Decision Mathematics by de Pomerai & Berry Pembetulan bagi jadual-jadual yg tidak jelas dibaca M.s. 113 Soalan No.

2 Task Duration (minutes) Preceeding activities M.s. 113 Soalan No. 3 Activity A B C D E F G H I Lay then foundations Build the walls Lay the drains Laythe floor Make the door and window frames Erect the roof Fit the door frames and the doors Fit the windows Plaster the walls and ceilings Duration (days) 3 5 2 1 2 3 0.5 2 8 Preceeding activities C A B D E,F G H A 3 B 5 C 5 A D 4 A E 5 B F 8 D,E G 3 F,C

MS 115 No 4(a) dan 4(b) Task Duration (weeks) Preceeding activities Task Duration (weeks) Preceeding activities MS 115 No 5 Actiivity Obtain and install machine A Obtain and install machine B Obtain and install machine C Make part A Duration (weeks) 5 9 16 4 A 3 B 9 C 3 D 1 E 4 A F 3 B,E G 8 C H A C I 5 D J 7 D K 8 H,I L 10 J

A 5

B 6 A

C 10 A

D 6 B

E 12 B,C

F 4 C

G 11 D,E

H 5 E,F

I 5 G, H

Make part B Assemble the piece of equipment Make the test rig Test and dispatch

7 7 25 8

MS 122 Activit CA y N A B C 1 2 3 These are connected directly to the start vertex This is preceeded by A and B, but step 4 is satisfied

Step 1: Set CAN at 1, time at 0. Begin at the start vertex and number the first activity connected to it 1. Step 2: Allocate CAN to other activities connected directly to the start vertex Step 3: Consider activities that immediately follow those already numbered : allocate CANs to them in turn

D G E F

4 5 6 7

G, like D, is directly connected to C Step 4: Where an activity isdirectly preceeded by more than one other, it cannot be allocated to a CAN untill all directly preceeding activities are numbered Preceeded by F and G, step 4 is satisfied Stop Step 5: Stop when all activities have been numbered

H I

8 9

MS 126 CA N 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H I J K Activity Agree details of lease Remove fire places and fittings Rewire Strip the wall paper Burn off old paint Install central heating Replaster Sand the floof and the woodwork Varnish the floor Paint the ceiling Paint the woodwork Duration 4 2 2 1 2 3 3 3 2 1 2 Preceeding Activity A A A A B,C D,F G,E H I I No of workers required 1 2 2 1 2 2 2 1 1 1 1

12 13 14

L M N

Repaint the walls Replace the fittings Clean up

2 1 1

J L,K M

1 1 3

MS 129 No 4 Duration A B C D E F G H I J K 4 7 5 2 3 5 2 6 2 3 3 Preceeding activity Number of workers required 1 1 1 2 1 1 1 2 1 1 1

B,C A,B E E,H D G,F F H

MS 129 No 5 Activity A B C D E F G H I J K Dig the foundations Pour the foundations Build the walls Erect the roof Make the windows and walls Install the windows and walls Install the plumbing Install the electrics Plaster the internal walls Decorate Landscape the gardens Duratio n 12 8 10 6 7 2 4 3 4 5 7 Preceeding activity A B C C,E C D,F G,H I G