Beruflich Dokumente
Kultur Dokumente
A.-
PROYECTO :
OFICINA :
CAMION DISEO
FONCODES
HL - 93
PREDIMENSIONAMIENTO
Puente simplemente apoyado
LUZ DEL PUENTE
L=
16.00 m
PERALTE VIGA
H = L/15 ~ L/12 y H = 0,07*L
H = L/15 =
Tomar como peralte de la Viga, H =
1.15 m
ESPESOR LOSA
t (mm) = 1.2(S+3000)/30
t=
204.00 mm
Como espesor de la losa se puede asumir, t =
0.20 mt
Medidas asumidas:
H = L/12 =
t=
1.33 H = 0,07*L =
20.40 cm
1.12
minimo 17.5 cm
(m)
Ancho de via
long vereda
Ancho de viga
(A)=
(c)=
(bw)=
(f)=
(t)=
(g)=
(n)=
(e)=
(S)=
(a)=
(i)=
(u)=
(z)=
(p)=
(q)=
espesor de losa
barandas
Nmero de vigas diafragmas =
Ancho vigas diafragmas
Peralte vigas diafragmas
3.600
0.650
0.350
0.950
0.200
0.150
0.000
0.025
2.100
0.900
0.200
0.450
0.050
0.100
0.150
4
0.200
0.950
(ad)=
(hd)=
fy =
f'c =
fc = 0,4*f'c
fs = 0,4*fy
r = fs / fc
Es =
Ec = 15,000 (f'c)(1/2) =
n = Es/Ec >= 6
Usar n =
k = n / (n + r)
j=1-k/3
fc*j*k =
B.-
1.07
4,200.0
280.0
112.0
1,680.0
15.0
2.0E+06
250,998
7.968
8
0.348
0.884
34.440
S' = S + bw
bw =0,02*L*(S')1/2
bw >= 2*t
hd >= 0,5*H
a ~ S/2
Kg/cm 2
Kg/cm 2
Kg/cm 2
Kg/cm 2
2.450
0.501
0.400
0.575
m
m
m
m
4,200.0
280.0
112.0
1,680.0
15.0
2.1E+06
250,998
8.367
8
0.348
0.884
34.440
Kg/cm 2
Kg/cm 2
DISEO DE LA LOSA
METRADO DE CARGAS
Peso propio
Asfalto
(1m)*(t)*(2,40 Tn/m3) =
(1m)*(e)*(2,00 Tn/m3) =
Wd =
0.480 Tn/m
0.050 Tn/m
0.530 Tn/m
MD =
0.234 Tn-m/m
Rueda trasera
Modificacion por Numero de Vias Cargadas
Se puede observar que el ancho de la seccion del puente es de 3.6 mts
Por lo tanto el numero de vias es de 1, por que se afectara la carga por un factor que es de 1.2
Entonces se debe de amplificar la carga por este factor ==> 1.2 * P
Pr =
Pr =
ML = ( S + 2' ) / 32' x Pr
donde :
ML = ( S + 0,61 ) / 9,75 x Pr
ML =
1.2 * Pr =
2.468 Tn-m/m
I=
MI =
Ms = MD + ML + MI
Ms =
d req. =
0.330
0.815 Tn-m/m
3.516 Tn-m/m
14.290 cm
As =
As mn =
As mn < As
Tomamos
As =
Af =
@=
1,5*t =
45 cm
@=
cm
cm
cm
BIEN
2
13.940 cm /m
2
5.661 cm /m
TRUE
BIEN
2
13.940 cm /m
1.979
14.198
30.000
45.000
15.00
cm 2
cm
cm
cm
cm
16.314 KLb
7.400 Tn
8.880 Tn
Pgina 2
RESISTENCIA I : Combinacion basica de carga relacionada con el uso vehicular normal sin considerar el viento
Mu = 0.95*(1.25 Wd + 1.75 ( Wl + Wi ))
1.0 Acero Principal
1.1 Acero positivo y negativo
M+/- = 1,25*MD+1.75*(ML+MI)
As = M / (f*fy*(d-a/2))
Mu = f*f'c*b*d2*w*(1+w/1,70)
w1 = (1,7+(1,72-4*(1,7*Mu/(f*f'c*b*d2)))0,5)/2
w2 = (1,7-(1,72-4*(1,7*Mu/(f*f'c*b*d2)))0,5)/2
5.735 Tn-m
a = As*fy/(0,85*f'c*b)
w = r*fy/f'c
r = As/(b*d)
w1 =
1.617054
w2 =
0.082946
2
As 1 =
183.091 cm
2
As 2 =
9.392 cm
As mn =
TRUE
As+/- =
Af =
@=
1,5*t =
45 cm
@=
r1 =
r2 =
0.107804
0.005530
2
9.392 cm
As+/- =
As mn < As
Tomamos
Clculo del espaciamiento
@ = Af*b/At
Si consideramos acero 5/8"
El menor de los tres :
M+/- =
Usamos:
verificando la cuanta mnima
As mn = 14*b*d/fy
f = 0.90
a=
1.66 cm
2
5.661 cm /m
BIEN
2
cm
/m
9.392
1.979
21.076
30.000
45.000
25.00
cm 2
cm
cm
cm
cm
Ast >=
Ast >=
Ast =
Como es enmallado,
Clculo del espaciamiento
@ = Af*b/At
Si consideramos acero 3/8"
El menor de los tres :
Af =
@=
3*t =
45 cm
Usar acero 3/8"
@=
Se colocar en el sentido perpendicular al refuerzo principal (superior)
C.-
0.713
26.931
60.000
45.000
25.00
cm 2
cm
cm
cm
cm
Medidas
i*g
u*(g+n)
z*(g+n)/2
a*t
(a-u-z)*e
p*q
Carga(Tn)
0.072
0.162
0.009
0.432
0.020
0.036
0.032
Distancia (m)
Momento
1.000
0.675
0.433
0.450
0.200
0.875
0.963
MD =
0.072
0.109
0.004
0.194
0.004
0.032
0.031
0.446
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
E = Ancho efectivo
X = Distancia rueda a empotramiento
X1 = Distancia de la rueda al sardinel (1') =
X = 0,80-0,25-0,30
X = a-(u+z)-X1
X1 =
0.3 m
X=
0.100 m
X1 = 30 cm
q
c
g
n
g
0.129 Tn-m/m
Mu
3
u
i
MI =
z
2
X1
0,05
1.140 m
4.440 Tn
0.389 Tn-m/m
Asfalto
Pgina 3
DISEO POR SERVICIO :
Ms = MD + ML + MI
Ms =
As = Ms/(fs*j*d)
verificando la cuanta mnima
As mn = 14*b*d/fy
As =
As mn =
As mn < As
Tomamos
As =
Af =
@=
1,5*t =
45 cm
@=
0.964 Tn-m/m
2
3.822 cm /m
2
5.661 cm /m
FALSE
USAR CUANTIA MINIMA
2
5.661 cm /m
1.979
34.963
30.000
45.000
30.00
cm 2
cm
cm
cm
cm
Mu =
w = r*fy/f'c
As+/- =
Usamos:
As- =
1.391 Tn-m/m
a = As*fy/(0,85*f'c*b)
r = As/(b*d)
w1 =
1.680643
w2 =
0.019357
2
As 1 =
190.291 cm
2
As 2 =
2.192 cm
FALSE
r1 =
r2 =
0.112043
0.001290
2
2.192 cm
a=
2
9.392 cm /m
Tomamos
As =
Af =
@=
1,5*t =
45 cm
@=
2
9.392 cm
1.979
21.076
30.000
45.000
20.00
cm 2
cm
cm
cm
cm
Asp =
L=
a=
a=
Asd =
Af =
@=
Usar acero 1/2"
@=
Se colocar en el sentido perpendicular al acero principal (inferior)
9.392
1.800
82.024
67.000
6.292
cm 2
m
=< 67 %
cm2/m
2
1.267 cm
20.132 cm
20.00 cm
Como es enmallado,
2
1/8 pulg /pie
2
2.646 cm /m
2
2.646 cm /m
2
Af =
0.713 cm
@=
26.931 cm
3*t =
60.000 cm
45 cm
45.000 cm
Usar acero 3/8"
@=
25.00 cm
Se colocar en el sentido perpendicular y paralelo al sentido del trnsito (superior)
D.-
DISEO DE VEREDAS
DISEO POR FLEXION
METRADOS DE CARGAS
Momento por peso propio
Seccin
Medidas
1
0,55*0,20
6
Pasam.: 0,15*0,25
7
Post:(,25+,2)/2*,65*,2/2,179
Medidas
i*g
p*q
Carga(Tn)
Vd =
0.072
0.036
0.032
0.140
Distancia (m)
Momento
0.275
0.375
0.413
MD =
0.020
0.014
0.013
0.047
Tn-m/m
Tn-m/m
Tn-m/m
Tn-m/m
0.39 cm
Pgina 4
Momento por sobrecarga
Debido a carga horizontal sobre poste y peatones
Ml = Mpost + Mpeat
Mpost = P' *(0,70-0,25/2+0,15/2)
Mpeat = s/c*(0,40*0,40/2)
donde :
P' = C*P/2
P=
10,000.00 lb
C=
1.00
P' =
2.268 Tn
2
Peatonal s/c =
73.70 Lb/pulg
2
Peatonal s/c =
0.360 Tn/m
La sobrecarga tambien se afecta por el factor de via que es de 1.2
2
Peatonal - Factor 1.2*s/c =
0.432 Tn/m
Mpost =
debido a la distribuc. de los postes se toma el 80%
1.474 Tn-m/m
Mpost =
Mpeat =
ML =
1.179 Tn-m/m
0.035 Tn-m/m
1.214 Tn-m/m
Ms = MD + ML + MI
Ms =
El peralte mnimo es :
d = (2*Ms*/(fc*j*k*b))(1/2)
1.261 Tn-m/m
d req. =
8.556 cm
2
7.468 cm /m
As =
As mn =
As mn < As
Tomamos
TRUE
As =
Af =
@=
1,5*t =
45 cm
@=
cm
cm
cm
BIEN
2
3.788 cm /m
BIEN
2
7.468 cm /m
1.979
26.505
22.500
45.000
30.00
cm 2
cm
cm
cm
cm
Mu =
w = r*fy/f'c
2.183 Tn-m/m
a = As*fy/(0,85*f'c*b)
r = As/(b*d)
w1 =
1.630068
w2 =
0.069932
2
As 1 =
123.505 cm
2
As 2 =
5.299 cm
2
5.299 cm
As+/- =
Usamos:
As mn = 14*b*d/fy
As mn =
As mn < As
Tomamos
TRUE
As =
Af =
@=
1,5*t =
45 cm
@=
r1 =
r2 =
2
3.788 cm /m
BIEN
2
5.299 cm /m
1.979
37.356
22.500
45.000
30.00
cm 2
cm
cm
cm
cm
1/2
Af =
@=
Usar acero 3/8"
@=
Se colocar en el sentido perpendicular al acero principal (inferior)
5.299
1.100
104.926
67.000
3.550
cm 2
m
=< 67 %
cm2/m
2
0.713 cm
20.072 cm
20.00 cm
Como es enmallado,
Ast >=
Ast >=
Ast =
2
1/8 pulg /pie
2
2.646 cm /m
2
2.646 cm /m
0.108671
0.004662
a=
0.94 cm
Pgina 5
Clculo del espaciamiento
@ = Af*b/At
Si consideramos acero 3/8"
El menor de los tres :
2
Af =
0.713 cm
@=
26.931 cm
3*g =
45.000 cm
45 cm
45.000 cm
Usar acero 3/8"
@=
25.00 cm
Se colocar en el sentido perpendicular y paralelo al sentido del trnsito (superior)
8.567
Vd =
Vl =
Vu =
0.140 Tn/m
0.173 Tn/m
0.478 Tn/m
Vc =
fVc =
10.079 Tn/m
8.567 Tn/m
0.478
>
TRUE
BIEN
DISEO DE SARDINEL
Momento por sobrecarga
AASHTO
V=
V=
500.000
0.760
0.150
0.150
0.190
0.333
H=g+n=
USAR H =
M = V*H
Mu = 1,25*MD+1.75*(ML+MI)
M=
Mu =
15.00
As = M / (f*fy*(d-a/2))
Mu = f*f'c*b*d2*w*(1+w/1,70)
w1 = (1,7+(1,72-4*(1,7*Mu/(f*f'c*b*d2)))0,5)/2
w2 = (1,7-(1,72-4*(1,7*Mu/(f*f'c*b*d2)))0,5)/2
BIEN
recub. =
d=
5.00 cm
10.00 cm
a = As*fy/(0,85*f'c*b)
w = r*fy/f'c
r = As/(b*d)
w1 =
1.686702
w2 =
0.013298
2
As 1 =
112.447 cm
2
As 2 =
0.887 cm
As =
a=
0.16 cm
2
1.267 cm
38.003 cm
19.00 cm
Af =
@=
@=
0.112447
0.000887
2
3.333 cm /m
FALSE
USAR CUANTIA MINIMA
2
3.333 cm /m
As mn =
As mn < As
Tomamos
r1 =
r2 =
2
0.887 cm
As+/- =
Usamos:
verificando la cuanta mnima
As mn = 14*b*d/fy
H = g + n < 10"
Lb/pie
Tn/m
m
m
Tn-m/m
Tn-m/m
Dado que las cargas sobre la vereda no deben ser aplicadas simultneamente con las cargas de las ruedas, este es el nico momento en la seccin
Haciendo pasar las varillas de la vereda se est del lado de la seguridad.
Chequeo por cortante
Vu = 1,25*VD+1.75*(VL+VI)
Cortante por sobrecarga =
Fuerza cortante que absorbe el concreto:
Vc =0,53*(f'c)1/2*b*d
fVc > Vu
E.-
7.538
VL =
Vu =
0.760 Tn/m
1.330 Tn/m
Vc =
fVc =
8.869 Tn/m
7.538 Tn/m
1.330
>
Medidas
Carga
t*(a+bw+S/2)*2,40 Tn/m3
f*bw*2,40 Tn/m3
e*A/2*2,00 Tn/m3
c*g*2,40 Tn/m3
u*n+z*(g+n)/2*2,4 Tn/m3
p*q*2,40 Tn/m3
c*0,40 Tn/m2
wd =
BIEN
1.104
0.798
0.090
0.234
0.009
0.036
0.032
0.260
2.563
Tn/m
Tn/m
Tn/m
Tn/m
Tn/m
Tn/m
Tn/m
Tn/m
Tn/m
TRUE
Centro de Luz X =
hd*ad*S/2*2,40 Tn/m 3
Mvd
W1*(L-2*n)/4 =
W1*(L/3) =
W1*(L-n)/2 =
W1*(3L/5) =
W1*(3*L-2*n)/4 =
W1 =
Por Baret
Mvd (Tn-m)
1.744
2.554
3.659
4.596
5.574
X=
8.000 m
7.283333333 m
Centro de luz X = L/2 =
0.479 Tn
d2 = 14', L >
L >= 6*n
L >= 4*n
L >= 10*n
L >= 6*n
d2 = 30', L >
4.267
2.845
7.112
4.267
A X m de la izq.
Mvd (Tn-m)
1.915
10.770
2.554
7.180
3.830
17.949
4.596
10.770
8.000 m
Pgina 6
Momento por peso propiode viga diafragma (Mvd) :
Usamos Momento por diafragma
Por Baret :
En centro de Luz
Mpp = wd*(L/2-n)*(L/2+n)/2
Por Baret :
En centro de Luz
Mvd =
Mvd =
2.554 Tn-m
2.554 Tn-m
Mpp =
Mpp =
Mpp = wd*(L-X)*X/2
81.365 Tn-m
82.023 Tn-m
CL
4P R
4P
n n d2-2*n
d1
Wd=1 tn/m
A
B
Por Baret :
En centro de Luz
MD =
MD =
83.918 Tn-m
84.577 Tn-m
L/2-n
L/2+
L/2
L/2
Si X < d1
B = (L/2-n)*(L/2+n)/L
A = (L/2+n)*(L/2-n-d1)/L
Ms/c = P/L*[(L-X)*(9*X-d1)-4*d2*X)]
C = (L/2-n)*(L/2+n-d2)/L
Ms/c = P*(L-X)/L*(9*X-d1-5*d2)
donde :
P=
8,157.00 Lb
Por Baret :
En centro de Luz
Clculo del coeficiente de concentracin de cargas :
CCC =1+(A-10')/(bw+S))
Por Baret :
En centro de Luz
CARGA DISTRIBUIDA
Md=WL2/8
MOMENTO TOTAL
Por Baret :
Ms/c+Md
En centro de Luz
P=
M s/c =
M s/c =
3,700.015 Kg
47.247 Tn-m
46.713 Tn-m
X2 = 2' =
CCC =
M s/c =
M s/c =
Md=
Mt=
Mt=
0.610 m
1.225
57.892 Tn-m
57.237 Tn-m
32
89.892
89.237
M = PT*X/L*(2*L-2*X-dT)
M = PT*(L-X)/L*(2*X-dT)
PT = 24,691.35 Lb
dT = 4'
Por Baret :
En centro de Luz
Por Baret :
En centro de Luz
Md=WL2/8
Por Baret :
En centro de Luz
PT =
dT =
M et =
M et =
M eq =
M eq =
Md=
Mt=
Mt=
ML =
ML =
11.200 Tn
1.200
82.763
82.880
41.381
41.440
32
73.381
73.440
m
Tn-m
Tn-m
Tn-m
Tn-m
89.892 Tn-m
89.237 Tn-m
Tomamos ==>
I=
0.330
Momento de impacto
Por Baret :
En centro de Luz
MI =
MI =
29.664 Tn-m
29.448 Tn-m
b=
b=
b=
b=
d=
m
m
m
m
cm
TRUE
BIEN
Mu = 0.95*(1,25*MD+1.75*(ML+MI))
Usamos:
4.000
3.550
2.450
2.450
105.00
Mu =
Mu =
Mu =
w = r*fy/f'c
298.416 Tn-m
297.750 Tn-m
298.416 Tn-m
a = As*fy/(0,85*f'c*b)
r = As/(b*d)
1.654966
0.045034
2
2,838.267 cm
2
As 2 =
77.233 cm
w1 =
w2 =
As 1 =
As =
2
77.233 cm
r1 =
r2 =
0.110331
0.003002
b debe ser mayor a:
33.79916271
a=
5.56 cm
Pgina 7
Distribucin del Acero
Si consideramos acero 1"
# barras = As / Af
Af =
5.07
15.242
16.000
20
81.073
# barras =
Usaremos :
# barras =
As =
cm
barras
barras
barras
cm 2
fbarra =
en
2.50 cm
2 capas
1,5 fbarra =
3.75 cm
1,5 T.M.agregado =
3.75 cm
distancia entre barras = eh =
3.75 cm
recubrimiento lateral = rec = (1.50") =
3.75 cm
festribo =
3/8
0.95 cm
Ancho mnimo de la viga b = 2*rec+2*fest+(# barras-1)*eh+#barras*fbarra
130.655 cm
E3-VERIFICACIONES
1.00
Ms = MD + ML + MI
Ms =
Ms =
2.00
Ms =
d=
r < rmx
4.00
TRUE
rmx =
0,18f'c/fy =
TRUE
BIEN
a=
t=
Mf = 0.75 *( ML + MI )
Mf =
fsmx =
89.67 Tn-m
2
1,191.483 Kg/cm
fsmn = Mmn/(As*j*d)
Mmn = MD
Mmn =
fsmn =
84.577 Tn-m
2
1,123.835 Kg/cm
Df = fsmx - fsmn
2
Df =
67.648 Kg/cm
ff = 1470 - 0,33 fsmn + 551,2 (r/h)
2
ff =
1,264.494 Kg/cm
ff > Df
TRUE
0.00279
BIEN
0.01200
se puede asumir
r/h =
0.3
BIEN
fsmx = Z/(dc*A)(1/3)
2
Z=
30,000.00 Kg/cm
2
Z=
23,000.00 Kg/cm
cm
espac. vertic (ev) =
3.81 cm.
cm
cm
<
10.00 cm
Disminuir d
X=
12.000 cm
A=
52.500
2
fsmx =
3,168.944 Kg/cm
2
fsact =
1,191.483 Kg/cm
TRUE
BIEN
X
12.00
b
0.350
X=
Vdpp =
Vdvd =
VD =
PV = 26,000 Lb
W = 645 Lb/pie
Por viga = VL eq/2
POR SOBRECARGA EJE TANDEM
VL et = PT*(2*L-2*X-dT)/L
Si X < L/2
PV =
W=
VL eq =
11.794 Tn
0.960 Tn/m
5.897 Tn
VL eq =
2.948 Tn
Si X < L/2
Si L/2 < X < L
VL et = PT*(2*X-dT)/L
Por viga = VL et/2
TOMANDO EL MAYOR CORTANTE ( Vl )
8.000 m
0.000 Tn
0.479 Tn
0.479 Tn
Si X < L/2
VL = (P/L)*((4Ccc1+5Ccc)*X-Ccc*d1-5*Ccc*d2)
TRUE
fsmx = Ma/(As*j*d)
7.00
0.85
5.840 cm
20.000 cm
TRUE
BIEN
a<t
6.00
b1 =
rmn = 0,7*f'c^1/2/fy=
a<t
a = As*fy/(0,85*f'c*b)
5.00
BIEN
rb = (0,85*f'c*b 1/fy)*(0,003Es/(0,003*Es+fy)
rb =
0.02833
rmx =
0,75*rb =
0.02125
r = As/(b*d)
r=
r > rmn
0.00315
TRUE
BIEN
Siendo :
la cuanta de la viga es :
203.475 Tn-m
69.448 cm
115.00 cm
102.00 cm
Verificando la cuanta
Clculo de la cuanta balanceada
3.00
203.475 Tn-m
203.262 Tn-m
VL et =
10.360 Tn
VL et =
VL =
5.180 Tn
13.091 Tn
Ccc1 =
1.225
Pgina 8
POR IMPACTO
VI = I*VL
DISEO POR ROTURA
Vu = 1,3*(VD+(5/3)*(VL+VI))
Esfuerzo cortante ltimo
uu = Vu/(b*d)
Esfuerzo cortante resistente de concreto
uc =(0,5(f"c)^1/2+175*r*Vu*d/Mu)
175*r*Vu*d/Mu < 1,00
VI =
4.320 Tn
Vu =
38.346 Tn
uu =
2
10.434 Kg/cm
r=
0.135 USAR =
Av =
S=
S<d/2=
Vu>0,5fVc
8.00
ACERO LATERAL
5@
7@
10 @
Resto @
8.441 Kg/cm
2
7.175 Kg/cm
FALSE
2
2.534 cm
93.275 cm
52.50 cm
Smx =
2
8.869 Kg/cm
2
7.538 Kg/cm
fuc =
fuc =
2
7.175 Kg/cm
SI NECESITA ESTRIBOS
0.000
86.86 cm
0.10
0.20
0.30
0.40
ASL =
2
8.107 cm
30 cm =
30.00
bw =
35.00
S=
30.000
# fierros = (H - 15)/S
# fierros =
3.383
Usamos
# fierr. =
2.00
As =
2.027
lo cual es aproximadamente una varilla de
f = 5/8"
Af =
1.979
Usamos
Numero de fierros ser:
F.-
0.135
uc =
0.85
uc =
fuc =
uu < fuc
uc =0,53(f"c)^1/2
0.00315
Vu*d/Mu =
f=
cm
cm
cm
(ad)=
(hd)=
( S + bw )
0.200
0.950
2.450
Medidas (m)
0.20 * 0.45 * 2400 kg/m3
Medidas
Carga
0.456 Tn/m
W pp
0.456 Tn/m
w*l2
8
Mpp =
Mpp =
Tn - m
0.342
0.342 Ton - m
2.450
M s/c = P * b =
( S/C )
+ I impacto
7.07 Ton - m
P=
M s/c =
7.07 Ton - m
1.23
1.23
0.61
L/2
Momento total =
M = M pp + M s/c
L/2
1.225
M=
7.413 Ton - m
=b
1.225
Pgina 9
3.0 DISEO POR SERVICIO
M=
fy =
f'c =
fc = 0,4*f'c
fs = 0,4*fy
r = fs / fc
Es =
Ec = 15,000 (f'c)(1/2) =
n = Es/Ec >= 6
Usar n =
k = n / (n + r)
j=1-k/3
fc*j*k =
4200
280
112
1680
15
2000000
250998.008
7.968190729
8
0.347826087
0.884057971
34.43982357
7.413 Ton - m
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Ms = MD + ML + MI
Ms =
El peralte mnimo es :
d = (2*Ms/(fc*j*k*b))(1/2)
7.413 Tn-m/m
d req. =
20.748 cm
considerando recubrimiento de 1" y suponiendo el empleo de estribo de fierro de f=3/8" (0.953 cm),
el peralte ser como mximo :
recubr. =
2.540 cm
estribo =
3/8
0.953 cm
d = t - rec. - est./2
d asum. =
93.254 cm
Se debe cumplir
d asum. > d req.
TRUE
BIEN
DISEO POR SERVICIO
As = Ms/(fs*j*d)
verificando la cuanta mnima
As mn = 14*b*d/fy
As mn < As
Tomamos
2
5.352 cm /m
As =
2
6.217 cm /m
FALSE
USAR CUANTIA MINIMA
2
6.217 cm /m
As mn =
As =
2
1.979 cm
Af =
3.14 barras
Usamos:
verificando la cuanta mnima
As mn = 14*b*d/fy
As mn < As
Tomamos
Si consideramos acero 5/8"
Usar acero 5/8"
Entonces se tiene que se usara acero de 5/8"
Distribucin del Acero
Si consideramos acero 5/8"
# barras = As / Af
Usaremos :
M+/- =
12.801 Tn-m
a = As*fy/(0,85*f'c*b)
r = As/(b*d)
w1 =
r1 =
1.670273
w2 =
r2 =
0.029727
2
As 1 =
207.679 cm
2
As 2 =
3.696 cm
w = r*fy/f'c
30420
0.4208236
0.111352
0.001982
2
3.696 cm
As+/- =
As mn =
6.217
FALSE
6.217
1.979
As+/- =
Af =
4
Af =
# barras =
As =
La distancia entre barras paralelas ser no menor que:
0.65 cm
fbarra =
1.59 cm
cm 2
3.14 barras
barras de acero de 5/8"
1.979
3.141
4.000
4
7.917
# barras =
a=
cm 2/m
USAR CUANTIA MINIMA
cm2/m
cm 2
barras
barras
cm 2
en
1 capas
1,5 fbarra =
2.38 cm
1,5 T.M.agregado =
2.38 cm
distancia entre barras = eh =
2.38 cm
recubrimiento lateral = rec = (2") =
4.78 cm
festribo =
3/8
0.95 cm
Ancho mnimo de la viga b = 2*rec+2*fest+(# barras-1)*eh+#barras*fbarra
Ancho mnimo de la viga b =
24.94915 cm
FALSE
RECALCULAR
barras de f 5/8"
Usar acero 5/8"
2
Usar acero 1/2"
barras de f 1/2"
0.950
dc
b
0.200
barras de f 5/8"
PROYECTO
EXPEDIENTE
ZONAL
DATOS
ALTURA DE ZAPATA CIMENTACION (m)
TIPO DE TERRENO
(Kg/cm2)
ANCHO DE PUENTE
(m)
LUZ DEL PUENTE
(m)
ALTURA DEL ESTRIBO
(m)
ANGULO DE FRICCION INTERNA (grado)
ALTURA EQUIV, DE SOBRE CARGA (m)
PESO ESPECIF, RELLENO
(Tn/m3)
PESO ESPECIF, CONCRETO
(Tn/m3)
d =
1.00
d =
3.31
A =
4.50
L =
16.00
H =
8.80
f =
35.00
h' =
0.60
g1 =
1.60
g2 =
2.30
M =
1.00
N =
1.50
E =
1.52
G =
2.48
a =
1.200
b =
1.48
c =
1.00
B =
6.50
f'c =
175
fc =0.4f'c=70 Kg/cm2
0.27
0.624 TN
0.188
0.595
0.50
Xi(m)
4.0848
0.188
4.27255045
Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)
0.74
1.48
Mi(Tn-m)
3.022752
0.27787067
3.30062267
0.773 m
0.070 m
0.037 m
3.32 <d
CONFORME
11.09 >2
CONFORME
5.02 >2
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh
3.11 m
Xi(m)
29.955
17.480
13.285
5.737
66.457
Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)
3.26
2.02
1.01
3.11
Mi(Tn-m)
97.654
35.310
13.462
17.838
164.263
2.47 m
0.85 m
0.38 m
26.07 <d
CONFORME
2.90 >2
CONFORME
2.56 >2
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh
3.629 T
0.262 Tn/M
Xi(m)
8.969
6.653
66.457
82.079
Xv=Mt/Pi
2.02
2.02
2.47
Mi(Tn-m)
18.117
13.439
164.263
195.819
2.386 m
yi(m)
18.195
0.262
18.457
3.11
10.60
Mi(Tn-m)
56.574
2.775
59.349
3.216
0.723
0.337
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
30.90 <d
CONFORME
3.30 >2
CONFORME
3.11 >2
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh
3.44
Xi(m)
29.955
17.480
13.285
14.950
13.200
7.028
95.898
Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)
4.26
3.02
2.01
3.25
5.75
6.50
3.935 m
0.801 m
0.116 m
Mi(Tn-m)
127.609
52.790
26.747
48.588
75.900
45.679
377.312
>b/6
e<b/6,
b/6= 1.08333333
CONFORME
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
16.33 <d
CONFORME
4.91 >2
CONFORME
3.01 >2
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh
Xi(m)
8.969
6.653
95.898
111.520
Xv=Mt/Pi
3.02
3.02
3.93
Mi(Tn-m)
27.086
20.093
377.312
424.491
3.806 m
yi(m)
22.289
0.262
22.550
3.44
11.60
Mi(Tn-m)
76.781
3.037
79.818
3.54
0.72
0.16 <b/6
CONFORME
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
19.68 <d
CONFORME
5.32 >2
CONFORME
3.46 >2
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh