Sie sind auf Seite 1von 7

Shenzhen ERALED Optoelectronics Co., Ltd.

Outdoor Full color LED Display Designed ERALED

3.84 by 2.88 meters 11.06sqm PH10mm 1R1G1B DIP346 Outdoor Full color LED Video Display Solution

Contact Person: Carl TEL:0086-755 275 925 46 FAX:0086-755 275 925 67 Date:2013-6-27 Attn: Mr. Miftah Albier
Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.


Quotation list & Spare parts list & Technical specifications:

P10mm Solution 3.84by 2.88 meters 11.06 sqm


3.84 (length) 2.88(height) meters 11.06 SQM PH10mm outdoor 1R1G1B full color LED video display with high class original SILAN LED chip & MBI5024(most reliable model)driving IC, standard sealed waterproof cabinet, 15 working days delivery time, high class quality level with 5 years quality guarantee.

Item No
1 2 3 4 5 LED display body with high quality sealed waterproof cabinet(USD/SQM) LED6698(master controller IPC)(USD/SET) Sending card(LINSN801) (USD/SET) Receiving card (LINSN801) (USD/SET) 1% spare parts free charge

Quantity Unit price Total 11.06 1 1 16 1% 1248 750 220 50 0 13803 750 220 800 0

Remarks

LED display body & Control system

Total (including 1-5 items) (EXW) Special Discount Applied for you Total after Special Discount USD

15573 573 15000

Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.

Spare Parts: Spare Parts List(free charge):


Item
1 2 3 5 6 7 8 9 10 11 12 Module (pc) Module Veil(pc) LED lamps(1R1G1B 3 pcs as 1 set)(set) Fan(pc) Power & data cable of cabinet(pc) Power & data cable of module(pc) Data Cable(16-pin) of Key of the cabinet (pc) Screws of Driving IC User manual of the LED display screen, installation & control system(English version)(set) CD of the control system(original software & system configuration settings)(English version)(set) module(pc) the system (pc)

Quantity Remarks
3 3 10 1 2 2 1 2 20 10 1 User manual 1 Key components backup

13

Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.


Technical Specification (P10mm):
3.84 (length) 2.88(height) meters 11.06 SQM PH10mm outdoor full color 1R1G1B LED video display Pixel configuration 1R1G1B Red: wave length: 625~630nm;1100-1300mcd LEDs configuration Green: wave length: 525~530nm;1900-2400mcd Blue: wave length: 470~475nm;500-700mcd Pixel pitch(mm) 10 Pixel density(dots/) 10000 Calibrated brightness(cd/sqm,nit) 9500 nits(adjustable) Calibrated brightness proportion ratio R: G: B = 30%:60%:10% Color temperature 3,500 9,500 K(adjustable) Contrast ratio 4,500:1 Brightness adjustment(dimming) 100 grade auto/manual-adjustment View angle(degree)(50% brightness) Horizontal: 120 (60 off center); Vertical: 70 (+25/-45 off center) Readability viewing angle Horizontal: 150 (75 off center); Vertical: 90 (+35/-55 off center) Color capability 4.4 trillion Refresh rate(Hz) >1200 Hz Frame frequency(Hz) >60 Hz Interface port DVI interface(DVI connector) Input signal VGA, Video, AVI, MOV, MPG, DAT, VOB etc. Protection grade IP65 front side/IP54 backside LED Drive Constant-current drive Lifetime(hours)(50% brightness) 100,000 hours Signal transmission direction Horizontal Operating temperature(Celsius degree) -30+65' Storage temperature(Celsius degree) -35+70' Operation humidity(RH) 0-95% Storage humidity(RH) 0-99% Servicing Front and back serving optional Control mode Synchronous & asynchronous available Communication options Wire Ethernet, Fiber Ethernet, RF wireless, GPRS Power 120/240 V AC single phase(50-60Hz) Maximum power consumption(W/SQM) 750 Average power consumption(W/SQM) 300 Screen operation mode(scan/static) 1/4 Module configuration(Pixels quantities of the Length 16 module) Height 16 Module dimensions(mm) Length 160
Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.


Cabinet configuration Height 160 Length 6 Height 6 Length 960 Height 960 Width 150 Length 4 Height 3 Length 3.8400 Height 2.880 SQM 11.06 Min 6 Max 136 Length 384 Height 288 1.3333333 1 cabinet in a packing case(2 or more cabinets in 1 packing case when the unit cabinet size is smaller than 0.5SQM) Wooden case/carton/flight case(optional) 15 6.5 Length 1124 Height 1224 Width 314 net gross 608 821

Cabinet dimensions(mm) Screen configuration(Finished complete screen system) Screen dimensions(m) Screen Size() Recommend Optimal Viewing Distance: Minimum & Maximum Resolution ratio(dots/pixels) Aspect Ratio(L:H) Packaging configuration Packing material Packing quantities Packing volume(CBM) Packing Dimensions(mm)

Packing weight(KG)

Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.


Remarks: 1. Warranty: 1) Guarantee time: 3 years quality guarantee (guarantee period), and we will provide free parts for replacement if any problem belongs to us during this period; after the guarantee period, the seller should provide spare parts for replacement based on cost charge. 2) Responsible for permanent maintenance. During the guarantee period, the maintenance is free of charge ( except the defectiveness resulted from man-made damage or force majeure). 3) During the guarantee period the buyer can return the defective components due to technical or quality problems to the seller. The seller is obligated to finish fixing within 5 working days after receiving, and send it back to the buyer without any repairing charge (but the buyer has to pay the delivery cost). 2. Technical support service & training: 1) Technical support: 7 days a week, 12 hours a day for 5 years on-line service for any technical support for any customers. 2) Free training: You could send your engineers who have some knowledge of electronics and computer to our factory and we will provide one week free of charge training of how to maintain and repair. 3. Installation service: The seller should provide on the-spot installation instruction service for the buyer, including: 1) To check whether the bracket and frame are in conformity with the technical requirements of the structure scheme the seller provided 2) To train the buyers technicians. Field support is also available if the customer pays the tickets, boarding & labor cost. 4. L/T (Delivery time):7-30 working days after receiving the deposit (for standard product models) 5. Payment term: T/T 30% as deposit before production, T/T 70% balance payment before delivery.(The Party B/the buyer should pay for the bank handling charge fee which is around 40 USD, if not the Party A has the right to claim for this loss and not deliver the goods) 6. Party A(the seller/ERALED) has the right to: 1) Demand the balance payment if the Party B doesnt make balance payment in 60 working days 2) Claim the storage fee(0.5% of the total contract amount per day) of the goods if the Party B doesnt make balance payment in 90 working days 3) Confiscate the goods if the Party B doesnt make balance payment in 120 working days 7. Packing: the Party A should offer free neutral carton packing. 8. Shipping: the Party A can offer shipping service when the Party B pay the corresponding shipping fee. 9. Quality inspection standard: the Party A should offer free inspection service, the Party B has the right to inspect the goods according the national standard,
Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Shenzhen ERALED Optoelectronics Co., Ltd.


10. The Party B (the buyer) has the right to refuse the goods if the product's quality cannot reach the national quality standard. 11. During the contract's deadline for performance, both parties can be free of duty if caused by force majeure. 12. But both parties have the duty to inform the other party the force majeure reasons in 3 working days when force majeure happened. If not, the corresponding responsible party has to pay the other party the loss caused. 13. Both parties cannot modify the contract without the permission of the other party. After the contracted signed and take effect, any party want to modify the contract need to discuss with the other party can sign a new agreement as the supplementary contract of the original contract. 14. Any dispute happen, the corresponding party has the right to claim the lawsuit in the Party A's local court. 15. Beneficiary Bank Account Details: Beneficiary Company Name: ERALED OPTOELECTRONICS CO., LTD Beneficiary Company address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Beneficiary Bank Name: HSBC Hong Kong Beneficiary Bank Address: NO.1 QUEENS ROAD CENTRAL, HONG KONG Beneficiary Bank Account No.: 640 138 152 838 Beneficiary Bank SWIFT NO./Address: HSBCHKHHHKH

Address: ERALED Industry Park, Xincheng Road, Shajing town, Bao an District, Shenzhen, China Email: carl@eraled.biz MSN: carl@eraled.biz skype: carl.eraled.biz

Das könnte Ihnen auch gefallen