pulled Total Est Actual Pulled Est Unpulled

INTELAGEN - CMS (03.7.860 - 3.2) 4:07 pm 5/3/2012 Run Date:

Type Code

Furnish Spec

Description

Total # Cables

FIBER04

QC-1023

4C FIBER OPTIC 62.5/125UM Overall Totals:

65
65

42
42

12246
12,246

618
618

11546
11,546

0
0

(12164)

-12%

Report Filter = ( CABLE_NUMBER Like 'C1%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'

Page 2 of 2

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Tabulation Block-1 COMM
Description:
Furnish Spec: Installation Spec: Budget Ref No: Compartment:: Pull Length(m): No. of Cables: Type Code: End Length(m):

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date:


Cable No. :
Seg Code: System: Startup Code:
Cable From End: Equipment No:

5/3/2012

4:10 pm
Rev:

Service:
Routed Length (m): Allowance (m): Total Length (m):
Cable To End: Equipment No:

Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg:

Shield: Ground: Jacket: End Length(m):

Description: Zone: Location Dwg:


Routing Information: Remarks:

Description: North: Wiring Dwg: Zone: Schematic Dwg: Location Dwg: Schematic Dwg:

Route Points:

ITEM

DESCRIPTION

Cable No. No. of Cables Description Voltage Rating Shield Insulation Jacket Rev. System Service Ground Seg Code Type Code Routed Length Allowance Pull Length Budget Ref No Option 1 / 2 / 3 Startup Code Furnished Spec Installation Spec From/To Equipment Number From/To Description Compartment End Length Wiring Drawing Location Drawing North / East / Elevation Zone Remarks Route Points Filter Criteria

Unique identifying number assigned the cable(s). Identifies number of physical cables associated with cable number. (e.g. A cable number for a power feed may include three(3) 1/C cables). Description of the type of cable (e.g. 7/C #14). Voltage rating of cables insulation system (e.g. 600V) Optional - when included is used to indicate that cable has and overall shield Type of cable insulation material (e.g. XLPE). Type of cable jacket material (e.g. PVC) Design revision status of the cable. Plant system to which the cable is assigned (e.g. CD - which would be the Condensate System). Description of service for which cable is used (e.g. Condensate Booster Pump A). Optional - when included specifies special grounding requirement (e.g. #2 Bare CU - may be specified when using non-metallic conduit). Segregation Code assigned to cable (e.g. MV - which would be Medium Voltage Power) Unique code assigned to each different cable type. Automatically calculated length which includes the length of the raceway path through which a cable is routed and also includes any end lengths which may be manually input to account for the cable segment between the last raceway point and the connected equipment (see end length). Automatically calculated contingency allowance based on the total routed length. Optional - when included identifies actual installed cable lengths. Optional - when included identifies budget reference numbers associated with cables. Optional - when included identifies optional cable information. Optional - when included identifies Start/Construction code Contract responsible for providing the cable Contract responsible for installing the cable Identifying numbers of equipment between which cable is routed. Description of equipment between which cable is routed. Optional - when included identifies equipment compartment to which cable is to be terminated (e.g. switchgear cubicle). Optional - when included identifies additional lengths which may be input to account for the cable segment between the last raceway point and the connected equipment (see Rtd Length). Optional - when included may be used to identify Master Schematic or other wiring drawing on which cable terminations are defined. Optional - when included may be used to identify document(s) providing unique equipment installation details. Optional - not required if zone is identified. Identifies the East - North grid location and Elevation of Equipment Optional - not required when North / East / Elevation coordinates are identified. Identifies name or pre-defined zone in which equipment is located. Optional - when included identifies optional notes, references, etc. Optional - Identifies the cables installation route through the raceway system. Optional - shown only on the last page of cable tabulation and identifies the additional constraints used in the generation of the report.

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6001
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 611 25 636 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10SW61 Compartment: Description: NETWORK SW61 IN ST1 ELEC ROOM Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-44 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-42 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-59 C00-EMH-003 C00-D002-58 C00-EMH-002 C00-D001-111 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6002
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 611 25 636 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10SW62 Compartment: Description: NETWORK SW62 IN ST1 ELEC ROOM Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-44 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-42 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-59 C00-EMH-003 C00-D002-58 C00-EMH-002 C00-D001-111 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6003
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10SW186 Compartment: Description: NETWORK SW186 IN BLK-1 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-43 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-60 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-62 C00-EMH-171 C00-D351-57 C00-EMH-004 C00-D003-58 C00-EMH-003 C00-D002-57 C00-EMH-002 C00-D001-110 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Page 1 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6004
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10SW187 Compartment: Description: NETWORK SW187 IN BLK-1 MVLV BLDG Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-43 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-60 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-62 C00-EMH-171 C00-D351-57 C00-EMH-004 C00-D003-58 C00-EMH-003 C00-D002-57 C00-EMH-002 C00-D001-110 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6005
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10SW188 Compartment: Description: NETWORK SW188 IN BLK-1 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007 C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56 C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6006
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10SW189 Compartment: Description: NETWORK SW189 IN BLK-1 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007 C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56 C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Page 2 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6007
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10SW190 Compartment: Description: NETWORK SW190 IN BLK-1 MVLV BLDG Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007 C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56 C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6008
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 638 26 664 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10SW191 Compartment: Description: NETWORK SW191 IN BLK-1 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007 C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56 C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C10CPB6009
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 12 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 3 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6010
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 12 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6011
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 12 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6012
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 14 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-151 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6013
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 14 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-151 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 4 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6014
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 14 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-151 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6015
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 18 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-003 Compartment: Description: B1H1 I/O CABINET-2_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-148 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6016
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 18 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-003 Compartment: Description: B1H1 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-148 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6017
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 21 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-CPB-66-GH-004 Compartment: Description: B1H1 I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-148 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 5 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6018
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 21 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C11-CPB-66-GH-004 Compartment: Description: B1H1 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-148 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6019
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 10 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6020
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 10 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6021
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 10 No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 6 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6022
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 15 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-141 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6023
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 15 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-141 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6024
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 15 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-141 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6025
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 15 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-003 Compartment: Description: B1H2 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-139 C10-TK-137 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 7 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6026
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 15 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C12-CPB-66-GH-003 Compartment: Description: B1H2 I/O CABINET-2_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-139 C10-TK-137 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6027
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-004 Compartment: Description: B1H2 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-139 C10-TK-137 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6028
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-CPB-66-GH-004 Compartment: Description: B1H2 I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-139 C10-TK-137 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6029
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 11 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 8 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6030
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 11 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6031
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 11 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6032
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 17 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-140 C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6033
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 17 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-140 C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 9 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6034
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 17 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-140 C10-TK-143 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6035
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 20 No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-003 Compartment: Description: B1H3 I/O CABINET-2_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-165 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6036
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 20 No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-003 Compartment: Description: B1H3 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-165 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6037
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 24 No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-CPB-66-GH-004 Compartment: Description: B1H3 I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-165 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 10 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6038
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C13-CPB-66-GH-004 Compartment: Description: B1H3 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-165 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6039
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 13 No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6040
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 13 No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6041
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 13 No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 11 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6042
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 12

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10-CPB-66-GH-024 Compartment: Description: B1BT I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-133 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6043
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 12

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-024 Compartment: Description: B1BT I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-133 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6044
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 14 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-004 Compartment: Description: B1C I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-149 C10-TK-150 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6045
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 14 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-004 Compartment: Description: B1C I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-149 C10-TK-150 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 12 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6046
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10-CPB-66-GH-005 Compartment: Description: B1C I/O CABINET-4_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-149 C10-TK-150 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6047
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 16 No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-005 Compartment: Description: B1C I/O CABINET-4_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-149 C10-TK-150 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6048
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 10 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-012 Compartment: Description: B1E I/O CABINET-1_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-145 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6049
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 10 No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-012 Compartment: Description: B1E I/O CABINET-1_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-145 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 13 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6050
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): 13 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Cable From End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-145 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-013 Compartment: Description: B1E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6051
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): 13 No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694369

Service: BLOCK-1 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694369 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TK-145 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-013 Compartment: Description: B1E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10CPB6084
Seg Code: CO System: CPB Startup Code:

Rev: 01

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 280 13 293 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 10

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C11-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C11-TK-041 C11-TK-042 C11-TK-044 C11-TK-045 C11-TK-046 C11-TK-051 CABLE C11-TK-323 C11-TK-322 C11-TK-311 C11-TK-302 C11-TK-301 C11-TK-203 C11-TK-102 C11-TK-201 C11-TK-516 C11-TK-517A C11-TK-518A C11-TK-519A C11-TK-522A C11-TK-523A C11-TK-524A C10-TK-213A C10-TK-212A C10-TK-158 C10-TK-151 C10-TK-148 C10-TK-144 C10-TK-142 CABLE

Page 14 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 01 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6085
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 280 13 293 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 10

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Cable From End: Equipment No: C11-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C11-TK-041 C11-TK-042 C11-TK-044 C11-TK-045 C11-TK-046 C11-TK-051 CABLE C11-TK-323 C11-TK-322 C11-TK-311 C11-TK-302 C11-TK-301 C11-TK-203 C11-TK-102 C11-TK-201 C11-TK-516 C11-TK-517A C11-TK-518A C11-TK-519A C11-TK-522A C11-TK-523A C11-TK-524A C10-TK-213A C10-TK-212A C10-TK-158 C10-TK-151 C10-TK-148 C10-TK-144 C10-TK-142 CABLE

Cable: C10CPB6088
Seg Code: CO System: CPB Startup Code:

Rev: 01

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 10

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C12-TK-041 C12-TK-042 C12-TK-044 C12-TK-045 C12-TK-046 C12-TK-051 CABLE C12-TK-323 C12-TK-322 C12-TK-311 C12-TK-302 C12-TK-301 C12-TK-203 C12-TK-102 C12-TK-201 C12-TK-517 C12-TK-518A C12-TK-523A C12-TK-524A C10-TK-203A C10-TK-162A C10-TK-161A C10-TK-143 CABLE

Cable: C10CPB6089
Seg Code: CO System: CPB Startup Code:

Rev: 01

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 10

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C12-TK-041 C12-TK-042 C12-TK-044 C12-TK-045 C12-TK-046 C12-TK-051 CABLE C12-TK-323 C12-TK-322 C12-TK-311 C12-TK-302 C12-TK-301 C12-TK-203 C12-TK-102 C12-TK-201 C12-TK-517 C12-TK-518A C12-TK-523A C12-TK-524A C10-TK-203A C10-TK-162A C10-TK-161A C10-TK-143 CABLE

Page 15 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 01 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6103
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 576 24 600 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694381 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694381

Cable From End: Equipment No: C10BPA01 Compartment: Description: VFD PANEL FOR CW PUMP#1A BLOCK-1 Equip Location: Zone: East: North: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C00-TK-143 C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-18 C00-EMH-176 C00-D359-26 C00-EMH-174 C00-D353-29 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-59 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-59 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-40 C20-EMH-009 C20-D065-41 C20-EMH-008 C20-D063-22 C20-EMH-007 C10-D066-23 C10-EMH-007 C14-TK-205 C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145 C10-TK-142 CABLE

Cable: C10CPB6104
Seg Code: CO System: CPB Startup Code:

Rev: 01

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694381

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 576 24 600 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694381 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BPA01 Compartment: Description: VFD PANEL FOR CW PUMP#1A BLOCK-1 Equip Location: Zone: North: East: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C00-TK-143 C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-19 C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-60 C30-EMH-010 C30-D066-60 C30-EMH-009 C30-D065-60 C30-EMH-008 C30-D063-41 C30-EMH-007 C20-D066-41 C20-EMH-009 C20-D065-42 C20-EMH-008 C20-D063-23 C20-EMH-007 C10-D066-24 C10-EMH-007 C14-TK-205 C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145 C10-TK-142 CABLE

Cable: C10CPB6105
Seg Code: CO System: CPB Startup Code:

Rev: 01

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694381

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 570 24 594 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694381 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BPA02 Compartment: Description: VFD PANEL FOR CW PUMP#1B BLOCK-1 Equip Location: Zone: North: East: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-18 C00-EMH-176 C00-EMH-174 C00-D353-29 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-59 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D063-40 C30-EMH-007 C20-D066-40 C20-EMH-009 C20-D065-41 C20-EMH-008 C20-D063-22 C20-EMH-007 C10-D066-23 C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-142 CABLE

C00-D359-26 C30-D065-59 C30-EMH-008 C10-EMH-007 C14-TK-205 C10-TK-145

Page 16 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 01 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6106
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 570 24 594 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694381 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694381

Cable From End: Equipment No: C10BPA02 Compartment: Description: VFD PANEL FOR CW PUMP#1B BLOCK-1 Equip Location: Zone: East: North: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-19 C00-EMH-176 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-60 C30-EMH-010 C30-D066-60 C30-EMH-009 C30-D063-41 C30-EMH-007 C20-D066-41 C20-EMH-009 C20-D065-42 C20-EMH-008 C20-D063-23 C20-EMH-007 C10-D066-24 C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-142 CABLE

C00-D359-27 C30-D065-60 C30-EMH-008 C10-EMH-007 C14-TK-205 C10-TK-145

Cable: C10CPB6112
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C13-TK-041 C13-TK-042 C13-TK-044 C13-TK-045 C13-TK-046 C13-TK-051 CABLE C13-TK-323 C13-TK-322 C13-TK-311 C13-TK-302 C13-TK-301 C13-TK-203 C13-TK-102 C13-TK-201 C13-TK-516 C13-TK-517 C13-TK-518 C10-TK-206 C10-TK-157B C10-TK-150 C10-TK-149 C10-TK-145 CABLE

Cable: C10CPB6113
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 20 Elevation: Schematic: ED-694380

Service: BLOCK-1 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694380 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C13-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-681101 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: FIELD ROUTED C13-TK-041 C13-TK-042 C13-TK-044 C13-TK-045 C13-TK-046 C13-TK-051 CABLE C13-TK-323 C13-TK-322 C13-TK-311 C13-TK-302 C13-TK-301 C13-TK-203 C13-TK-102 C13-TK-201 C13-TK-516 C13-TK-517 C13-TK-518 C10-TK-206 C10-TK-157B C10-TK-150 C10-TK-149 C10-TK-145 CABLE

Page 17 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6200
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C10-CFA-77-GH-003 Description: BLOCK-1 CMS-03 Equip Location: Zone: Location Dwg: EA-681121

Service: BLOCK-1 STG-CMS MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 616 26 642 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694490 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694490

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-136 C10-TK-139 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Cable: C10CPB6201
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C10-CFA-77-GH-003 Description: BLOCK-1 CMS-03 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6

Service: BLOCK-1 STG-CMS MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 616 26 642 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694490 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-694490

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C10-TK-136 C10-TK-139 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201 C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-41 C20-EMH-009 C20-D066-40 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Cable: C10CPB6202
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C10-CFA-77-GH-004 Description: BLOCK-1 CMS-01 STG Equip Location: Zone: Location Dwg: EA-681111

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6

Service: BLOCK-1 STG-CMS MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 601 25 626 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694490 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-694490

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C14-TK-061 C14-TK-063 C14-TK-065 C14-TL-055 C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Page 18 of 19

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 5/3/2012 4:10 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM

Cable: C10CPB6203
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C10-CFA-77-GH-004 Description: BLOCK-1 CMS-01 STG Equip Location: Zone: Location Dwg: EA-681111

Service: BLOCK-1 STG-CMS MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 601 25 626 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694490 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694490

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C14-TK-061 C14-TK-063 C14-TK-065 C14-TL-055 C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-41 C20-EMH-009 C20-D066-40 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Total Cables:

65

Report Filter = ( CABLE_NUMBER Like 'C1%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'

Page 19 of 19

Das könnte Ihnen auch gefallen