1.Take and record generator operation readings (from monitoring panel): Po 2.Monitor cooling air temperature at generator stator 3.Perform physical inspection and check any abnormalities. Record: Alarm a
bnormalities. Record: Alarm and Sign of Overheated [at panel],Abnormal Sound / Noise/ Hunting
se with indicator
1M-EBC MTG Online Inspctn,EGMTG02 1. 2. 3. 4. 5. Perform Daily Maintenance Tasks Perform alternator vibration reading Check bearing condition using bearing analyzer [online] and Perform visual inspection on Earthing System conection Check condition of alternator ventilation system fan
leaking
12M-PM Operational Check,EGMTG03 Check and clean PMG assembly Rotor excitation coils: Measure rotor winding resistance and
perform c
Generator rotor: Check rotor air fan for fatigue/crack. Check & tighten
Stator Exciter Winding: Perform measurement of Insulation Resistance,Oh Stator winding: Perform Megger Test,Measure Polarization Rotating diodes & Surge Suppressor: Check and measure nut
Index,Perform
resistance,Check
sign
Cooling System [Filter,Fan,Tubing ] - Check generator alternator coolin Generator bearing - Measure vibration level and Perform Generator speed sensor - Check magnetic pickup signal
lubrication fo
Synchronizing & Control panel - After maintenance : Verify synchronizat Governor System - Perform visual inpection
Miscellaneous - Ensure the winding temperature alarm setting is correct Gauges/Indicator - Check indicators and gauges for correct operation
Neutral Gounding - Check neutral grounding connection to NER and Measur Casing/Frame - Check for crack in base/support for broken or
loose par
Generator Breaker [RACKABLE TYPE] - Service generator breaker as NOTES : OPERATING PROCEDURE REVIEW
per H
1) To establish clear operating procedure with clear operating limit 2) To ensure the panel operators are competent and well trained for th 3) Establish synchronising,load control and load sharing procedures
4) 5) 6) 7)
To ensure operators are well trained and competent for the control To establish procedures for conductiong winding IR test,etc,to avoi To produce procedures for generator rotor pull out and generator ro Check and review spare part inventories: excitation control card,rot
istance and
perform cleaning
crack. Check & tighten holding bolt and screw. Check air gap and clean dirt accumulati
sulation Resistance,Ohmic,and Polarization index Index,Perform Ohmic Resistance Test and Inspect space heater
ization
functional (Ohm
sure
l inspection on
erform
: Verify synchronization capability with other generator and Test synchronizing prote
the cont
r correct
tion to NER and Measure NER value loose parts and Clean & repaint as necessary per HV Switchgear checklist
r broken or
ator breaker as
ear operating limit d well trained for the generator operation. sharing procedures
tent for the control and parallel operation of generators g IR test,etc,to avoid loss of magnetism out and generator rotor cool down as recommended by manufacturer to ation control card,rotating diodes,
ater
hysical damage and moisture,Measure IR and Polarization index for power Cable and Tigh the control and interlocking circuit,Perform fucntional check
al check on
on the ala
r to
r power Cable and Tighten bolt on the alarm and instrumentation circuit,After maintenance to perform
onal check
no
nance to
perform
perform Lo
enance to
perform Load Acceptance Test and With clean dry compressed air
clean up he
essed air
32K-PM Shutdown Maintenance,EGMTG04 SHUTDOWN INSPECTION Permanent Magnet Generator (PMG) - Check and clean PMG assembly
Rotor excitation coils - Measure winding resistance and Perform cleanin Lube oil cooler pump Motor: Perform visual
Cooling System [Filter,Fan,Tubing ] - Check generator alternator coolin Generator bearing - Measure vibration level and Perform Generator speed sensor - Check magnetic pickup signal
lubrication fo
Synchronizing & Control panel - After maintenance : Verify synchronizat Electronic Governor System - Governor system (visual
inspection),Check
Battery - Impedance test,Measure Voltage reading (Individual & total),P Terminal Box and Electrical Connection Joints - Check
Neutral Gounding - Check neutral grounding connection to NER and Measur Casing/Frame - Check for crack in base/support for broken or NOTES : OPERATING PROCEDURE REVIEW 1) 2) 4) 5) 6) 7)
loose par
To establish clear operating procedure with clear operating limit To ensure the panel operators are competent and well trained for th To ensure operators are well trained and competent for the control To establish procedures for conductiong winding IR test,etc,to avoi To produce procedures for generator rotor pull out and generator ro Check and review spare part inventories: excitation control card,rot
n PMG assembly
erform
: Verify synchronization capability with other generator and Test synchronizing prote inspection),Check and test governor system,clean magnetic speed
ual
sensor,check the
(Individual & total),Physical condition (Water level,Deformation etc) cleanliness & Water ingress/Moisture and Retighten operation
heck
r correct
tion to NER and Measure NER value loose parts or corrosion and Clean & repaint as necessary
r broken or
ear operating limit d well trained for the generator operation. procedures tent for the control and parallel operation of generators g IR test,etc,to avoid loss of magnetism out and generator rotor cool down as recommended by manufacturer to ation control card,rotating diodes,
t synchronizing protective relay (if required) sensor,check the setting,etc and Perform calibration for the
eed
Electronic Governor
r to
Electronic Governor
Permanent Magnet Generator (PMG)[If applicable] -Check and clean PMG as Rotor excitation coils - Measure winding resistance and Perform cleanin Generator rotor - Check rotor air fan for fatigue/crack,Check & tighten Stator Exciter Winding - Check :[IR,Ohmic and PI],Check RC circuit blo Stator main winding - Perform Megger Test,Measure Polarization Ratio In Rotating diodes & Surge suppressor - Change rotating diode Automatic Voltage Regulator (AVR) - AVR Panel (sign of overheating,visu Lube oil filter - Filter Replacement / Cleaning Lube oil cooler pump motor - Bearing (visual inspection),Lubrication s Cooling System [Filter,Fan,Tubing ] - Check generator alternator coolin Generator radial and roller bearing - NDE and DE :Measure vibration lev Generator speed sensor - Check magnetic pickup signal Synchronizing & Control panel - After maintenance : Verify synchronizat Electronic Governor System - Governor system (visual inspection),Check Battery - Impedance test,Measure Voltage reading (Individual & total) a Terminal Box and Electrical Connection Joints - Check cleanliness & Wat Miscellaneous - Ensure the winding temperature alarm setting is correct Gauges/Indicator - Check indicators and gauges for correct operation Neutral Gounding - Check neutral grounding connection to NER and Measur Casing/Frame - Check for crack in base/support for broken or loose par 1) To establish clear operating procedure with clear operating limit 2) To ensure the panel operators are competent and well trained for th 3) Establish synchronising,load control and load sharing procedures 4) To ensure operators are well trained and competent for the control 5) To establish procedures for conductiong winding IR test,etc,to avoi 6) To produce procedures for generator rotor pull out and generator ro 7) Check and review spare part inventories: excitation control card,rotating diodes,
Check and clean PMG assembly ce and Perform cleaning / Refurbish winding /crack,Check & tighten holding bolt and screw,Check clearance between rotor & stator , ,Check RC circuit blocks and Overvoltage Protection and Check characteristic of the Polarization Ratio Index Perform Ohmic Resistance Test,Inspect space heater [RTD] fun ing diode gn of overheating,visual check,etc ),Perform calibration inspection and Control card i
pection),Lubrication system (leak check,visual inspection,cleaning) and Perform IR an ator alternator cooling system [Cleanliness,Blocked etc] and Perform IR and PI test fo :Measure vibration level,Change roller bearing lubrication /greasing for bearing - For
: Verify synchronization capability with other generator and Test synchronizing prote ual inspection),Check and test governor system,clean magnetic speed sensor,check the (Individual & total) and Physical condition (Water level,Deformation etc) heck cleanliness & Water ingress/Moisture and Retighten bolts[Generator terminal and C arm setting is correct/calibrated and functional,Perform functional check on the contr r correct operation tion to NER and Measure NER value r broken or loose parts or corrosion and Clean & repaint as necessary ear operating limit d well trained for the generator operation. sharing procedures tent for the control and parallel operation of generators g IR test,etc,to avoid loss of magnetism out and generator rotor cool down as recommended by manufacturer to avoid rotor unb ation control
ween rotor & stator ,To check wedge,To check retainer rings for looseness,Cleaning wit haracteristic of the Diodes pace heater [RTD] functional (Ohmic value,IR),Perform cleaning of the winding [e. g. r
ng) and Perform IR and PI test for motor [Refer Appendix 12 PTS 63100811] orm IR and PI test for motor ing for bearing - For non self lubricate,Perform Insulation Resistance,Perform clearan
t synchronizing protective relay (if required) eed sensor,check the setting,etc and Perform calibration for the Electronic Governor ion etc) erator terminal and Control terminal] al check on the control and interlocking circuit,Perform functional check on the alarm
r to
looseness,Cleaning with Dry Ice/CO2 or Compressed air & Electrical Solvent,Rotor insul
f the winding [e. g. recommended using CO2] ,Partial Discharge,To check wedge,Check st
63100811]
stance,Perform clearance check between housing and bearing and Check condition for whi
Electronic Governor
nal check on the alarm and instrumentation circuit,After maintenance to perform normal
l Solvent,Rotor insulation resistance,Voltage drop test to ensure rotor coil turns are
check wedge,Check stator core for loosenes/ blocked cooling channel,Check stator wind
eck condition for white metal [sleeve bearing] and change if necessary
nce to perform normal generator output Load test and After maintenance to perform Load
rotor coil turns are balanced ,Rotor Earthing Connection & EF Detection: Carbon brush
etection: Carbon brush inspection method etc. Partial Discharge check at winding : for
ss of spacers between coil and support ring,HIPOT test for all the windings [with redu
heck at winding : for signs of PD if was not rewounded. Check winding HotSpot especial
e windings [with reduced voltage to 1. 5 times] and Tangen Delta measurement [to check
nding HotSpot especially at end winding (visual signs),Rotor Dynamic Balancing Test ,T measurement [to check each winding phase health]
mic Balancing Test ,Tangen Delta measurement and Inspection of End Winding and Spacer
18M-PM Replace Air Filter,EGMTG06 replace air filters, fuel injectors & combustion liner
24M-PM Replace Injector,EGMTG07 replace injectors, thermocouple and main battery pack