Sie sind auf Seite 1von 4

1. 0:35 - 0:45 what is on time? (assemblies parts components the finish product there on the move on time) 2.

1:08 - 1:20 what is the definition for transportation and for material handling? (moving goods on a big rig or a fast freight is called transportation the moving of goods inside a plant from place to place, station to station is c alled material handling) 3. 1:21 - :1:30 how is effectiveness of transportation & material handling judged? (the most productive use of the time avalailable)

4. 1:30 -2: 23 what did they add to the power chain? (continuous conveyors / carying trolleys story jerbys web company)

5. 1930 02:23-3:20 what is the second track all about? what about gravity? could manufacturing ops and special procedures could be performed on parts?

6. 3.20 -3:50 what is the power and free concept? assemblies parts components (power and free concept made it possible to desing complex traffic patterns into the system to meet production requirements with a minimum of manual handling or transferring on the in-process material par ts components assemblies or the completed product could be stopped or stored or recicurlated or dispatched)

7. 3.50 - 4:00 what are the advantages? (advantages: productivity increased while countless millions of man-hours were s aving)

materials handling took a giant leap forward yes/no

8.

4:00 - 4:55

a- does the mechanization of industry and the automation of manufacturing depends to a far greater degree on the moving and the handling yes no b- in the manufacturing process only a small amount of time is spent on material handling? yes no (it has been said that the mechanization of industry and the automation of manuf acturing depends to a far greater degree on the moving and the handling of the material r ather than on the futuristic techniques which can be applied to the material every improvement in material handling automation because of time in the manufacturing process only a small amount of time is actually spent machi ning assembling painting testing we spend more time handling the parts and components TIME is what productivity is all about)

9. 4:55-6:17 dOG MAGIC&FREE CONVEYOR what is the magic in dog magic?

10 . 6:17-7:55 A- explain dog magic. What are dog magic basic ingredients? B- what are the differencies between dog magic&free conveyor and power&free conv eyor? but what happens with gravity? how does dog magic gives positive mechanical control over every carrier in the s ystem? is it magic? (power&free conveyor: you simple disengage the power track from the carrier ridi ng the free track and let gravity to do the rest)

11. 7:55 - 9:40 what other features can you point out, about dog magic that enhance material han

dling efectiveness? (a programm to stop) describe stop mechanism? mechanically or automatic blade)

12. 9:40 - 9:51 explain how dog magic provides versatility to the user?

13.

9:51 - 10:15

how do you integrate material handling within a single plant? what is the meaning of line a loop and spurs? assembly / inspection / repair / test / finish / quality control / shipping

14.

10:18 - 13:33

can all production steps can be integrated into a cohesive mechanical system? yes no carrier mouvement how is it accomplished? (through switches and across transfers ) can you describe push across transfer?

15.

13:33 - 14:30

what system do they highlight dog magic full control of all carriers? (for normal or specialized assembly / for in process product testing / finish pr oduct testing / quality control / repair finishing dress up / for specialized shipping) desing options are finite or endless? 16. 14:30 - 15:17 ******problem solving**** what is dog magic? what can do dog magic? 1 / 2 / 3 / 4 / 5/

17 15:17- 15:45 can you add control devices to the individual carriers? what for? 18. 15:45 - end benefits /advantages 1 / 2 / 3 (increase production / more efficient manufacturing / greater productivity)

BETTER USE OF THE TIME AVAILABLE

Das könnte Ihnen auch gefallen