Sie sind auf Seite 1von 3

Form 4A

CHANGE MATRIX (PERFORMANCE) Outcome 2 : ENVIRONMENTAL PROTECTION, CCA & DISASTER RESILIENT LGUS
ISSUES CURRENT STATE (What is the problem of the Goals underlying issues) (Medium Term) DESIRED STATE Objectives (Short Term) INTERVENTIONS (Program, Project and Activities)

FRESHWATER ECOSYTEM MANAGMENT


Coastal Erosion and River Some coastal areas prone to To minimize recurrence of To restore or rehabilitate Construction/improvement/rehabilitation Siltation storm surges and near river flooding. eroded river banks. of erosion control, sea walls and flood banks are eroded. control structures. Construction/improvement /rehabilitation of river walls. e-BAMBOO Plantation along river banks. Mangrove Forestation. Some rivers are silted. To de-silt and re-channel rivers River dredging and rechanneling projects. causing flooding. URBAN/RURAL ECOSYSTEM MANAGEMENT Drainage Facilities Some drainage facilities are Effective and efficient To establish/improve and Improvement/rehabilitation drainage silted and undersize, thus choke drainage system. rehabilitate drainage systems facilities. free flow of water. and facilities. Construction of comprehensive drainage system in urban areas. Some drainage structures are DRR CCA resilient To replace timber bridges into made of timber materials, which drainage/bridge permanent structures. Construction of steel or concrete bridges. are perennially damaged. structures. To replace of pipe culverts into Construction of box culverts. Un-available timber materials to box culverts. rehabilitate timber bridges..

Form 4A CHANGE MATRIX (PERFORMANCE) Outcome 2 : ENVIRONMENTAL PROTECTION, CCA & DISASTER RESILIENT LGUS
ISSUES CURRENT STATE (What is the problem of the Goals underlying issues) (Medium Term) Institutionalized PDRRMO. DESIRED STATE Objectives (Short Term) INTERVENTIONS (Program, Project and Activities)

DISASTER PREPAREDNESS 1. PDRRMO Full PDRRMO is not fully established Establishment as an office without plantilla positions.

the To operationalize the Creation of the Office with plantilla PDRRMO with appropriated positions and budget. budget and plantilla positions.

2. PDRRM Response

Lack of adequate, effective and in-efficient disaster operations and response mechanisms.

Institutionalized response.

quick Institutionalized ALERT Enhance response mechanism, standard response in the Mainland and operating procedures and protocols. Siargao Island. Organized and trained response teams.

Lack of capacity quick response groups, rescue gears and equipment in the Mainland and Siargao Island. Lack of temporary shelters.

-do-

Established and equipped 24-7 Capacity development of quick response. quick response and Built-up and acquire necessary response monitoring. gears and equipments. Establish quick response zones. as Construction of Day Care Center cum Evacuation Centers. Construction of Young Lives Training Center Cum Evacuation Center Construction of Facilities cum evacuation centers. resilient To relocate high risk schools to Relocation of schools. safer areas. To upgrade gravel roads to Upgrading and concreting of gravel roads. concrete structures.

Sufficient facilities used Established facilities for evacuation. evacuation center.

Vulnerability of infrastructure Some facilities such school Disaster to hazards. buildings, Caraga Hospital, water infrastructures. system and roads are vulnerable to multi-hazards.

To improve/rehabilitate Improvement/rehabilitation of roads. existing roads into all weather roads. To improve water Improvement/rehabilitation of waters transmission and distribution systems. lines.