Sie sind auf Seite 1von 20

2009-8-15

Security Level:

IPS1000 Power Distribution Installation and Connection (For TMIC project P02)
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

INTERNAL FUNCTION OF IPS1000:

BMU IPS1000 ATS ACDB

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2

Work Principle of 1+0 Energy System


About 6hrs

Battery is fully charged

D.G Starts to powers the BTS and charges the Battery

D.G. stops and Battery discharges to power the BTS

Battery discharges to a setting residual capacity(40%)

Depended on the consumption of the site and batterys age.

Remark: For some 1+0 sites which have EDC, the site will use the EDC first, if the EDC is off, the DG and battery will cycle like the sites which have no EDC, anytime the EDC is available, the system will switch to EDC to supply for the site.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

SITE POWER CONNECTION CHART FOR OUTDOOR GREEN FIELD:


BY CIVIL WORK SUB-CON Socket Guard Room

optional ACDB
Mains (DG2) Done by CW Sub-con TE equipment Done by TE Sub-con

Lighting

BTS

Gen-set

IPS1000

Battery (-48V) (Mini shelter) Done by DG Supplier

Alarm cable

Power cable Huawei Confidential Page 4

HUAWEI TECHNOLOGIES CO., LTD.

DETAIL CONNECTION FOR IPS


From IPS
L1 L2 L3 N

EDC

See next for the connection

DGS POWER CABLE ACDB

DGS BATTERY CABLE DG START SIGNAL CABLE HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5

SETAIL CONNECTION OF MINI SHELTER AND IPS


Mini Shelter Current transformer DC power connection at APM30

From Mini shelters door fan

1 2 3 4 5 6 7 8 9 10 11 12

Alarm connector for Mini shelter

From Temperature sensor in Mini shelter From Door sensor of Mini shelter

Connect to Batt. temp in APM30 Connect to APM30 door sensor (see next page)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

BTS

Take this short connector out and connect the door alarm cable from Mini shelter

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

PGND

-48V

M G

BMU Fail SPD Fail To DG start

+
(To APM30H)

To DG Battery

From Current transformer To mini shelter Bus bar (at mini shelter)

CONTROL CONNECTION AT IPS (Done by DG supplier)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

DG Installation(1.2)---EDC AC Power Cable

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

AC Cable Connection from ACDB to APM30

L1 L2 L3

See next

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

Instruction to change the AC power input from 1 to 3 phases supply for Green field BTS outdoor site
APM30 Panel N From ACDB L1 L2 L3

AC power input connector

Take this out from the connector board

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

Battery Cabinet Installation(1)---Summay Chart

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

Battery Cabinet Installation(3)--Connection Between Battery and IPS/Power System


MG

1-2

RTN -48V

Fan Power Input Power System Battery Input Port IPS


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12

Battery Cabinet Installation(2)---Install Current Sensor

! Make sure the connector is faced down to the floor


otherwise the current transformer doesnt work.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 13

DG Alarm Connection for (1+1) site


APM30H
GEN2 RUN GEN2 FAULT
1 . . . . 8

1..8 1..8

1 . . . . 8

GEN1 RUN GEN1 FAULT LOW FUEL

APM30H

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 14

DG Alarm Connection for (1+0) site


APM30H
1..8
1 . . . . 8

GEN1 RUN GEN1 FAULT LOW FUEL BMU FAIL

APM30H
BMU Fail

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 15

IPS SET(2)

Note: During the commissioning, we only set: 1. 2. Batteries capacity (as the installed batteries) The date and time

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 16

IPS Start Up Instruction


1

When the power supply is coming the RUN led is blinked, if the power reached the terminals but the RUN light not ON: 1. 2. Check Switch (1) to Auto or not if not switch it to Auto Check the fuses (2) whether they are loose or not properly connected (take it out and check then put it in again and check the RUN light if the light is OK wait about 10s the transfer switch will ON then the light on the front door is ON).

Set to 0000 if site (1+0) means DG+Battery

Power Indicator (front door)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 17

IPS SET(3)
1Set the power switch of the BMU to OFF, disconnect the EDC inputif EDC is available, set the diesel generator to the automatic mode, then the diesel generator will start automatically. 2Set the power switch of the BMU to ON, set the diesel generator to the Test Mode, select ATS Control, press the ENT button of control panel, select Close and press ENT button to stop the diesel generator. 3Exit the Test Mode and the diesel generator will start to supply power 3 automatically. 4Connect the EDC input if EDC is available, the IPS will start the EDC to supply power and the diesel generator will stop work a moment later automatically. 5After the test, close the door of each cabinet and give the key to the person in charge for proper management.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 18

All the accessories in IPS1000s box

CT sensor

Accessories for IPS1000 (in the box)

Control cables terminals Grounding Terminal Fire proofing Mud (use to close the hole of PG socket after finishing the installation) (Note: dont forget to connect this cable)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 19

Thank you
www.huawei.com