Sie sind auf Seite 1von 16

Technical Proposal for Hybrid Dual Power System Solution

2013-9-30

Huawei Technologies Co., Ltd.

Technical Proposal for Hybrid Dual Power System Solution

Contents
1 Overview ......................................................................................................................................... 5
1.1 Background .................................................................................................................................................... 5 1.2 Key Benefits ................................................................................................................................................... 5 1.3 Solution Introduction ..................................................................................................................................... 6 1.3.1 Working Principles of Outdoor Scenario ........................................................................................... 6 1.3.2 Principle of battery Charging .............................................................................................................. 8 1.3.3 Monitor and Management ................................................................................................................... 9

2 Components of Dual Power Hybrid Solution ..................................................................... 11


2.1 Power system............................................................................................................................................... 11 2.1.1 Specification .................................................................................................................................... 12 2.2 ACB Cycle Battery ....................................................................................................................................... 13 2.3 ACB Cabinet ................................................................................................................................................. 14 2.3.1 Appearance ......................................................................................................................................... 15 2.3.2 Parameters .......................................................................................................................................... 15

3 BOQ ............................................................................................................................................... 16

2013-9-30

Huawei Confidential No spreading without permission

Page 2 of 16

Technical Proposal for Hybrid Dual Power System Solution For PTCL Pakistan

Figures
Figure 1-1 Components of Hybrid Dual Power Solution for Outdoor Scenario ......................................... 6 Figure 1-2 Power supply process of AC supply .......................................................................................... 7

Figure 1-3 Power supply process of battery supply ...................................................................................... 8 Figure 1-4 Charge Curve after 100% DOD discharge ............................................................................... 9 Figure 2-1 Appearance of the power system ................................................................................................ 12 Figure 2-2 shows the appearance of ACB battery ....................................................................................... 14 Figure 2-3 Appearance of the Integrated Cabinet ....................................................................................... 15

2013-9-30

Huawei Confidential No spreading without permission

Page 3 of 16

Technical Proposal for Hybrid Dual Power System Solution

Tables
Table 2-1 Technical parameters of the rectifier ............................................................................................. 12 Table 2-2 Technical parameters of the ACB battery..................................................................................... 14 Table 2-3 Technical Parameters of the Battery Cabinet ...................................................................................... 15 Table 3-1 BOQ For PTML ................................................................................................................................ 16

2013-9-30

Huawei Confidential No spreading without permission

Page 4 of 16

Technical Proposal for Hybrid Dual Power System Solution

1
.

Overview

1.1 Background
The commercial power supply is short in Pakistan. There is 4-12 hours CP shortage everyday for different area and different seasons. At the same time, Pakistan is one of the top hot regions in the world, which leads to high pressure to the battery which doesnt have good cooling system. As the world leading vendor, Huawei provides the Hybrid Dual Power System for the high compared high power consumption sites. With the help of fast charging battery (ACB) and Air-Conditioner cabinet, the Hybrid Dual Power system will save the OPEX with a big scale.

1.2 Key Benefits


Compared with the traditional solution, the Hybrid Dual Power Solution has some advantages as follows: Fast Charge; it can full charge the battery in less than 2.5 Hours in 85% DOD; The charge current can get to 0.4C; High charge acceptance to ensure rapid and complete recharge; Long Cycle Life: cycle life up to 3500 times @ 85% DOD, 35; Fast deployment: easy to install because it is smaller adopts a modular design and integrates storage batteries, Intelligent management: Monitors the ACB batteries and PSU modules, keep the ACB in a high charge acceptance and high reliability; the system provide SMS function and reports alarms over dry contacts; Level-B surge protection: Standard surge discharge current: 30 kA, 8/20 s

Maximum surge discharge current: 60 kA, 8/20 s


High Heat Dissipation Capability: can get to 1600W


Long back up time; ACB can power the load for 6 Hours when the mains lasts more than 2 hours;(if the mains lasts time less than 2 hours, the backup time will be reduced). if you want to add the reliability, we advise you to add the back battery; it

2013-9-30

Huawei Confidential No spreading without permission

Page 5 of 16

Technical Proposal for Hybrid Dual Power System Solution will go on power the load when the ACBs DOD get 85%; ( we suggest the capacity of the back battery can power the load for more than 3 Hours)

1.3 Solution Introduction


Hybrid Dual Power Solution construction diagram is showed in figure1-1 .The system is composed of Power System (manage the battery), ACB (Advance Cycle battery)

Figure 1-1 Components of Hybrid Dual Power Solution for Outdoor Scenario

1.3.1 Working Principles of Outdoor Scenario


The commercial power is the preferential source for supplying the main equipment. When the commercial power is available, it will both power the equipment and charge the battery.

2013-9-30

Huawei Confidential No spreading without permission

Page 6 of 16

Technical Proposal for Hybrid Dual Power System Solution

Figure 1-2 Power supply process of AC supply

When the commercial power is faulty, the battery will supply for the load.

2013-9-30

Huawei Confidential No spreading without permission

Page 7 of 16

Technical Proposal for Hybrid Dual Power System Solution

Figure 1-3 Power supply process of battery supply

When the mains recover, the mains will power the BTS and charge the battery.

1.3.2 Principle of battery Charging


In the Hybrid Dual Power Solution, the battery charge current can be 0.4C and less than 190A. This control logic ensures that current keep in this condition; when the battery is full or the battery temperature is high enough, the current will be adjust to have a long lifespan.

2013-9-30

Huawei Confidential No spreading without permission

Page 8 of 16

Technical Proposal for Hybrid Dual Power System Solution

Figure 1-4 Charge Curve after 100% DOD discharge

1.3.3 Monitor and Management


Basic Function: Hybrid Dual Power Solution implements system monitor through dry contacts, and then reports the RBS. The alarms list as follows: AC Power failure alarm DC under-voltage alarm Power system failure alarm SPD failure alarm Fuse burn-out alarm Battery High Temp alarm DC A/C Alarm Heat Exchanger Alarm

Additional Function: Hybrid Dual Power Solution implements system provides the SMS function The alarms list as follows: 2013-9-30 Huawei Confidential No spreading without permission Page 9 of 16

Technical Proposal for Hybrid Dual Power System Solution Mains fail alarm Lose phase alarm Mains over voltage alarm Mains lower voltage alarm Battery over voltage Battery lower voltage High battery temperature Low battery temperature Bat discharge over current Protection Air-conditioner fault CPMU01 Communication fail

2013-9-30

Huawei Confidential No spreading without permission

Page 10 of 16

Technical Proposal for Hybrid Dual Power System Solution

Components of Dual Power Hybrid Solution

2.1 Power system


The power system can provide DC power up to 17KW. The system contains a rectifier shelf for up to 6 rectifiers EPW50-48A/B-HE and distribution units with elements for DC-distribution, BLVD, LLVD and a power system controller. Figure 2-1 shows the appearance of Power System. Special designed rectifier for ACB which can prolong the life of ACB The battery charge current is automatically adjusted according to t battery state, the battery temperature can be controlled and prolong the life for batter

2013-9-30

Huawei Confidential No spreading without permission

Page 11 of 16

Technical Proposal for Hybrid Dual Power System Solution

Figure 2-1

Appearance of the power system

2.1.1 Specification
Table 2-1 Technical parameters of the rectifier Parameter category AC input Parameter AC input system Rated input phase voltage Description 3-phase 5-wire system 220V

2013-9-30

Huawei Confidential No spreading without permission

Page 12 of 16

Technical Proposal for Hybrid Dual Power System Solution 90Vac ~ 290Vac; input voltage of 176Vac ~ 290Vac:Full load output 2900W ; input voltage of 90Vac ~ 175Vac:Half load output 1400W ; 45Hz ~ 65Hz 35A (at 176V input) 0.99 43.2Vdc ~ 57.6Vdc 0A ~ 300A 1% 96% 200mV (020MHz) 2mV (3003400Hz) 100mV (3.4kHz ~ 150kHz) 30mV (150 kHz ~ 30MHz) 5mV (3.4 kHz ~ 150kHz) Discrete noise 3mV (150 kHz ~ 200kHz) 2mV (200 kHz ~ 500kHz) 1mV (0.5 MHz ~ 30MHz) 80A*2; 63A*2; 32A*2; 20A*2 63A*2; 32A*2; 16A*3; -20~40 -40~70 595RH 0~4800; when it surpass 3000m,the maximum temperature will decline 1 each 200m 55dB

Input voltage range

Input AC voltage frequency Max input current Power factor Output DC voltage Output DC current Voltage set-point accuracy PSU Efficiency Noise (peak-peak) Weighted noise Wide frequency noise DC output

LLVD

BLVD Operating temperature Storage temperature Relative humidity Environment Altitude Acoustic noise: Construction Cabinet Dimension

HxWxD: 1825 mm x 700 mm x 700 mm

2.2 ACB Cycle Battery


The ACB serves as the active storage battery in the Hybrid Dual Power Solution. ACBs are used as active storage batteries in the Hybrid Dual Power Solution.

2013-9-30

Huawei Confidential No spreading without permission

Page 13 of 16

Technical Proposal for Hybrid Dual Power System Solution

ACBs are made of a new type of materials and feature long service life, small size, light weight, good performance at high temperatures, and safety. They can be charged or discharged with a large amount of power and do not pollute the environment. The Hybrid Dual Power Solution uses 48 V, 50 Ah ACBs. Figure 2-2 shows the appearance of ACB battery

Table 2-2 Technical parameters of the ACB battery Items Normal Voltage Capacity DimensionL*W*H)/cell weight/cell Maximum Charging Current Limited Operating Temperature Range Recommended Operating Temperature ACB-50Ah 48V 50Ah @ 5hr to 32V @ 25 4*(106*125*420)mm 4*10Kg 1C Discharge: -2055 Charge: 055 2535

2.3 ACB Cabinet


The advantages of battery cabinet are as follow: Modular design, parts and components highly unified, good flexible cabinet expansion Assembled in site and whole mounting transportation are available; Flexible utilization, widely applicable, such as green-field site, mountain site, rooftop site.

2013-9-30

Huawei Confidential No spreading without permission

Page 14 of 16

Technical Proposal for Hybrid Dual Power System Solution The DC air-conditioner cooling for battery. The anti thief rack prevent battery from stealing

2.3.1 Appearance
Figure 2-3 shows the appearance of the integrated cabinet.

Figure 2-3 Appearance of the Integrated Cabinet

2.3.2 Parameters
Table 2-3 Technical Parameters of the Battery Cabinet Items Cooling unit Rating supply voltage Rated input power Cooling Capacity Working ambient temperature Parameters DC Air-conditioner 48V 500W(L35/L25) 1000W(L35/L25) -5 +55

2013-9-30

Huawei Confidential No spreading without permission

Page 15 of 16

Technical Proposal for Hybrid Dual Power System Solution Battery Capacity Dimension (L*D*H) Weight Color Operation relative humidity Maximum wind speed 160km/h Maximum: 400Ah/48V(one cabinet) 650mm*640mm*1800mm 150 kg Grey white 5100RH

3
1 2

BOQ
Table 3-1 BOQ For PTML NO Item Power system Power System Cabinet Mixed Power,HPS48300A-HX04,three phases five wires (220V/380V) one mains input,bottom cabling,700mm*700mm*1825mm(W*D*H), heat exchanging type,150W/K,without battery cube inside ,special for Power1000 Power Module 50A/48V Advance Cycle Battery 1 Description QTY Remark

PSU ACB 50AH

4 5

Energy Storage Unit,Advanced Cycle Battery,48V,50Ah,battery group(12Vcell),4*(106*125*420)mm,Agisso n ACB-50A


Integrated Cabinet Mixed Power,ESC-1A,-48VDC,down outlet,650mm(W)*640mm(D)*1800mm(H)None DTS,Adding SPU Installation material Installation material

Battery Cabinet Battery Cabinet

Installation material Installation material

2013-9-30

Huawei Confidential No spreading without permission

Page 16 of 16

Das könnte Ihnen auch gefallen