Department : Commissioning
Document Title :
Issue Date :
INDEX
Page No 1. Overview of Performance Parameters 2. List of Major systems. 2.1 HFO system. 2.1.1 List of Reference drawings and documents. 2.2 LDO system. 2.2.1 List of Reference drawings and documents 3. 3.1 3.2 4. 4.1 4.2 5. Process flowchart for HFO System. List of Equipments and Technical Parameters. Equipments Commissioning Sequence of HFO System. Process flowchart for LDO System. List of Equipments and Technical Parameters. Equipments Commissioning Sequence of LDO System. Document Revision History. 10 - 10 11 - 11 12 - 12 4-7 8-8 9-9 1-1 3-3 1-1 1-1 1-1 1-1 1-1
Reviewed by :
Approved by :
Date :
Date :
Date :
RKM POWERGEN PRIVATE LTD, 4 x 360 MW POWER PROJECT, UCCHPINDA. Department : Commissioning
Document Title :
Issue Date :
Objective: To produce filter water 4950 m3/hr. The System Comprises of sub systems as: 1. Reservoir 2. Raw water pump house 3. Cascade Aerator 4. Stilling chamber 5. Gas Chlorinator system 6. Parshall Fume 7. Distribution chamber 8. HRSCC # 1001 A ,HRSCC # 1001 B 9. Chemical House 10.Sludge pit 11.Filter water storage tank List of Equipments and Technical Parameters 1. Reservoir: Capacity : 36000 m3/hr. 2 . Raw water pump house :
Reviewed by :
Approved by :
Date :
Date :
Date :
RKM POWERGEN PRIVATE LTD, 4 x 360 MW POWER PROJECT, UCCHPINDA. Department : Commissioning
Document Title :
Issue Date :
Raw water pumps (4W+1S) 3. Cascade Aerator : Cascade Aerator (1W+0S) a. Capacity : 4950 m3/hr. b. Dim : 20m*0.76m(LD)*0.15m(FB) c. Pipeline : 1000NB MSEP 4. Stilling chamber : Stilling chamber (1W+0S) a. Capacity : 4950 m3/hr b. Dim : (L)*5.25(W)*3.0(LD) c. Pipeline : 1000NB MSEP 5. Gas Chlorinator system : Gas Chlorinator system (1W+1S) a. Capacity : 20 kg /hr. 6. Parshall Fume : Parshall Fume (1W+0S) a. Size :15m(L)*(3.0)mW*0.075m(LD)
Reviewed by :
Approved by :
Date :
Date :
Date :
RKM POWERGEN PRIVATE LTD, 4 x 360 MW POWER PROJECT, UCCHPINDA. Department : Commissioning
Document Title :
Issue Date :
7. Distribution chamber : Distribution chamber (1W+0S) a. Capacity : 4950 m3/hr. b. Pipeline : 1000NB MSEP c. Dim : (L)*5.30(W)*3.0(LD)
8. HRSCC : HRSCC (2W+0S) a. Capacity: 2320 m3/hr b. Dia : 39m*4.5m(SWD)*0.5m(FB) c. Pipeline : 1000NB MSEP S.no
1 2
Name
HRSCC - Scrapper HRSCC - Motor
Rating(KW)
3.7 5.5
Voltage(V)
415V AC 415V AC
Reviewed by :
Approved by :
Date :
Date :
Date :
RKM POWERGEN PRIVATE LTD, 4 x 360 MW POWER PROJECT, UCCHPINDA. Department : Commissioning
Document Title :
Issue Date :
Pump Name
FeCl3 unloading pumps FeCl3 dosing pumps Alum dosing pupms Poly dosing pump s
Nos
2(1W+1S) 3(2W+1S) 3(2W+1S) 3(2W+1S)
Details
10 M3/hr,1.5kg/cm2 1700 lph 1700 lph 3350 lph
Rating(KW) Voltage(V) 2.2 0.37 2.2 2.2 415V AC 415V AC 415V AC 415V AC
Tanks details S.no 1 2 3 Name FeCl3 storage tank Alum tanks Poly storage tank Qty 1 2(1W+1S) 2(1W+1S) capacity 20 m3 34 m3 67m3 details 2.4 m D*4.0 m H 3300L*3000W*4000H 5000L*4800w*3300H
10 .Sludge pit : Sludge pit (1W+0S) a. Capacity : 800 m3/hr b. Dim : 25 L* 12W * 6D
Reviewed by :
Approved by :
Date :
Date :
Date :
RKM POWERGEN PRIVATE LTD, 4 x 360 MW POWER PROJECT, UCCHPINDA. Department : Commissioning
Document Title :
Issue Date :
Pups details:
S.No 1 2 Name Qty capacity Rating(KW) 30 15 Voltage(V) 415V AC 415V AC
Sludge 2(1W+1S) 400m3/hr,6.0kg/cm2 transfer pump Sludge blower 2(1W+1S) 11.66 M3/min