Sie sind auf Seite 1von 5

SUMMER TRAINING REPORT

At
DOORDHARSAN DELHI

Submitted By

AMBUJ KUMAR
(9910103509)
(Electronics and Communication Engineering)

JAYPEE INSTITUTE OF INFORMATION TECHNOLOGY


NOIDA

CERTIFICATE

This is to certifythatAMBUJ KUMAR (9910102316), a candidate of B.Tech from Jaypee


Institute of Information Technology University, NOIDA. Completed 6 week
(3rd June, 13 15th July, 13) vocational summer training program at Doordharsan
Delhi,under my guidance and direction.

Signature of guide
Mr. R.N.Rai
(Asst. Director Engineer)
Date: 15 June, 2013

DECLARATION

I hereby declare that work entitled summer training report, submitted towards completion of
summer training after 3rd year of B.Tech (ECE) at Jaypee institute of information technology
Noida, comprises of my original work pursued under the guidance of
Mr.R.N.Rai (Asst. Director Engineer)
The results embodied in this report have not been submitted to any other Institute or University
for any award.

Ambuj Kumar
(9910103509)
Branch - ECE

AKNOWLEDGEMENT

It is not possible to prepare a summer training report without the assistance and encouragement
of other people .This one is certainly no exception.
On the very outset of this report, I would like to extend my sincere and heartfelt obligation
towards all the personages who have helped me in this endeavor. Without their active guidance,
help .cooperation and encouragement, I would not have made headway in the project.
First and foremost, I would like to express my sincere gratitude to my project guide, Mr.R.N.Rai
(Asst. Director Engineer)
I was privileged to experience a sustained enthusiastic and involved interest from his side. This
fuelled my enthusiasm even further and encouraged me to boldly step into what was a totally
dark and unexplored expanse before me. He always fuelled my thoughts to think broad and out of
the box.
I would like to thanks Mr. Mr. S.D. Mishra (Senior Engg. Asst) who, instead of his busy
schedule, always guided me in right direction.
I would like to thanks Mr. Sanjay Trivedi (Engg Asst.) to given me a chance to do this training
and the entire staff member for motivation guidance and support throughout the training.

Thanking You
Ambuj Kumar
(9910103509)

TABLE OF CONTENTS
ABSTRACT
Chapter 1 INTRODUCTION
1.1 Studio Centre .............................................................................................................................1
1.2 Broadcast Studio .......................................................................................................................2
1.3 Studio Operational Requirement ...............................................................................................2
1.4 Mixing ..................................................................................................................................... 2
1.4.1 Low level Mixing .................................................................................................................. 3
1.4.2 High level Mixing ................................................................................................................. 4
1.5 Announcer Console ...................................................................................................................4
1.6 Control Room ............................................................................................................................5
1.7 Master Switching Facility .........................................................................................................6
Chapter 2 FACALITIES IN STUDIO CENTRE
2.1 Recording Room.....7
2.2 Dubbing Room ......................................................................................................................... 7
2.3 Loud Speaker..8
2.4 Head Phones...8
Chapter 3 TRANSMITTERS
3.1 2x3 kW FM Transmitter ..10
3.1.1 Exciter (SU 115)............11
3.1.2 Frequency Generation, Control and Modulation ..........11
3.1.3 Adapter Unit (KA 0031A1)...11
Chapter4 FM ANTENNA
4.1 Tower....12
4.2 Antenna ....12
4.2.1 Pole Type Antenna....13
4.2.2 Panel Type Antenna..13
4.3 Feeder Cable14.
Conclusion
References

Das könnte Ihnen auch gefallen