SYSTEM Sprinkler

Inspections
V V

Test
V V

Descriptions

Explanation & paper work


If new sprinkler water service: Tap letter, Meter permit, RPZ test form. Fire Dept. Letter of Defect or Approval, Electrician's Letter B Form FP-85 (Only one FP85 needed per System) B Form FP-85, FP-86 & Manuf.'s pump curve B Form FP-10 Dry pipe valve report If new sprinkler water service: Tap letter, Meter permit, RPZ test form. Fire Dept. Letter of Defect or Approval, Electrician's Letter B Form FP-84 (Only one FP84 needed per system) B Form FP-84, FP-86 & Manuf.'s pump curve B Form FP-84, FP-86 & Manuf.'s pump curve PL: 30 or less heads off domestic water No FP 85 needed If new water service or sewer: Tap letter, Meter permit, RPZ test form, Sewer sign-off card

( SP )
Underground Roughing Finishing Piping beneath the earth To inspect pipes & fittings per NYC Code & Plans "Walk-through" inspection: Coverage & heads per Code/Plans Hydrostatic 200 psi / at Siamese.. / 50/100 psi at topmost head / One hour Booster Pump or Special Service Pump ( Flow test ) Dry Pipe Valve To insure the dry pipe valve is operating properly Piping beneath the earth To inspect pipes & fittings per NYC Code & Plans "Walk-through" inspection: FDC, valves & cabinets per Plans Hydrostatic 300 psi at Siamese FDC connection... / One hour Booster Pump or Special Service Pump ( Flow test ) Fire Pump Flow test per Code: Pump capacities each speed / Four hours To inspect pipes & fittings per NYC Code & Plans "Walk-through" inspection: Coverage & heads per Code/Plans 100 psi at topmost head or domestic WP / One Hour

Standpipe

( SD )
Underground Roughing Finishing

Sprinkler

( PL )
Roughing Finishing Hydrostatic

Water / San ( PL )
Underground Roughing Finishing Piping beneath the earth To inspect pipes & fittings per NYC Code & Plans Fixtures installed & connected properly Pressure test Pressure (hydrostatic) test 25% above working pressure Water Test Minimum 10 foot head of water for a minimum of 15 minutes Piping beneath the earth To inspect pipes & fittings per NYC Code & Plans Sump pump, drains, dry well/retention tanks installed Minimum 10 foot head of water for a minimum of 15 minutes Piping beneath the earth To inspect pipes & fittings per NYC Code & Plans Fixtures or appliances installed & connected properly Low pressure: 3 psi on a 5 psi gauge for 30 min. Med pressure: 50 psi for one hour High pressure: 100 psi / 4 hours Coated or wrapped pipe: 90 psi for one hour To inspect pipes & fittings per NYC Code & Plans All equipment installed & connected properly Pressure test and Certification test report

Storm

( PL )
Underground Roughing Finishing Water Test 24 Hr notice for pipe to drywell TR-1, Sewer Sign-off card

Gas

( PL )
Underground Roughing Finishing Gas test Gas test Gas test Gas test For Ansul System: Fire Dept letter For Boiler 350> or Commercial: "900A" S/O For Cooking: SP & SD Hydro needed Low: 0 - 1/2 lb. WP Med: 1/2 - 3 lb. WP High: 3 - 15 lb. WP: See Chief or Inspector See Chief or Inspector Medical Gas System Certification of Inspections and Tests Certification test report

Medical

( PL )
Roughing Finishing Medical

10% program: Contractor must state he wants to participate at time of inspection request. (See 10% memo/guidelines) OP 98 can be used for all Inspections/tests above. (See OP98 & Instructions)

12/26/03