Sajid Shaikh

Assistant Project Manager at Schneider Electric Industrial Services shaikhsajid24@gmail.com

Summary
Experience in Installation, Design & Estimation of Electrical & Mechanical Systems for Airports, Ports, Oil & Gas, Power Plants, Substations, Buildings, Shopping Malls, Water Treatments Plants, Infrastructure Sectors. Specialties: Load Flow, Short Circuit & Harmonic Analysis, Arc Flash, Load Shedding Power System Protection Design & Protection Coordination, Transient & Volatge Stability Project Management: Deployment: Deploy required resources, equipment and execute project in given budget. Team Management : Select an effective team, Organize & Run meetings, Communicate with team members about the tasks & targets to be achieved to meet project milestones, use techniques to encourage individual contributions & get the best out of each individual & the team. Process Improvement Tools: Use a selection of methods that promote creative decision making, use range of graphical tools that help with creative problem solving Decide on the goals of the activity, make sure goals meet the customer expectations & are inline with the strategy of organization. Project Tracking: Be able to plan & maintain the project schedule usng project management tools such as Gantt Charts,and monitors Project schedules and ensures all deliverables are completed in time and within the budget. Develop sveral options for design & choose between them which ever is cost effective solution. Proposals Bid preparation and submission Vendor evaluation, techno commercial analysis, cost analysis

Developing Preliminary design documents, drawings, calculations of Electrical systems like FEED, Power System Studies, Cabling, MV Switchgear, Generators, Transformers, Relay Panels, MV & LV Motors, MV & LV MCCs, Lighting, UPS, Battery sizing, cable containments, cable trenches for Industrial, Oil & Gas, Ports, Airports & Commercial projects. Familiar with EXXON Mobil, Shell DEP, IEEE, NEC, Petronas, DEWA, ADWEA / ADDC, MEDC, OETC, PDO, ETISALAT, Omantel, Nawras & Civil Defense Regulations.

Page1

Experience
Assistant Manager Power Projects at Schneider Electric June 2011 - Present (2 years 1 month) Ability to develop calculation notes covering Load Calculations, Cable Sizing, Selection of Transformer & Generator Ratings, Selection of Starters, Preparation of SLDs, Preparation of Load Schedules, Breaker Sizing, Panel Design, Preparation Of Shop, Layout & As Built Drawings, Selection of DDC Panels, Fault Detection & Rectification Of Under Ground Cables, Earthing, lighting lux levels, etc from first principles. Applying Project Management Principles:

Power system studies through ETAP power system software i.e. preparation of SLD, Motor Modeling, load flow, short circuit, Transient Stability studies covering Motor Start, Faulted & Non Fault Transients Covering (Rotor Angle Stability, Voltage Recovery Stability & effects due to Motor, Thermal & Frequency recovery stability and effects due to Generators), Harmonic studies and Protection Relay Coordination, Ground Gird System study. Knowledge in various phases of the projects viz. Conceptual, FEED, Detailed Engineering, and Support to Construction team on need basis Senior Estimation Engineer Electrical at Danway Electrical & Mechanical Engineering February 2010 - July 2011 (1 year 6 months) Oil & Gas Projects AMAL Steam Surface Facilities for PDO(33KV, 6.6KV GIS Switchgears, 33/6.9 KV 20MVA, LV Transformers, Low Voltage Panels, 33KV, 6.6KV, 0.400KV Cables, Power Management System, External Lighting {Awarded through STS} as subcontract OXY Mukhaizna Pase II Projects (33/6.6KV, 6.6KV/0.415KV Transformers, 6.6KV MCC Panels, LV panels, LV, MV, Control Cabling, Lighting, Heat Tracing System, Cathodic protection System, Instrumentation etc). PDO Gharif North Rim (GNR) Production Header & Water Flood Facilities (33/11 KV Transformer, 33, 11 KV Relay Panel & Breaker, Cabling, LV Panels Etc) {Awarded through BEC Oman} as a subcontract Power Plants Power Plant Electrical System Installations at SUR 1500MW Power Plant Comprising of 4 GTs, 2 STs, GT Generator Step Up Transformer (GSUT) 390MVA, ST GSUT 495 MVA, Station Service Transformers 40/35/15 MVA 3 Winding, Auxiliary Trfr 0.5-2.6MVA, GT & ST Isolated Phase bus Ducts, Generator Breaker Unit, Generator neutral Point Cubicle, Switch Boards 11KV, 400V, DC & UPS System, HV Switch yard 220 KV, Cable works, Cable Trays, Earthing & Lightning Protection, GT & ST Control Protection,
Page2

Lighting & Small Power Works. Installation of E&I works for Fujairah Power Plant for Alstom Comprising of 5 GTs and 3 STs 450 MVA, 325MVA & 210 MVA GSU Transformer, 45 MVA & 100MVA SST, Bus Ducts, MV/LV Switchgear, DC System & UPS, Cable Support System, 400KV/11KV/LV and Fiber Optic Cables, Terminations, Earthing, Small Power and Lighting {Awarded} Airport Projects Salalah International Airport Development MC5 (33KV, 11KV cabling & Substations, SCADA, Power Management System) Supervision Committee of Abu Dhabi International Airport(SCADIA) Air Field Lighting, MV Switchgear, Visual Docking Guidance System, PLC, MV & LV Cabling, CCTV, Street Lighting, Traffic Signalling, SCADA System, LV Substations, CCRs {Awarded} Senior Electrical Engineer at Al Naboodah Construction Group LLC November 2007 - February 2010 (2 years 4 months) Projects Design & Estimated During My Tenure with Al Naboodah MEP LLC, Dubai, UAE, Few Projects listed below Industrial & Infra Projects, Substations Khalifa Port Industrial Zone ( 33KV, 11KV, LV Cabling works, 33KV, 11KV, 6.6 KV Switchgears & Transformers and 11/0.400 KV 29 Nos of Package Substations, SCADA System, PLC, Sea Water Cooling, Sewerage, Waste Water, Process Water Pumping Stations, ELV systems) {Package 260 Awarded} Al Ghadeer Development Phase I ( 33KV, 11KV Cabling works, 11/0.4 KV 20 Nos of Substations, SCADA System, Sewerage Pumping Station, Portable Water Pumping Station, PLC, ELV Systems ) The Development Of South Samkha Infrastructure 36 Nos of LV Substations, 33,11 KV Cabling, 33,11 KV Switchgear, 33,11 KV Transformers, Low Voltage Package Substations, Street Lighting, High Masts, SCADA System Sheikh Khalifa Interchange (11/0.4 KV 20 Nos of Substations, SCADA System, High Masts, Street Lighting ) Airport Projects Kuwait International Airport (B2 + G + 4 Carparking, Central & West Fire stations B+G+2+18m tower, B+G+9 Administrative building) design and build job involved in Design & Estimation of Power System (Selection of Generators, Cables, Transformers etc) Low Current Systems, BMS Kuwait International Airport Package -1 consisting of 57 LV Substations and Tunnel Lighting Services, 11

Page3

KV & LV cabling Dubai International Airport AX-014 Concourse 3(VDGS-Visual Docking Guidance System, PLC Panels, Leak Detection System, EFSO Emergency Fuel Shut Off System, Cathodic Protection System, High Masts, CCTV, Street Lighting, LV Cabling, Fiber Optic Cabling etc) {Awarded} MEP Projects Luxury Villa & Zaabeel II Majlis For Ruler Of Dubai (LV, Low Current System, BMS, Fire Alarm System) {Awarded} Gasco Non Process Buildings at Ruwais ( New Ware House Building, Operation Building, Garage & Car Wash, Masjid Building, Substation, PABX Building, Cold Store, STP Building, Chiller Yard Electrical Services) Junior Electrical Engineer (Power Projects) at Navayuga Engineering Pvt.Ltd. November 2006 - November 2007 (1 year 1 month) Bheema Lift Irrigation Project 33/11 KV Subsation, 4 MW Motors, MV Switchgear, 33 KV Overhead Transmission Line G+5 Genpact BPO office Building, Hyderabad

Courses
Junior Electrical Engineer (Power Projects) Navayuga Engineering Pvt.Ltd. ETAP APP Capacitor Banks ECODIAL

Assistant Manager Power Projects Schneider Electric Tesys T Motor Management Somove Sepam Relays Micom Relays Oracle

Senior Estimation Engineer Electrical Danway Electrical & Mechanical Engineering HSE Training MEDC Registration
Page4

Susbtation Project Management

Languages
English Hindi Telugu Arabic Urdu (Full professional proficiency) (Full professional proficiency) (Professional working proficiency) (Limited working proficiency) (Professional working proficiency)

Projects
West Qurna 1 - W3QR-7-0001-CFD - 5 Million Aed March 2012 to November 2012 Members:Sajid Shaikh, Tom Chubb, Brian Tiehen LV Substations/Local Equipment Rooms Client EXXON MOBIL/FLUOR - Gas Detection System, Fire Detection System, LV Systems, Lighting Systems, Fabrication Of Equipment Rooms, HVAC System etc, Value 5 Million Aed. GARRAF FIELD DEVELOPMENT 6.6KV & 400 V SUBSTATIONS For PETRONAS/WEATHERFORD, IRAQ - 24 Million Aed Members:Sajid Shaikh, Tom Chubb, Sony Rajan, BALRAJ CHEEMA USD 7 Million Project, comprising, MV & LV SWGR, CO2 System, HVAC, Fabrication Of Substations, Shipping Substations to IRAQ, all other Electrical Installation Works. 1W09 10MIGD pumping station - 8.78 Million Aed January 2012 to Present Members:Sajid Shaikh, Sunil Sreenivasan, Tom Chubb 1W09 20 MIGD desalination plant consists of MV Switchgear, MV Cabling, MV VFD's, MV/LV transformers, LV Panels, LV systems etc Arabian Center Shopping Mall @ Al Mirdif, Dubai - 142 Million Aed November 2007 to January 2009 Members:Sajid Shaikh, Abdul Rasheed, Sajeev Pillai, Palpandi Thangavelu, HARI PRASAD, Manish Jain, prasanth thoombayil B+G+1 Arabian Centre Shopping Mall at Al Mizhar 142 Million AED MEP works. Shopping Mall Load was 19.6 MW with 2 MV & LV Substations, Chiller Plant with 3500 Tonne cooling load, 148Kms of LV cabling inside & outside of shopping mall, 54 Kms of 11KV cabling from Awir Susbstation. The job profile includes procuring the drawings from consultants, Preparation of Shop Drawings for Low Voltage, Low current, Security Systems, Installation of Electrical Systems, Manage to ensure that all material & work completed is in line with the Project Specifications, Conducting Daily Site visits to inspect Workmanship and ensure a minimum withstand is achieved, Responsible for managing relationship with relevant Authorities and report to Project Manager regarding progress on site, preparation of operation and maintenance manuals .
Page5

SUR 1500MW Power Plant - 13 Million Aed March 2010 to June 2011 Members:Sajid Shaikh, Safeed, Venkatesh Power Plant Electrical System Installations at SUR 1500MW Power Plant Comprising of 4 GTs, 2 STs, GT Generator Step Up Transformer (GSUT) 390MVA, ST GSUT 495 MVA, Station Service Transformers 40/35/15 MVA 3 Winding, Auxiliary Trfr 0.5-2.6MVA, GT & ST Isolated Phase bus Ducts, Generator Breaker Unit, Generator neutral Point Cubicle, Switch Boards 11KV, 400V, DC & UPS System, HV Switch yard 220 KV, Cable works, Cable Trays, Earthing & Lightning Protection, GT & ST Control Protection, Lighting & Small Power Works.{For Alstom Switzerland}

Office Building B2+G+4 Floors for Alnaboodah Construction Group - 45 Million Aed December 2008 to February 2009 Members:Sajid Shaikh, Abdul Rasheed, Sajeev Pillai, HARI PRASAD, Manish Jain Office Building for AL Naboodah Construction Group of 45 Million AED MEP works, consists of LV Susbstation, Lighting Control, CCTV, Access Control, Fire Alarm & Fire Fighting Systems etc. Multiple Projects in Oman - 8 Million Aed March 2010 to April 2011 Members:Sajid Shaikh Earthing works for 220 KV S/S at Sohar Aluminum Smelter Electrical Works at Sohar Aluminium Compressor House - Installation of MCC Panels, DBs, Cabling and associated works Installation of 70 nos of 1000 KVA DG sets and associated works to meet additional power demand at 132/33KV Kaboora Grid Station Supply & Installation of 4MVA auxiliary transformers, Protection Relays & associated works for Al Kamil Power Plant Oil filtration of 2nos 4 MVA Transformers

Bhima Lift Irrigation Project - 700 Crores INR August 2006 to November 2007 Members:Sajid Shaikh Bheema Lift Irrigation Project (Pumping station to lift water from lower level to high level @about from 30mtrs depth) 33/11 KV Subsation, 4 MW Motors, MV Switchgear, 11KV VFD's, 33 KV Overhead Transmission Line.

Page6

Skills & Expertise


Power Systems Study Estimation of Electrical Projects Project Management Calculations Electrical Design For Projects Equipment Selection Excel Planning Contract Negotiations Business Management Vendor Management C AutoCAD Problem Solving Team Management Risk Management Employee Relations Customer Relations Engineering Front End Engineering Design Power Distribution Project Planning Electricians Switchgear Microsoft Excel Customer Service Commissioning Management Contract Negotiation Instrumentation Transformer Project Engineering

Education
Jawaharlal Nehru Technological University Bachelor of Technology (BTech), Electrical & Electronics Engineering, 2002 - 2006 Global University MBA Distance Learning, Project Management

Page7

Sajid Shaikh
Assistant Project Manager at Schneider Electric Industrial Services shaikhsajid24@gmail.com

Contact Sajid on LinkedIn