AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 02
Project:Water Pipe Line Work & Compressor Erection
S.No. Drg.No.
1
A1-08148-M-02-02
DESCRIPTION
Units
Mtrs
Mtrs
Nos
Nos
Nos
Nos
Nos
Nos
Kgs
Kgs
Nos
Nos
Material Qty
As per Drg As per Bill
134.82
140.450
134.82
152.450
6
6
2
2
6
6
6
6
8
8
32
32
749.142
749.142
749.142
749.142
10.5
10.5
1.75
1.75
9/2/2011
Diffrence Value in
Remarks
Value
Rs
5.630
264.61 Pipe length is taken more
17.630
828.61
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1093.22
DESCRIPTION
Units
As per Bill
09-2044-01-A-07
3
4
5
6
7
8
9
10
As per Drg
Excess
Qty
Rs/Rs/Kgs
201.600
201.600
0.000
Kgs
201.600
201.600
0.000
Kgs
31.149
31.149
0.000
Kgs
31.149
31.149
0.000
Kgs
8516
8516
0.000
Kgs
436
436
0.000
Kgs
158.5
158.5
0.000
Kgs
158.5
158.5
0.000
Total
Payable Amount is R
ION BILL
10/13/2011
Rate per
unit in
Rs/-
Billed
Amount in
Rs/-
Payable
Amount in
Rs/-
5670.55
5670.55
113162.04
113162.04
5.80
1169.28
1169.28
6.00
1209.6
1209.6
5.80
180.6642
180.6642
6.00
186.894
186.894
6.75
57483
57483
6.75
2943
2943
5.80
919.3
919.3
6.00
951
951
183875.33
183875.33
Remarks
S.No. Drg.No.
1
2
3
4
5
6
7
8
9
10
11
12
0.u50451-04/1/03
0.u50451-04/1/03
0.u50451-04/1/03
09-2044-01-A07
026508-00-1
026508-00-1
026508-00-1
026508-00-1
A1-08148-D3-02-01
1021837/1.0
1021837/1.0
1021837/1.0
DESCRIPTION
Excess
Units
As per Bill As per Drg Qty
Total
1.687
Rate per
unit in
Rs/-
0.061
0.061
0.00
0.00
6000
5800
0.131
0.131
0.665
0.00
0.00
0.00
5800
6000
7000
0.316
0.316
0.00
0.00
5800
6000
1.680
0.01
Billed
Payable
Excess
Amount in Amount in Amount
Rs/Rs/in Rs/24908.00
24068.00
840.00
363.4
363.4
0.00
351.2
351.2
0.00
8422.5
7942.5
480.00
25414.75
23674.75 1740.00
780.7
759.8
20.88
807.6
786.0
21.60
4655.0
4655.0
0.00
26849.00
22729.00 4120.00
75700.00
75700.00
0.00
1831.4
1831.4
0.00
1894.6
1894.6
0.00
Trusst Engineers
Trusst Engineers
5499
29-Nov-11
180
3300
Remarks
Excess Amount
because Bolts & Nuts
Erection Amount
23969
2880.00
2240
1240.00
360
200
2240
1128
216
320
2160
240
120
54
423
3158.4
1760
1504
1100
23962.4
0.u50451-04/1/03
900
120
220
15
30
18.8
Trusst Engineers
A1-08148D3-02-01
5640
180
3300
15
30
90
120
250
280
1350
660
660
144
30
60
15
120
250
30
240
120
1620
280
15
660
550
168.75
250
40
45
240
1890
1240.8
250
800
440
880
45
80
15 8091.52
30
1650
9200 15848.87
25048.87
140.87
Trusst Engineers
360
200
2520
640
1128
216
320
2160
240
120
54
423
3384
1760
1504
1100
25249
Payable
Amount in
Rs/-
Excess
Amount in
Rs/-
Units
Mtrs
155.500 74.100
81.400
45
6754.50
3334.50
3420.00
Compressor to
MS Elbows
Preheater Airline Sockets
Unoins
0.050451-0411
Compressor
Nos
Nos
Nos
Mtrs
Nos
Nos
Nos
MT
16
16
2
2
6
6
678.400 678.400
16
16
6
6
2
2
0.750
0.375
0.000
0.000
0.000
0.000
0
0
0
0.375
110
45
45
47
110
47
47
7000
1760.00
94.00
282.00
31884.80
7040.00
282.00
94.00
5250.00
1760.00
90.00
270.00
31884.80
1760.00
282.00
94.00
2625.00
0.00
4.00
12.00
0.00
5280.00
0.00
0.00
2625.00
0.050451-0411
Drier
MT
0.530
0.265
0.265
7000
3710.00
1855.00
1855.00
026508-00-1
MT
0.950
0.475
0.475
7000
6650.00
6650.00
0.00
Mtrs
144.000 144.000
0.000
45
6480.00
6480.00
0.00
10216727
Water Pump
Pre Heater Water
Line 1" Pipe
Pre Heater Water
Line 1" Socket
Nos
22.000 22.000
0.000
45
1034.00
990.00
44.00
71315.30 58075.30
13240.00
S.No. Drg.No.
DESCRIPTION
Water Spraying
Gear Box MS
6/M/6217824 for Pipeline 1" Size
Raw Mill
MS Elbows 1"
Sockets 1"
Unoins 1"
4" Pipe
2
Total
As per Excess
compld
Qty
Rate per
unit in
Rs/-
As per
Bill
Trusst Engineers
6-Jan-12
Remarks
Excess wt
Excess wt
Excess wt
Calculation
Mistake on MS
Elbows
50% Hold as its wt
is not confirmed
so far
Excess wt
Trusst Engineers
TRUSST ENGINEERS
Mtrs
Nos
Nos
Nos
80.800
6
5
1
As per
compltd
80.800
6
5
1
MT
0.051
0.051
0.000
5800
293.19
293.19
MT
0.051
0.051
0.000
6000
303.30
303.30
Mtrs
Nos
Nos
Nos
Nos
52.000
6
4
2
1
52.000
6
4
2
1
0.000
0.000
0.000
0.000
0.000
188
47
440
40
40
9776.00
282.00
1760.00
80.00
40.00
9776.00
282.00
1760.00
80.00
40.00
0
0
0
0
0
MT
0.018
0.018
0.000
5800
104.40
104.40
MT
0.018
0.018
0.000
6000
108.00
108.00
Mtrs
Mtrs
Nos
Nos
Nos
30.000
34
6
1
1
30.000
34
6
1
1
0.000
0.000
0.000
0.000
0.000
117.5
94
30
30
30
3525.00
3196.00
180.00
30.00
30.00
3525.00
3196.00
180.00
30.00
30.00
0
0
0
0
0
4
8
16
4
8
16
0.000
0.000
0.000
960.00
240.00
480.00
960.00
240.00
480.00
0
0
0
Nos
Nos
Nos
Excess
Rate per
Billed
Payable
Excess
Qty
unit in Rs/- Amount in Amount in Amount
0.000
188 15190.00 15190.40
-0.40
0.000
30
180.00
180.00
0
0.000
110
550.00
550.00
0
0.000
140
140.00
140.00
0
Pipeline work from Water treatment plant to Water pit of Mines side
MS Pipe 10" Erection
Mtrs
66.000
Flange 10" Erection
Nos
5
Bend 10" Erection
Nos
1
Nipple 10" Erection
Nos
2
Gasket Kit 10" Erection
Nos
5
Elbow
Nos
4
9
Support Structure Fabrication for 10" Pipeline
MT
0.589
work
Support Structure Erection for 10" Pipeline work MT
RA 5 Hold Amount
RA 5 Elbow 4" Amount Variation on rate
Total
0.589
As per
compltd
Excess
Qty
Rate per
Billed
Payable
Excess
unit in Rs/- Amount in Amount in Amount
66.000
5
1
2
5
4
0.000
0.000
0.000
0.000
0.000
0.000
470
90
110
30
90
110
31020.00
900.00
110.00
60.00
450.00
440.00
31020.00
450.00
110.00
60.00
450.00
440.00
0
450.00
0
0
0
0
0.589
0.000
5800
3416.08
3416.08
0.589
0.000
6000
3533.87
3533.87
4480.00
5280.00
5280.00
4480.00
0
TRUSST ENGINEERS
19-Jan-12
Remarks
TRUSST ENGINEERS
19-Jan-12
Remarks
Hold
TRUSST ENGINEERS