Sie sind auf Seite 1von 14

FABRICATION BILL

AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 02
Project:Water Pipe Line Work & Compressor Erection
S.No. Drg.No.
1

A1-08148-M-02-02

DESCRIPTION

Water Pipe Line of 14"


Water Pipe Line of 10"
Total Bends Fab.-10"
Total Bends Fab.-14"
Total Bends Erection - 10"
Total Bends Erection - 14"
Insert Plates 12mm
Anchor Fashtner Bolts
Total Support Fabrication
Total Support Erection
A1-08148-D3-02-01 Compressor Erection
Drier Erction
Total

Units
Mtrs
Mtrs
Nos
Nos
Nos
Nos
Nos
Nos
Kgs
Kgs
Nos
Nos

Material Qty
As per Drg As per Bill
134.82
140.450
134.82
152.450
6
6
2
2
6
6
6
6
8
8
32
32
749.142
749.142
749.142
749.142
10.5
10.5
1.75
1.75

9/2/2011

Diffrence Value in
Remarks
Value
Rs
5.630
264.61 Pipe length is taken more
17.630
828.61
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1093.22

Rate per unit


Total Value
Rs
47.00
88711.56
47.00
63365.40
100.00
6000.00
100.00
2800.00
110.00
6600.00
110.00
9240.00
275.00
2200.00
80.00
2560.00
5800.00
4345.02
6000.00
4494.85
7000.00
73500.00
7000.00
12250.00
26669.00 276066.836

FABRICATION & ERECTION BILL


AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 03
Material Qty
S.No. Drg.No.

DESCRIPTION

Units
As per Bill

HAG Pipe Line with Fittings


Erection

09-2044-01-A-07

A1-08148-M-02-02 Water Pipe Line erection


Pipeline Support Bracket
22038427
Fabrication
Pipeline Support Bracket
22038427
Erection
Hag Pipe Line support
09-2044-01-A-07
structure Fabrication
Hag Pipe Line support
09-2044-01-A-08
structure Erection
Raw Mill Air Receiver Tank
22038446
(5000 ltrs) Erection
RMH Air Receiver Tank (436
22038427
ltrs) Erection
Water Pipe Line Support
A1-08148-M-02-02
structure Fabrication
Water Pipe Line Support
A1-08148-M-02-02
structure Erection

3
4
5
6
7
8
9
10

As per Drg

Excess
Qty

Rs/Rs/Kgs

201.600

201.600

0.000

Kgs

201.600

201.600

0.000

Kgs

31.149

31.149

0.000

Kgs

31.149

31.149

0.000

Kgs

8516

8516

0.000

Kgs

436

436

0.000

Kgs

158.5

158.5

0.000

Kgs

158.5

158.5

0.000

Total

Payable Amount is R

ION BILL
10/13/2011
Rate per
unit in
Rs/-

Billed
Amount in
Rs/-

Payable
Amount in
Rs/-

5670.55

5670.55

113162.04

113162.04

5.80

1169.28

1169.28

6.00

1209.6

1209.6

5.80

180.6642

180.6642

6.00

186.894

186.894

6.75

57483

57483

6.75

2943

2943

5.80

919.3

919.3

6.00

951

951

183875.33

183875.33

Payable Amount is Rs/- 183875.00

Remarks

FABRICATION & ERECTION BILL


AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 04
Material Qty in MT

S.No. Drg.No.
1
2
3
4
5
6
7
8
9
10
11
12

0.u50451-04/1/03
0.u50451-04/1/03
0.u50451-04/1/03
09-2044-01-A07
026508-00-1
026508-00-1
026508-00-1
026508-00-1
A1-08148-D3-02-01
1021837/1.0
1021837/1.0
1021837/1.0

DESCRIPTION

Excess
Units
As per Bill As per Drg Qty

RMH Air Pipelining


Support Erection
MT
0.061
Support Fabrication
MT
0.061
HAG Air Piping
Spring System Waterline for Raw Mill
Support Fabrication
MT
0.135
Support Erection
MT
0.135
Water Tank
MT
0.665
Compressor pipe Line
Preheater Waterline
Support Fabrication
MT
0.316
Support Erection
MT
0.316

Total

1.687

Rate per
unit in
Rs/-

0.061
0.061

0.00
0.00

6000
5800

0.131
0.131
0.665

0.00
0.00
0.00

5800
6000
7000

0.316
0.316

0.00
0.00

5800
6000

1.680

0.01

Billed
Payable
Excess
Amount in Amount in Amount
Rs/Rs/in Rs/24908.00
24068.00
840.00
363.4
363.4
0.00
351.2
351.2
0.00
8422.5
7942.5
480.00
25414.75
23674.75 1740.00
780.7
759.8
20.88
807.6
786.0
21.60
4655.0
4655.0
0.00
26849.00
22729.00 4120.00
75700.00
75700.00
0.00
1831.4
1831.4
0.00
1894.6
1894.6
0.00

171978.11 164755.63 7222.48

As per Mech.Depot.Recommended Bill Amount in Rs/- 171978.11


As per Trusst Engineers Recommended Amount Rs/- 164755.63

Trusst Engineers

Trusst Engineers

5499

29-Nov-11

180
3300

Remarks

Excess Amount
because Bolts & Nuts
Erection Amount
23969

2880.00

2240

1240.00

360
200
2240
1128
216
320
2160
240
120
54
423
3158.4
1760

1504
1100
23962.4

0.u50451-04/1/03
900
120
220
15
30
18.8
Trusst Engineers

A1-08148D3-02-01
5640
180
3300

15
30
90
120
250
280
1350
660
660
144
30
60
15
120
250
30
240
120
1620
280
15
660
550
168.75
250
40
45
240
1890
1240.8
250
800
440
880
45
80
15 8091.52
30
1650
9200 15848.87
25048.87
140.87

Trusst Engineers

360
200
2520
640
1128
216
320
2160
240
120
54
423
3384
1760
1504
1100
25249

FABRICATION & ERECTION BILL


AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 05
Billed
Amount in
Rs/-

Payable
Amount in
Rs/-

Excess
Amount in
Rs/-

Units

Mtrs

155.500 74.100

81.400

45

6754.50

3334.50

3420.00

Compressor to
MS Elbows
Preheater Airline Sockets
Unoins
0.050451-0411
Compressor

Nos
Nos
Nos
Mtrs
Nos
Nos
Nos
MT

16
16
2
2
6
6
678.400 678.400
16
16
6
6
2
2
0.750
0.375

0.000
0.000
0.000
0.000
0
0
0
0.375

110
45
45
47
110
47
47
7000

1760.00
94.00
282.00
31884.80
7040.00
282.00
94.00
5250.00

1760.00
90.00
270.00
31884.80
1760.00
282.00
94.00
2625.00

0.00
4.00
12.00
0.00
5280.00
0.00
0.00
2625.00

0.050451-0411

Drier

MT

0.530

0.265

0.265

7000

3710.00

1855.00

1855.00

026508-00-1

MT

0.950

0.475

0.475

7000

6650.00

6650.00

0.00

Mtrs

144.000 144.000

0.000

45

6480.00

6480.00

0.00

10216727

Water Pump
Pre Heater Water
Line 1" Pipe
Pre Heater Water
Line 1" Socket

Nos

22.000 22.000

0.000

45

1034.00

990.00

44.00

71315.30 58075.30

13240.00

S.No. Drg.No.

DESCRIPTION

Water Spraying
Gear Box MS
6/M/6217824 for Pipeline 1" Size
Raw Mill
MS Elbows 1"
Sockets 1"
Unoins 1"

4" Pipe
2

Total

As per Excess
compld
Qty

Rate per
unit in
Rs/-

As per
Bill

As per Mech.Dept.Recommended Bill Amount in Rs/- 71315.30


As per Trusst Engineers Recommended Amount Rs/-58075.00

Trusst Engineers

6-Jan-12
Remarks

Excess wt

Excess wt
Excess wt
Calculation
Mistake on MS
Elbows
50% Hold as its wt
is not confirmed
so far

Excess wt

Trusst Engineers

FABRICATION & ERECTION BILL


AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 06
S.No. DESCRIPTION
MS PIPE 4" Pre Heater to Coal Mill
Socket 4" Erection
1
Elbow 4" Erection
Reducer 4" Erection
Support Structure Fabrication for 4" pipe line for
2
Pre Heater to Coal Mill
Support Structure Erection for 4" pipe line for
3
Pre Heater to Coal Mill
4" G.I. Pipe Line Erection for BagHouse
Socket 4"Erection
4
Elbow 4" Erection
Flange 4" Erection
Valve 4" Erection
Support Structure Fabrication for 4" pipe line for
5
BagHouse
Support Structure Erection for 4" pipe line for
6
BagHouse
2 1/2" G.I. Pipe Line Erection for Pre Heater
2" pipe line for PreHeater to Coal Mill
7
Socket 4" Erection
Elbow 4" Erection
Reducer 4" Erection
Accessories for Air compressor House
2" Tee Erection
8
2" Valve Erection
2" Nipple Erection

TRUSST ENGINEERS

Mtrs
Nos
Nos
Nos

80.800
6
5
1

As per
compltd
80.800
6
5
1

MT

0.051

0.051

0.000

5800

293.19

293.19

MT

0.051

0.051

0.000

6000

303.30

303.30

Mtrs
Nos
Nos
Nos
Nos

52.000
6
4
2
1

52.000
6
4
2
1

0.000
0.000
0.000
0.000
0.000

188
47
440
40
40

9776.00
282.00
1760.00
80.00
40.00

9776.00
282.00
1760.00
80.00
40.00

0
0
0
0
0

MT

0.018

0.018

0.000

5800

104.40

104.40

MT

0.018

0.018

0.000

6000

108.00

108.00

Mtrs
Mtrs
Nos
Nos
Nos

30.000
34
6
1
1

30.000
34
6
1
1

0.000
0.000
0.000
0.000
0.000

117.5
94
30
30
30

3525.00
3196.00
180.00
30.00
30.00

3525.00
3196.00
180.00
30.00
30.00

0
0
0
0
0

4
8
16

4
8
16

0.000
0.000
0.000

960.00
240.00
480.00

960.00
240.00
480.00

0
0
0

Units As per Bill

Nos
Nos
Nos

Excess
Rate per
Billed
Payable
Excess
Qty
unit in Rs/- Amount in Amount in Amount
0.000
188 15190.00 15190.40
-0.40
0.000
30
180.00
180.00
0
0.000
110
550.00
550.00
0
0.000
140
140.00
140.00
0

FABRICATION & ERECTION BILL


AGENCY:CHANDESWAR CONSTRUCTION
BILL No:RA 06
S.No. DESCRIPTION

Units As per Bill

Pipeline work from Water treatment plant to Water pit of Mines side
MS Pipe 10" Erection
Mtrs
66.000
Flange 10" Erection
Nos
5
Bend 10" Erection
Nos
1
Nipple 10" Erection
Nos
2
Gasket Kit 10" Erection
Nos
5
Elbow
Nos
4
9
Support Structure Fabrication for 10" Pipeline
MT
0.589
work
Support Structure Erection for 10" Pipeline work MT
RA 5 Hold Amount
RA 5 Elbow 4" Amount Variation on rate

Total

0.589

As per
compltd

Excess
Qty

Rate per
Billed
Payable
Excess
unit in Rs/- Amount in Amount in Amount

66.000
5
1
2
5
4

0.000
0.000
0.000
0.000
0.000
0.000

470
90
110
30
90
110

31020.00
900.00
110.00
60.00
450.00
440.00

31020.00
450.00
110.00
60.00
450.00
440.00

0
450.00
0
0
0
0

0.589

0.000

5800

3416.08

3416.08

0.589

0.000

6000

3533.87

3533.87

4480.00
5280.00

5280.00

4480.00
0

87136.00 82208.24 4927.76

As per Mech.Dept.Recommended Bill Amount in Rs/- 87136.00


As per Trusst Engineers Recommended Amount Rs/- 82208.24

TRUSST ENGINEERS

19-Jan-12
Remarks

TRUSST ENGINEERS

19-Jan-12
Remarks

Hold

TRUSST ENGINEERS

Das könnte Ihnen auch gefallen