SAIC-A-2023
WBS / BI / JO NUMBER
1-Dec-06
MECH.
CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
EQPT CODE
SYSTEM ID.
PLANT NO.
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
ITEM No. A
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
General Requirements for Systems with Air or Inert Gas ... USE SATR-A-2010 Note 1: (Bubble Leak Test at 5-10 psi in association with Pneumatic Strength or Service Test in lieu of Strength Test) Note 2: Use this checklist in conjunction with SAIC-A-2020, SAIC-A-2021 & approved ASME V Procedure (SAIC-A-2005) Approved Bubble Test Procedure & Pressure Test Package is available at site before testing commences. (GI-2.102 also available) Note: Test procedures are understood and followed by trained test crews & Inspection personnel in attendance. Thorough visual inspection of equipment/system to be tested has been performed including all piping components included in the test limits as shown in the Test diagram and approved P&ID. Note: Designated "A" items in Pre-Test Punchlist are corrected. Construction completeness has been accepted. Adequate thread engagement (maximum two full threads visible rule) & final flange installation has been accepted in systems under test. SAIC-L-2015 & SAIC-W-2037 has been completed for system Due consideration is given to available lighting for examination and surface temperatures of metal during testing. During hot weather, leak tests are early in the day (morning). Tests done at night have adequate artificial lighting for inspectors performing visual exams. Pressure gages & recorders are currently calibrated before tests. A minimum of two pressure gages are required for the test system. One pressure gage shall be on the test pump and the other(s) on the test system. Their accuracy shall be within 5% of one another. During the application of the test pressure, all in-line valves if not used as test isolation valves are in an open position. All flange joints are double-layer taped 360 degrees with a 4-6 mm hole punched at the high point for detection of leaks. (Procedure). Note 1: Avoid Gray duct tape use on SS systems (High Chlorides) Note 2: A Ball Point Pen is used to punch a singular hole in tape. Proper test medium (inert gas or steam) is used as specified in the approved leak test procedure. Means of control for access to site is in place (Safety Precautions) When performed with a pneumatic test, bubble leak tests shall be performed & evaluated AFTER Pneumatic Strength tests by safely lowering systems under test pressure to a pressure of 10 psi. Note: Recommended also is the practice of checking for leaks "on the way up" during pressurization to 50 % of pneumatic strength test pressures. Reason: Leaks at 50% of test pressure will still be found at 10 psi. This is a cost savings (time spent) due to rework. When performed with a service test, bubble leak tests shall be performed at 5-10 psi PRIOR TO achieving Service Test Pressures. SAES-A-004, Para. 7.1.1
A1
A2
A3
SAES-A-004, Para. 5.6.1 SAES-A-004, Para. 7.1.5 SAES-A-004, Para. 7.1.5 c SAES-A-004, Para 8.1.3 SAES-A-004, Para. 5.6.1
A4
A5
A6
A7
A8
A9
A10
A11
Page 1 of 3
SAIC-A-2023
WBS / BI / JO NUMBER
1-Dec-06
MECH.
CONTRACTOR / SUBCONTRACTOR
ACCEPTANCE CRITERIA
PASS
FAIL
N/A
RE-INSP DATE
SAES-A-004, Para. 5.6.1 SAES-A-004, Para. 5.6.1 SAES-A-004, Para. 5.6.1 SAES-A-004, Para. 5.6.1
B4 C
C1
C2 D D1
SAEP-1160, Section 8
REMARKS:
REFERENCE DOCUMENTS: 1. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 2. G.I.-2-102, Pressure Testing Safely, (22 July, 2002)
Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Y = YES
N = NO F = FAILED
Page 2 of 3
SAIC-L-2015
WBS / BI / JO NUMBER
1-Dec-06
PIPE-
CONTRACTOR / SUBCONTRACTOR
E) Considers workmanship & inappropriate use of wrenches: Prevent deep gouges in galvanized piping that violate minimum wall thickness. Prevent carbon steel contamination to SS & other metallurgies. Procedure states: Strap wrench or protective wrapping shall be used in a good workmanship effort to prevent damage & CS contamination on threaded piping
CLEAN, RETAP, RECHASE THREADS AFTER INADEQUATE HANDTIGHT ENGAGEMENT BEFORE REJECTION.
ENSURE APPLICATIONS FOR ANY THREAD REPAIRS ARE COVERED BY THE REPAIR PORTION OF THIS PROCEDURE
Page 3 of 3