Sie sind auf Seite 1von 2

Project No: 12064

3 July 2009

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) (GAUT002/09-10/N0095): WESTERN UTILITIES


CORPORATION: PROPOSED MINE WATER RECLAMANTION PROJECT, GAUTENG

w Availability of the Consideration of Alternatives Report and Extension of Public Comment Period on Draft
Scoping Report and its accompanying reports from Tuesday, 14 July to Friday, 24 July 2009

We wish to inform you that the Consideration of Alternatives Report (Appendix 3 of the Draft Scoping Report) is available
for comment. This report is available on the Golder website (www.golder.co.za) as well as at the following public places:

Public place Locality Contact person Telephone

Randfontein Public Library Randfontein Mrs Marjorie Faber (011) 411 0800
Krugersdorp Public Library Krugersdorp Ms Monika Fourie (011) 951 2158
Meadowlands Public Library Soweto Ms Naomi Jayiya (011) 936 5799
Springs Public Library Springs Mrs Tebogo Kekana (011) 360 2298
Randgate Public Library Randfontein Ms Jeanine Mostert (011) 412 1363
Alberton Public Library Alberton Mrs Hilda Tshweu (011) 861 2187
Germiston Public Library Germiston Mrs Edith Kruger (011) 871 7666
Westonaria Public Library Westonaria Mrs Esme Kuipers (011) 278 3131
Orlando East Public Library Soweto Mr Victor Mphela (011) 935 1040
City of Johannesburg Metropolitan Library Braamfontein Ms Nobuntu Mpendulo/ (011) 226 0953
(Mayfair Library) Lizelle Andrews
Brakpan Public Library Brakpan Mrs Orna Kemp (011) 741 2034
Boksburg Public Library Boksburg Mrs Jacky Mokoe (011) 899 4197
Dobsonville Public Library Soweto Ms Noluthando Zililo (011) 988 9249
East Rand Metro Association Kempton Park Mr Martin Hedington (011) 391 2979
Lambton Area Residents Association Germiston Mrs Pat Pretorius (011) 872 1382
Concerned Residents Association Brakpan Mr Johan Stoltz (011) 744 2409
Florida Public Library Florida Ms Lylane Bam (011) 672 0433

Furthermore, the public comment period on the Draft Scoping Report and its accompanying reports for the WUC EIA has
been extended by a week to Friday, 24 July 2009.

Golder Associates Africa (Pty) Ltd


PO Box 6001, Halfway House, 1685, South Africa, Thandanani Park, Matuka Close, Halfway Gardens, Midrand
Tel: [+27] (11) 254 4800 Fax: [+27] (11) 315 0317 www.golder.com
Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America
Reg. No. 2002/007104/07
Directors: FR Sutherland, AM van Niekerk, SAP Brown, L Greyling, SM Manyaka
Project No XXX

We would like to thank once again the many landowners, authorities and other stakeholders who have thus far
contributed to the EIA and who have set aside time to meet with the EIA team. Your comments have been most valuable,
and have not only influenced the alignments of the various pipeline routes, but also the terms of reference of the EIA
specialist studies. We confirm again that the Draft Scoping Report will not be the last opportunity for stakeholders to
comment. The findings of the EIA will be captured in a Draft Environmental Impact Report (EIR), which will be available
for public comment in August 2009.

Please contact either myself or Mabel Qinisile if you require any further information at this stage.

We look forward to receiving your final comments on the Draft Scoping Report and accompanying reports by Friday, 24
July 2009.

Yours sincerely

VANESSA VILJOEN
EIA Public Participation Office

2/2

Das könnte Ihnen auch gefallen