COOLING TOWER

PUNJAB STATE POWER CORPORATION LIMITED

Introduction
Cooling towers are commonly used to remove

excess heat that is generated & represent a relatively inexpensive and dependable means of removing low-grade heat from cooling water.
Cooling towers make use of evaporation whereby

some of the water is evaporated into a moving air stream and subsequently discharged into the atmosphere in the form of vapours.

Classification of Cooling water


Classification by build Classification based on heat transfer method Classification based on Air draft Classification based on Air flow pattern

but I will limit my talk to a Air draft (Natural Draft) Cooling Tower

Factors governing operation of Cooling water


The dry-bulb and wet-bulb temperatures of the air The temperature of warm water The area of contact between air and hot water The contact time between the air and the water The air pressure drop The desired temperature of the cooled water

Natural Draft Tower


The natural draft or hyperbolic cooling tower makes use of the difference in temperature between the ambient air and the hotter air inside the tower. As hot air moves upwards through the tower (because hot air rises), fresh cool air is driven into the tower through an air inlet provided at the bottom.

Components of Cooling Tower


Structural Components

1. 2. 3. 4. 5. 6. 7.

Cold water basin Tower Framework Water distribution System Fill Drift Eliminator Casing / Shell Structure Louvers

Materials of Components of Cooling Tower


Tower Material

1. 2. 3.

Frame & Casing Concrete & Steel Fill - PVC/Polyproplene Nozzles - PVC/Polyproplene

Tower Problems
Scale deposit Fouling due to presence of silt ,dirt ,sand etc. Microbiological growth due to presence of

microoganisms , Algae, fungi Corrosion of steel parts

Operation Considerations
Water make-up

To compensate the water loss due to : 1. Evaporation , 2. Drift (water entrained in discharge vapor), estimated to be About 0.2% of water supply 3. Blow down (water released to discard solids).

Cooling Tower parameters


Sr. No. 1. 2. 3. 4. 5 6 7 8
9

Design Parameter Total design capacity Height of top of tower above sill -do- at throat -do- at top Dry Bulb Temp. Design wet bulb Temp Cold Water outlet Temp Hot water Inlet Temp PVC Fill

CT- Stage I 33000cum / Hr. 120 m 36.93 m 42.67 m 35.1 28.5 32.5 42.5
Size 1600x600x300 in two layers; munters type C-10-19 double folded edge on one side and with black UV Stabilization , 0.25 mm thick and having a flute size of 19mm 2.8 m

CT Stage II 36500 m3/hr 104.625 m 49.856 51.856 35.05 28.25 33 41.1 1220x1830 of varying depths of 915mm,1120mm &1525 mm of Paharpur M67 make

10

Basin Depth

2.0-2.30 m

Cooling Water Analysis


Sr. No. 1 2 3 4 5 6 7 8 Design Parameter Ph Turbidity & Suspended solids Total dissolved solids Ca-hardness as CaCo3 M -alkanity as CaCo3 Chlorides as Cl Sulphates as SO4 Silica as Sio2 Design 7.5-8.00 100 ppm 200-500 ppm 140 ppm 140 ppm 40 ppm 140 ppm 4 ppm Actual 8.4 67 50-60 ppm 350-500 ppm 150-200 ppm 104-120 ppm 40-70 ppm 125 180 ppm 3.3 7.0 ppm

Improving Energy Efficiency of Cooling Towers


1. Clearances around cooling towers needs to be adequate to ensure uninterrupted air intake or exhaust. 2. Use right type of nozzles that do not clog & spray in a more uniform water pattern. Square spray nozzles are clog free as compared to spray type nozzles. 3. Increase contact surface and contact time between air and water may be with the use of PVC Film Type fills by replacing splash bars. 4. Clean distribution nozzles regularly. 5. Optimize the blow down flow rate, taking into account the cycles of concentration (COC)limit.

Improving Energy Efficiency of Cooling Towers


6. Keep the cooling water temperature to a minimum level by
(a) segregating high heat loads like furnaces, air compressors, DG sets and (b) isolating cooling towers from sensitive applications like A/C plants, condensers of captive power plant etc. 7. Monitor approach, effectiveness and cooling capacity to continuously optimize the cooling tower performance Seasonal variations be taken into consideration. 8. Monitor liquid to gas ratio and cooling water flow rates and amend these depending on the design values and seasonal variations. For example: increase water loads during summer and times when approach is high and increase air flow during monsoon times and when approach is low.

Improving Energy Efficiency of Cooling Towers


9. Increase COC improvement for water savings. The use of water treatment chemicals, pretreatment such as softening & pH adjustment , and other techniques can affect the acceptable range of cycles of concentration. 10. Check cooling water pumps regularly to maximize their efficiency.

Some Problems & its remedy for Cooling Towers


Drift/carry-over of water outside the unit 1. Uneven operation of spray nozzles 2 Blockage of the fills 3 Defective or displaced droplet eliminators 4 Excessive circulating water flow may be due to too high pumping head) Lack of cooling and 1 Water flow below the design value hence increase in 2 Irregular airflow or lack of air temperatures owing 3 Recycling of humid discharge air to increased 4 Intake of hot air from other sources temperature range 5 Blocked spray nozzles (or even blocked water pipes) 6 Scaling of joints 7 Scaling of the fill pack 1 Adjust & clean the nozzle 2 Eliminate any dirt on the top of the fill or with suitable chemical pretreatment 3 Replace or realign the eliminators 4 Adjust the water flow-rate by means of the regulating valves. Check damage to the fill 1 Regulated the flow by means of the valves 2 Ensure adequate clearance around cooling towers 3 Check the air descent velocity 4 Install deflectors 5 Clean the nozzles and/or the Tubes 6 Wash or replace the item 7 Clean or replace the material (washing with inhibited aqueous sulphuric acid is possible but long, complex and expensive)

Problems Encountered at GHTP


Concrete Shell

Patches of dampness on external surface of RCC shell. Minor cracks on staircase beams & columns. Holes & Patches in the inside of shell Water distribution Pipes Silt Deposit in the distribution pipes Exposure of Concrete surface of Supports Deposit of Scale / Corrosion of MS pipe surface PVC Fills Green algae found on fills Fills are almost choked with scale deposit mainly consisting of CaCo3 & sio2 & other organic matter. water at operating COC is scaling in nature. Pre chemical treatment / dozing be adopted to prevent organic growth. PVC Nozzles Chocking of nozzles due to the presence of silt, clay, sand & scale deposits. Nozzles are cleaned as a matter of routine in every shut down Presence of algae, fungi & bacteria are causing biological fouling in Nozzles Strainers & chemical treatment can be used to prevent biological fouling.