Sie sind auf Seite 1von 20

The Bandra-Worli Sealink

The Bandra- Worli Sea Link


• INAUGURATION June 30, 2009
• Landmark for Mumbai city
• Among the most complex & advanced
construction projects ever in India
• Major project in Mumbai metropolitan region
after Mumbai-Pune expressway
Project
• Sea link project conceived in the 1990s
• Plagued by PILs- fishermen & environmentalists
• 2004- Work started
• But drastic changes to 80% of the bridge design
• Cost escalation from Rs 350 crore to Rs 1,306
crore to Rs 1,634 crore
• MSRDC project
• Executed by Hindustan Construction Company
• Illumination by Bajaj Electricals, Rs 9 crore
Location
• Built over the Mahim Bay
• Connects Bandra(suburb) to Worli(central Mumbai)
• 8-lane-wide
• Sea link length- 5.6-km, 3.8 km over the sea
Facts
• Height of the cable-stayed tower = 43-storey
building
• Weight= 50,000 African elephants
• Steel wire used= circumference of the earth
• Cement used- 90,000 tons
• 16 lanes toll plaza, at the Bandra end

How the Sea-Link Helps
• Additional connectivity from city to suburbs
• Reduces travel time from 1 hour+ to only 7
minutes
• Decongests Mahim Causeway- 125,000 vehicles
a day
• Avoids 29 traffic lights
• Save Rs 100 crore a year in vehicle operating
costs
Problems Perceived
• Major traffic snarls at Worli, no solution figured
out
• Additional congestion on SV road and across
Lilavati Hospital
• Toll proposed- Rs 50 oneway, may dissuade a
few


Landmark
• Hot tourist spot
• Key destination in 'Mumbai Darshan' package
• Special open BEST buses between BKC & Worli
sea face
• 8-lane bridge, with 2 dedicated bus lanes
Mini-UN
• Engineering team from
• China, Egypt, Canada, Britain, Serbia,
Switzerland, Singapore, Thailand, Hong
Kong, Indonesia and Philippines worked
on the project
FORWARD THIS TO AS MANY
MUMBAIKARS AS YOU CAN

Das könnte Ihnen auch gefallen