CONTRACTADMINISTRATIONSCHEMATIC(FIDICCLAUSES)

AUTHORITIES(1.13/ 8.5)
2.2EmployertoAssist

EMPLOYER(2)
EXCLUDESSuspension(8.812),Termination(15 &16),Forcemajeure(19),Disputes(20.2), Arbitration(20.6) 3.5Determinations 2.5Employer'sClaims

CONTRACTCOMPLIANCE 1.4Law 2.1RightofAccess 1.13Compliancewith 4.10SiteData Authorities 14.2AdvancePayment 6.7HealthAuthorities 14.7Interim&FinalPayment 7.8Royalties 14.9PaymentofRetention

1.9Delaystodwgs 2.4Evidenceoffinaces 3.2RedressofInstructions 4.2Performancesecurity 4.4;Subcontractorapproval 4.12UnforeseeablePhysicalConditions 8.3Programme(Initial)

8.4EOTClaims(UnderCl20) 8.5DelaysbyAuthorities 10.1ApplicationforTakingOver 13.2VEProposals 14.10StatementatCompletion 14.11Applicationforfinalpayment 20.1ClaimNotifications

ENGINEER(3)

COMMERCIAL/CONTRACTUAL/CHANGEMANAGEMENT 2.5Employer'sclaims 10.1/2takingoverCertificates 3.2 3 2Delegatedauthority 11 3ExtensionofDefectsPeriod 11.3 3.3Engineer'sInstructions 11.8Contractortosearch 3.5Engineer'sDeterminations 11.9PerformanceCertificate 6.9removalofContractor'sStaff 13.1/3Variations/RFP 8.1NoticetoCommence 14.13IssueFinalPaymentCertificate 8.6Ratesofprogress 20.1ReceiptofClaims 1.5Clarificationsindocuments(RFI) 3.2Delegatedauthority(Assistants) 3.3Issuedrawings 4.1Approvalsofmethodsforexecution. 7.5Rejection&7.6RemedialWork 8.6Ratesofprogress 12.1Measurement/13.6Dayworks 14.6InterimCertificates PROGRESS&CONTROL 1.5RFIambiguity/clarification/discrepency 4.21ProgressReports(+allrecords) 1.8TechnicalError/Defect 14.3InterimPaymentApplications 4.1Contractorsubmissions

3.2Delegation

INSURANCES(18)

CONTRACTOR(4) 4.3Contractor's Representative

ENGINEER'SDELEGATE (PMCPM)
3.2DelegatedAuthority

CONSTRUCTION SUPERVISION CONSULTANT


ScopetobeDetermined

DETAILED ENGINEERING CONSULTANT


DesignNoInvolvement aftercessationofdesign

COMMITM NTS COMMITMENTS 1.4Law&Language 1.8CareofDocuments (PublicationsonSite) 1.10Contractdocuments 4.2Performancesecurity 4.4Subcontractors 4.6Cooperationwith employer 4.10Sitedata(SiteVisit) 4.11SufficiencyofTender 4.15AccessRoute6Staff& Labour 6.8hazards 6.10Records 7.7P&EOwnership 8.2TimeforCompletion 14.4Scheduleofpayments 17 1 IndemnifyEmployer 17.1_Indemnify 17.2CareoftheWorks

ESTABLISHMENT STA ISHM NT 4.8Safety 4.13ROW&Facilities 4.14AvoidInterference 4.19Electricity&Water 4.17Contractor'sEquipment& Removal 4.22SiteSecurity 4.23SiteOperations 6.6Staff/LabourFacility& Employer'sFacility 6.11ConductofStaff&Labour 11.11SiteClearanceon Completion

(CONST)MANAG MANAGEMENT M NT 1.8Documents 4.7SurveyMethods(Confirm settingout) 4.8Safety 4.9QualityAssurance 4.16TransportofGoods 4.18Environmental 4.21Reports 6.7Health&Safety+ AccidentPreventionOfficer 6.8Hazards 6.10Records

METHODS M THO SBY YAR AREA A 4.1Contractor'sObligations, Details&Arrangements, ComplywithSpecified Procedures 4.7SettingOut 4.8/6.7Safety 4.9QA(QCI&TP)& ApprovalofMethods 6.8Contractor Superintendence&knowledge ofrisks 6.9Contractor'sPersonnel 6.10Recordstobeprovided (see4.23,climate,plant& labour) 7.1Methods 7.2Samples 7 3Inspection 7.3 7.4Testing 8.3Programme (+DESIGNMS/Tempoary Works)

CONTRACTOR'SSTAFF ASDELEGATED(Sub Agents/Site Engineers)

ENGINEER'S ASSISTANTS ResidentEngineers


SUPERVISION&CONTROL

ENGINEER'S ASSISTANTS ResidentEngineers

CONTRACTOR'SSTAFF ASDELEGATED( Foremen,Workersin Charge)

ENGINEER'S ASSISTANTS ARE/SiteInspectors

ENGINEER'S ASSISTANTS ARE/SiteInspectors

Drawings(GoodFor Construction) DesignReports&Calcs BOQ M&WSpecifications ParticularSpecifications GeotechnicalData&Report Topograhy Hydrology CADDStandard DesignCriteria/Functional Requiremenst(D&B)

DESIGN

TECHNICAL/CONTRACTUALCOMPLIANCEWITHCONTRACTDRAWINGS, DRAWINGS SPECIFICATIONS,HSQEREQUIREMENTS,MATERIALS&WORKMANSHIP,RECORDSOF WORKSANDPROGRESSFORPAYMENT

CONSTRUCTION/EXECUTION

CONTRACT SIGNED

WORKSCOMMENCE (ADVANCEPAYMENT)

INTERIM PAYMENTS

WORKS INSTALLED/BUILT

INTERIM PAYMENTS

TAKINGOVERCERT (50%RETENTION

STATEMENTAT COMPLETION

PERFORMANCECERTIFICATE (CERTIFYRETENTION)

RETURN BOND

FINAL STATE

FINALCERT &PAYMENT

CONTRACTLIFECYCLE, PAYMENT&CERTIFICATES

COMMENCEMENT (8.1)NOTICETOPROCEED

EXECUTIONSeeAbove) PHYSICALWORKS/PAYMENT/PROGRESSREPORTS

TESTING(9)

DEFECTSLIABILITY&NOTIFICATIONPERIOD(11.111.4)

COMPLETION(11.911.10)

CONTRACTCLOSED

CHANGECONTROL PAYMENT& PROGRESSMONITORING&CONTROL COMMENCEMENT CLAIMS&VARIATIONS &CONTRACTUALISSUES CONSTRUCTION TESTING TAKINGOVER DEFECTSLIABILITY FINALISATION EXECUTION