Facility Maintenance

Management System

Jeremias Tanamal
Yudha Sanyoto
L. Didi Andrianto
A. Sasmito Adibowo
Moh Aditya MH
Project Description
Problem Statement

’Sub-optimal facility maintenance


’Lost/damaged items went unnoticed.
’Difficulty in procurement of equipment.
’Under-depreciated equipment value.
’Poorly-maintained equipment leading to lower
use-life expectancy.
Project Description
Proposed Solution

’Computerized information system targeted for


facility management
’For use by janitors, students, staffs, and
managers
’To be sold as a commercial product
Project Description
Additional Benefits

’Identification and aggregation of skilled people


that work within the university.
’Better brand recognition of the university in the
field of computerized information systems.
’Financial benefits obtained from the system's
licensing and training services.
Project Stakeholders
Project Sponsors

’University of Indonesia's Rectorate


’Quality for Undergraduate Education
’Indonesian Directorate of High Education
Project Stakeholders
Resource Providers

’Faculty of Computer Science


’Faculty of Engineering
’Faculty of Psychology
’Faculty of Economics
Project Stakeholders
Candidate Users

’Maintenance Staff
’Administrative Staff
’Management Staff
’Students
Project Team

’Project Manager
’Technical Writer
’System Analyst
’System Architect
’Programmers
’Testers
’Trainers
Project Schedule
Gannt Overview

March May July September November January March May July


ID Task Name 02-03 30-03 27-04 25-05 22-06 20-07 17-08 14-09 12-10 09-11 07-12 04-01 01-02 29-02 28-03 25-04 23-05 20-06
1 Meetings 18-07
27-02
14 Product Documentation
19 Requirements
24 Training/Orientation
32 Preliminary Design/Prototyping
35 Detailed Design
42 Construction
50 Change Management
54 Deployment
57 Closeout
61 Project Complete 22-06
Project Schedule
Milestones

’Start: April 21, 2003


’Final Requirements Document: August 8, 2003
’Final Design Document: October 17, 2003
’Code Complete: February 26, 2004
’Team Certification: June 16, 2003
’Final Product Documentation: March 18, 2004
’Project Complete: June 22, 2004
Quality Plan
Policies

’Properly documented system architecture.


’Properly documented source code - hypertext
document with detailed descriptions for all classes,
properties, and methods.
’Properly documented database schema.
’The system will be user-friendly.
’The user's manual will be separated into several parts:
tutorial, reference, and system administration.
Quality Plan
Quality Assurance

’Ensure that the programmers properly document their


code.
’Ensure a System Description document exists and easily
understandable.
’Ensure the requirements specifications are complete
and concise.
’Ensure the database design is properly documented.
’Performs user test often.
’Reviews the manuscripts for the user manuals.
Communication Plan
Project Sponsor

’Message/Information Need
’ Project sponsor needs infornation from project manager about
project documents and also about progress report.
’Delivery Vehicle
’ By Courier
’Frequency
’ Weekly
’Feedback
’ Provide other stakeholder about what other stakeholder need
Communication Plan
Project Manager
’Message/Information Need
’ Project Manager must receive input from Project Team members about
the progress of the project. He also needs information from internal and
external stakeholders about their information and communications
requirements, determine the best and most cost effective way in which
the requirements can be met, and record the information in a formal,
approved document.
’Delivery Vehicle
’ By courier and meeting
’Frequency
’ Weekly
’Feedback
’ Communicate with other stakeholder and coordinate with project team
member
Communication Plan
Project Team Member

’Message/Information Need
’ Project Team Member needs the detailed task from Project
manager and material from other stakeholder
’Delivery Vehicle
’ By meeting
’Frequency
’ Weekly
’Feedback
’ Provide information to project manager and other stakeholder
about the progress has been made.
Communication Plan
Other Stakeholders
’Message/Information Need
’ Needs information especially on project progress
report, and other informations
’Delivery Vehicle
’ By meeting and Courier
’Frequency
’ Weekly
’Feedback
’ Provide data and other informations to other
stakeholder
Risk Identifications

’ImpactEstimated size of project in LOC or FP


’Lack of needed specialization increases defects
and reworks
’Unfamiliar areas of the product take more time
than expected to design and implement
’Does the environment make use of a database
Risk Identifications
’Components developed separately cannot be
integrated easily, requiring redesign
’Development of the wrong software functions
requires redesign and implementation
’Development of extra software functions that
are not needed
’Strict requirements for compatibility with
existing system require more testing, design, and
implementation than expected
Risk Identifications

’Operation in unfamiliar software environment


causes unforeseen problems
’Team members do not work well together
’Key personnel are available only part-time
Thank You

Any Questions?