Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

PROJECT: OZONE GALLERIA MALL @ RANCHI BILL OF QUANTITIES FOR HVAC LOW SIDE WORKS Sl No Description DATE : 06.09.2013 Unit Qty Revision-R0 Rate Amount

Note: The contractor should read the specifications thoroughly and quote the price for each item. The BOQ should read in conjuction with specification, drawing & equipment schedule. NOTE : Quoted price shall be inclusive of Supply, sea freight, insurance, packing and forwarding charges etc., as applicable COOLING TOWER 1.00 Supply, Installation, testing and commissioning of CTI approved MULTI CELL INDUCED DRAFT CROSS FLOW COOLING TOWERS for airconditioning system. Each tower shall be complete with basin, casing, distribution system, filling, louvers, ladder, fan, Motor and other complete accessories as described in the technical specifications. Motor shall be suitable for 41510% volts, 50 cycles and 3 phase power supply. Tower shall be designed with high efficiency drift eliminators to meet current environmental standards and guidelines for microbial control. Each tower cell must be installed with individual cold water basins and water discharge sumps to facilitate maintenance without causing disruption to the other cells in operation. Tower for airconditioning system shall be selected on the basis of following parameters Refer Equipment schedule & Technical Specification for details Make : Marley /BAC / Advance Cooling Tower 825 USGPM Ambient WB Temperature : 82F Cooling capacity : 275TR Leaving water leaving temperature : 87 F Entering water entering temperature : 97 F TOTAL VALUE FOR COOLING TOWER CENTRIFUGAL PUMPS

Nos

I II

PRIMARY CHILLED WATER PUMPS 1.00 Supply, installation, testing & commissioning of Centrifugal monobloc type pumpset motor shall be suitable for 415 + 10% volts, 50 cycles/second, 3-phase power supply. The quoted price shall include cost of thermal insulation and cladding . The unit complete should be suitable for outdoor installation at the roof of the building. Refer Equipment schedule & Technical Specification for details Make : ITT BELL & GOSSETT, GRUNDFOS, Armstrong 1.10 Primary Chilled Water pumps 660 USGPM Head in Ft - 40 SECONDARY CHILLED WATER PUMPS 2.00 Supply, installation, testing & commissioning of End Suction Back pull out Centrifugal chilled water pumpsets suitable for VFD. Factory mounted on a common base with electric motor for recirculation of water for the central air conditioning system. All pumps shall be aligned properly as required and complete with mechanical seal. The pump motor shall be suitable for 415 + 10% volts, 50 cycles/second, 3-phase power supply. The quoted price shall include cost of thermal insulation and cladding . The unit complete should be suitable for outdoor installation at the roof of the building. Refer Equipment schedule & Technical Specification for details Make : ITT BELL & GOSSETT, GRUNDFOS, Armstrong 2.10 Secondary Chilled Water pumps

Nos

Nos

Architects: BENTEL ASSOCIATES

Page 1 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 660 USGPM - 17 KW Head in Ft - 90

Description

Unit

Qty

Rate

Amount

2.11 Supply, installation, testing & commissioning of VFD, VFD controller, microprocessor panel necessary cabling, two sets of sensors, required enclosure, with By Pass control, including cabling and cable Termination etc. CONDENSER CHILLED WATER PUMPS 3.00 Supply, installation, testing & commissioning of End Suction Back pull out type pumpset motor shall be suitable for 415 + 10% volts, 50 cycles/second, 3-phase power supply. The quoted price shall include cost of thermal insulation and cladding . The unit complete should be suitable for outdoor installation at the roof of the building. Refer Equipment schedule & Technical Specification for details Make : ITT BELL & GOSSETT, GRUNDFOS, Armstrong 3.10 Condenser Chilled Water pumps 825 USGPM Head in Ft - 40 II III TOTAL VALUE FOR CENTRIFUGAL PUMPS AIR HANDLING UNITS

lot

Nos

1.00 Supply, installation, testing & commissioning of Double skin construction draw thru type Horizontal Floor mounted / CEILING SUSPENDED AIR HANDLING UNITS with 25 mm thick Sandwitched PUF insulation as per specification & as indicated in the Equipment Schedule. Each complete with DIDW FORWARD Curved Centrifugal Fan, Pre filter of 10 micron, 6 row deep water coil of copper tube & aluminium fins construction with blue Hydraufillic coating for chilled water coil, coil size shall be selected for a maximum face velocity of 500 feet/minute. and squirrel cage induction motor, centrifugal fan belt drive and vibration isolators, Limit switches,Emergency Light , Guard for inspection door. Motor shall be suitable for 41510% volts, 50 cycles/second, 3 phase AC supply and also suitable for VFD operation. Note: AHU shall be supplied with one set of pre commissioning filters. Refer Equipment schedule & Technicla Specification for details

1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26

Make : Caryaire / VTS / Zeco / Edgetech LGF-AHU-01 - 35 TR/ LGF-AHU-02 - 30 TR LGF-CSU-01 - 30 TR LGF-CSU-02 - 30 TR LGF-CSU-03 - 30 TR LGF-CSU-04 - 30 TR LGF-CSU-05 - 30 TR LGF-CSU-06 - 30 TR LGF-CSU-07 - 10 TR LGF-CSU-08 - 30 TR GF-AHU-01 - 30 TR GF-AHU-02 - 28 TR GF-CSU-01 - 17 TR GF-CSU-02 - 4.0 TR GF-CSU-03 - 3.0 TR GF-CSU-04 - 5.0 TR GF-CSU-05 - 5.0 TR GF-CSU-06 - 5.0 TR GF-CSU-07 - 5.0 TR GF-CSU-08 - 25 TR GF-CSU-09 - 11 TR GF-CSU-10 - 5.0 TR GF-CSU-11 - 4.0 TR GF-CSU-12 - 4.0 TR GF-CSU-13 - 5.0 TR GF-CSU-14 - 4.0 TR

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Architects: BENTEL ASSOCIATES

Page 2 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64 1.65 1.66 1.67 1.68 1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.76 1.77 1.78 1.79 1.80 1.81 1.82 1.83 1.84 1.85 1.86 1.87 1.88 1.89

Description GF-CSU-15 - 5.0 TR GF-CSU-16 - 25 TR 1F-AHU-01 - 27 TR 1F-AHU-02 - 27 TR 1F-CSU-01 - 16 TR 1F-CSU-02 - 2.0 TR 1F-CSU-03 - 3.0 TR 1F-CSU-04 - 3.0 TR 1F-CSU-05 - 5.0 TR 1F-CSU-06 - 4.0 TR 1F-CSU-07 - 4.0 TR 1F-CSU-08 - 5.0 TR 1F-CSU-09 - 21 TR 1F-CSU-10 - 4.0TR 1F-CSU-11 - 4.0TR 1F-CSU-12 - 4.0TR 1F-CSU-13 - 4.0TR 1F-CSU-14 - 12TR 1F-CSU-15 - 4.0TR 1F-CSU-16 - 4.0TR 1F-CSU-17 - 5.0TR 1F-CSU-18 - 3.0TR 1F-CSU-19 - 3.0TR 1F-CSU-20 - 3.0TR 1F-CSU-21 - 3.0TR 1F-CSU-22 - 21TR 2F-AHU-01 - 28 TR 2F-AHU-02 - 27 TR 2F-CSU-01 - 16TR 2F-CSU-02 - 2.0TR 2F-CSU-03 - 2.0TR 2F-CSU-04 - 3.0TR 2F-CSU-05 - 3.0TR 2F-CSU-06 - 4.0TR 2F-CSU-07 - 4.0TR 2F-CSU-08 - 4.0TR 2F-CSU-09 - 4.0TR 2F-CSU-10 - 22TR 2F-CSU-11 - 4.0TR 2F-CSU-12 - 2.0TR 2F-CSU-13 - 3.0TR 2F-CSU-14 - 12TR 2F-CSU-15 - 4.0TR 2F-CSU-16 - 4.0TR 2F-CSU-17 - 5.0TR 2F-CSU-18 - 3.0TR 2F-CSU-19 - 3.0TR 2F-CSU-20 - 3.0TR 2F-CSU-21 - 3.0TR 2F-CSU-22 - 22TR 3F-AHU-01 - 26 TR 3F-AHU-02 - 22 TR 3F-CSU-01- 3.0TR 3F-CSU-02- 3.0TR 3F-CSU-03- 4.0TR 3F-CSU-04- 2.0TR 3F-CSU-05- 2.0TR 3F-CSU-06- 2.0TR 3F-CSU-07- 2.0TR 3F-CSU-08- 2.0TR 3F-CSU-09- 4.0TR 3F-CSU-10- 5.0TR 3F-CSU-11- 33TR

Unit Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Rate

Amount

Architects: BENTEL ASSOCIATES

Page 3 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 1.90 1.91 1.92 1.93 1.94 1.95 1.96 1.97 1.98 1.99 2.00 2.01 2.02 2.03 2.04 2.05 2.06 III IV

Description 3F-CSU-12- 4.0TR 3F-CSU-13- 4.0TR 3F-CSU-14- 4.0TR 3F-CSU-15- 4.0TR 3F-CSU-16- 8.0TR 3F-CSU-17- 17TR 3F-CSU-18- 3.0TR 4F-AHU-01 - 18 TR 4F-AHU-02 - 18 TR 4F-CSU-01- 22TR 4F-CSU-02- 20TR 4F-CSU-03- 9.0TR 4F-CSU-04- 20TR 5F-AHU-01 - 17 TR 5F-AHU-02 - 24 TR 5F-AHU-03 - 16 TR 5F-AHU-04 - 20 TR TOTAL VALUE FOR AIR HANDLING UNITS CENTRIFUGAL FANS FOR VENTILATION PRESSURIZATION FANS Supply, Installation, Testing and Commissioning of cabinet type Double Skin construction draw thru type , Floor Mounted type Fresh Air Handling Units with 50 mm thick , Intake Plenum, suitable for Outdoor installation of below mentioned capacities( Fan & Filter section only ) as per specification and as indicated in the drawing. Each complete TEFC squirrel cage induction motor, Each complete with DIDW forward Curved aerofoil blade Centrifugal Fan, belt drive and vibration isolators, Limit switches, Emergency Light, Motor shall be suitable for and 415 +/- 10% Volts, 50Hz, 3 phase AC supply and Motor shall be suitable for 41510% volts, 50 cycles/second, 3 phase AC supply and also suitable for VFD operation. The unit shall be suitable for outdoor installation. Make : Kruger / Nicotra LIFT WELL PRESSURIZATION TE-LWP -01,02,03 & 04 5000 CFM TSP - 75MM WG STAIRCASE PRESSURIZATION. TE-SP-01 & 02 12000 CFM TSP - 75MM WG PUMP ROOM FRESH AIR UNIT ( CEILING SUPSENDED TYPE) LB-FAU-01 2000 CFM TSP - 75MM WG

Unit Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Rate

Amount

a b

Nos

e f

Nos

Nos

Architects: BENTEL ASSOCIATES

Page 4 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No

Description SEWAGE TREATMENT PLANT VENTILATION FAN Supply, Installation, Testing and Commissioning of cabinet type Double Skin construction draw thru type , Floor Mounted type Exhaust Units with 50 mm thick , Intake Plenum, suitable for Outdoor installation of below mentioned capacities( Fan & Filter section only ) as per specification and as indicated in the drawing. Each complete TEFC squirrel cage induction motor, Each complete with DIDW forward Curved aerofoil blade Centrifugal Fan, belt drive and vibration isolators, Limit switches, Emergency Light, Motor shall be suitable for and 415 +/- 10% Volts, 50Hz, 3 phase AC supply and Motor shall be suitable for 41510% volts, 50 cycles/second, 3 phase AC supply and also suitable for VFD operation. The unit shall be suitable for outdoor installation.

Unit

Qty

Rate

Amount

TF - EAU - 01 8000 CFM TSP - 65MM WG PUMP ROOM VENTILATION FAN Supply, Installation, Testing and Commissioning of cabinet type Double Skin construction draw thru type , Suspeneded type Exhaust Units with 50 mm thick , Intake Plenum, suitable for Outdoor installation of below mentioned capacities( Fan & Filter section only ) as per specification and as indicated in the drawing. Each complete TEFC squirrel cage induction motor, Each complete with DIDW forward Curved aerofoil blade Centrifugal Fan, belt drive and vibration isolators, Limit switches, Emergency Light, Motor shall be suitable for and 415 +/- 10% Volts, 50Hz, 3 phase AC supply and Motor shall be suitable for 41510% volts, 50 cycles/second, 3 phase AC supply and also suitable for VFD operation. The unit shall be suitable for outdoor installation.

Nos

LB - EAU - 01 2000 CFM TSP - 75MM WG IV V TOTAL VALUE FOR CENTRIFUGAL FANS PIPING WORKS

Nos

PIPING 1.00 Supply, installation, testing & commissioning of MS class C pipes for chilled water cut to required lengths and installed with all welded joints, providing and fixing in position with the necessary fittings like elbows, tees and reducers, sockets for probe meter: Supports, Support hangers with vibration isolation arrangement as per specification, drawings / details. Make : Jindal /Tata 1.01 350 mm dia 0.01 300 mm dia 0.02 250 mm dia 0.03 200 mm dia 0.04 150 mm dia 0.05 125 mm dia 0.06 100 mm dia 0.07 80 mm dia 0.08 65 mm dia 0.09 50 mm dia 0.10 40 mm dia 0.11 32 mm dia 0.12 25 mm dia BUTTERFLY VALVES 2.00 Supply, Installation, testing &commissioning of Butterfly valves with PN 10 rating with matching flanges. The valves should have feasiblity of changing the inner lining if wornout and the handles should have lockable facility. (For details refer Technical specfication). Make : Audco /Advance /Shakthi 350 mm dia 300 mm dia 250 mm dia 200 mm dia

Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt

100 300 100 30 30 25 600 600 780 100 100 450

2.01 2.01 2.02 2.03

Nos Nos Nos Nos

R.O R.O 4 38

Architects: BENTEL ASSOCIATES

Page 5 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12

Description 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia

Unit Nos Nos Nos Nos Nos Nos Nos Nos Nos

Qty R.O R.O 2 90 11 124 R.O R.O R.O

Rate

Amount

BALL VALVES 3.00 Supply, installation, testing & commissioning of Ball valve with PN 10 rating and matching flanges (For details refer Technical specfication). Make : Audco /Advance /Shakthi 3.01 40 mm dia 3.02 32 mm dia 3.03 25 mm dia BALL VALVES WITH STRAINER 4.00 Supply, installation, testing & commissioning of Ball valve with stainer with PN 10 rating and matching flanges (For details refer Technical specfication). Make : Audco /Advance /Shakthi 4.01 40 mm dia 4.02 32 mm dia 4.03 25 mm dia GATE VALVE 5.00 Supply, installation, testing & commissioning of Gate Valves with matching flanges with PN 10 rating (For details refer Technical specfication). Make : Audco /Advance /Shakthi 5.01 50 mm dia 5.02 32 mm dia 5.03 25 mm dia AUTOMATIC BALANCING VALVE 6.00 Supply, installation, testing & commissioning of Automatic Balancing Valve with matching flanges with PN 10 rating (For details refer Technical specfication). Make : TA/ Flowcon / frese /Danfoss 6.01 250 mm dia 6.02 200 mm dia 6.03 150 mm dia 6.04 125 mm dia 6.05 100 mm dia 6.06 80 mm dia 6.07 65 mm dia 6.08 50 mm dia 6.09 40 mm dia 6.10 32 mm dia 6.11 25 mm dia

Nos Nos Nos

25 25 305

Nos Nos Nos

R.O R.O R.O

Nos Nos Nos

R.O R.O R.O

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

2 8 R.O R.O R.O 10 1 24 5 5 61

Architects: BENTEL ASSOCIATES

Page 6 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 7.00

7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11

Description 2 - WAY VALVE Supply, installation, testing & commissioning of 2-way balancing Valve with matching flanges with PN 10 rating (For details refer Technical specfication). The valve should be above provide position feed back status. Make : TA/ Flowcon / frese /Danfoss 250 mm dia 200 mm dia 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia

Unit

Qty

Rate

Amount

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

R.O R.O R.O R.O R.O 10 1 24 5 5 61

PUMP SUCTION GUIDE 8.00 Supply, installation, testing & commissioning of Pump suction guide with stainer & matching flanges with PN 10 rating (For details Technical specfication). Make : Sant / Emerald 8.01 200 mm dia 8.02 150 mm dia Y - STRAINER 9.00 Supply, installation, testing & commissioning of Y Strainers with matching flanges with PN 10 rating (For details refer Technical specfication) . Make : Sant / Emerald 9.01 200 mm dia 9.02 150 mm dia 9.03 125 mm dia 9.04 100 mm dia 9.05 80 mm dia 9.06 65 mm dia 9.07 50 mm dia 9.08 40 mm dia 9.09 32 mm dia 9.10 25 mm dia DUAL PLATE CHECK VALVE 10.00 Supply, installation, testing & commissioning of Dual Plate Check Valve with matching flanges with PN 10 rating (For details refer Technical specfication). Make : Audco /Advance /Shakthi 10.01 250 mm dia 10.02 200 mm dia 10.03 150 mm dia 10.04 125 mm dia 10.05 100 mm dia MOTORISED ON/OFF VALVE 11.00 Supply, installation, testing & commissioning of Motorised on/off valve with PN 10 rating (For details refer Technical specfication). Make : Audco /Advance /Shakthi 11.01 300 mm dia 11.02 200 mm dia 11.03 150 mm dia 11.04 125 mm dia 11.05 100 mm dia 11.06 80 mm dia 11.07 65 mm dia 11.08 50 mm dia 11.09 40 mm dia 11.10 32 mm dia 11.11 25 mm dia Nos Nos 11 R.O

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

R.O R.O R.O R.O 10 1 24 5 5 61

Nos Nos Nos Nos Nos

R.O 3 8 R.O R.O

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

R.O 8 R.O R.O R.O R.O R.O R.O R.O R.O R.O

Architects: BENTEL ASSOCIATES

Page 7 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No

Description

Unit

Qty

Rate

Amount

DIAL TYPE THERMOMETER 12.00 Supply, installation, testing & commissioning of Dial type thermometer (For details refer Technical specfication). Make : H GURU / Warry PRESSURE GAUGE 13.00 Supply, installation, testing & commissioning of Pressure gauge (For details refer Technical specfication). Make : H GURU / Warry FLEXIBLE CONNECTIONS 14.00 Supply, installation, testing & commissioning of Flexible connections of suitable pressure rating to be installed at CHILLERS, AHU's & Pumpsets inlets & outlets and at pipes crossing building expansion joints with suitable Flanges (For details refer Technical specfication). Make : UP Twiga / Arma Flex 200 mm dia 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia

Nos

212

Nos

250

14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

38 R.O R.O R.O 20 2 56 10 10 122

Architects: BENTEL ASSOCIATES

Page 8 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Description EXPANSION TANK 15.00 Supply, installation, testing & commissioning of Closed loop expansion tank as per standards & requirements.The tank shall be made of mild steel and has a synthetic rubber membrane. Nitrogen gas or compressed air is filled in space between the membrane and the wall of the tank. The tank should be supplied complete with pumps(1W+1S), isolating valve, check valve, drain valve & pressure gauge. Before connecting the tank to water system, the gas pressure should be checked through the charging valve and adjusted according to the requirements. The quoted price shall be inclusive of structural support for the tank. Capacity of tank is 300 lts. Sl No Make : Anergy / ITT Industries / Grundfos DRAIN VALVE Drain Valve 25 mm dia Make : RB / Belimo AIR SEPARATOR AIR SEPERATOR300 Dia as per the schematic diagram Make : Anergy / ITT Industries CHEMICAL DOSING POT Supply, installation, testing & commissioning of Chemical dosing pot along with valves to be installed at Chillers water inlet line, as per Specifications. Make : Ion Exchange / PMI Process AUTO AIR VENT Supply, installation testing & commissioning of Auto Air vents Make : Anergy TEST POINT Test points For taking pressure & temperature measurements in Chiller's. Make : H GURU / Warry DRAIN PIPING Supply,installation, testing & commissioning of followig sizes insulated GI drain pipes Class 'B' from Ahu drain pans to nearest floor drain dnd from CHW pump glands to the nearest drain complete with interconnection,flanges,elbows,tees,nuts,U-trap etc.the insulation should be similar to chilled water piping insulation 21.01 21.02 21.03 21.04 21.05 80mm dia 65mm dia 50mm dia 40mm dia 25mm dia

Unit

Qty

Rate

Amount

Nos

16

Nos.

50

17

Nos.

18

Nos

19

Nos

20

20

Nos.

12

21

Rmt Rmt Rmt Rmt Rmt

R.O R.O 100 100 50

TOTAL VALUE FOR PIPING SYSTEM

Architects: BENTEL ASSOCIATES

Page 9 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No VI

Description AIR DISTRIBUTION SYSTEM

Unit

Qty

Rate

Amount

1.00 Supply, Fabrication, installation and testing of sheet metal ducts (FACTORY FABRICATED DUCTS) in accordance with the approved shop drawings complete with all accessories like vanes, flanges, suspension rods , anchor bolts, GI bolts & nuts, canvas connections , duct dampers & splitter dampers etc.,and as required by the specifications. All size duct should be with ductmate joints. No C & Ss clip joints should be used Make : Sail / Jindal / TATA 24 gauge galvanised sheet steel 22 gauge galvanised sheet steel 20 gauge galvanised sheet steel 18 gauge galvanised sheet steel

1.01 1.02 1.03 1.04

Sqm Sqm Sqm Sqm

2600 400 150 R.O

2.00 Supply, installation, testing and balancing of GSS Volume Control Dampers with operating handle for Supply air duct branches in accordance with the approved shop drawings and specifications. Make : Air Master / KC Industries / Caryaire 3.00 Supply installation testing and commissioning of Fire damper complete with standard accessories and 600 mm sleeve as per specifications. (Only Damper price of total Crosssectional Area) Make : Air Master / Caryaire / RaviStar with UL Listing 4.00 Supply installation testing and commissioning of Fire/Smoke damper suitable for motorized actuators, sensors, controls & all accessories as per specification - Torque 5 NM Make : Belimo / Siemens EXHUAST VALES FOR TOILETS 5.00 Supply, installation,testing & balancing of Exhaust Valves for Toilet Exhaust as per specifications & approved shop drawings for the following sizes. Make : Air Master / Caryaire 5.01 150 Dia 5.02 200 Dia 5.03 100 Dia 6.00 Supply, installation, testing and balancing of powder coated Extruded Aluminium supply air Diffusers with removable core , Aluminium opposed blade volume control dampers in accordance with the approved shop drawings and specifications to fit in the tile size of 600 x 600. The neck size shall be of following sizes Make : Air Master / Caryaire 450 x 450 375 x 375 300 x 300 225 x 225

Sqm

16

Sqm

Nos

Nos Nos Nos

R.O R.O R.O

6.01 6.02 6.03 6.04

Nos Nos Nos Nos

R.O 10 10 R.O

Architects: BENTEL ASSOCIATES

Page 10 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No Description 7.00 Supply, installation, testing and balancing of powder coated Extruded Aluminium Return air diffusers with removable core, in accordance with the approved shop drawings and specifications to fit in the tile size of 600 x 600 . The neck size shall be of following sizes Make : Air Master / Caryaire 7.01 450 x 450 7.02 375 x 375 8.00 Supply, installation, testing & commissioning of spill boxes made of 22G G.I with round neck necessary threaded rods for supporting & anchor fasten the of following sizes. Make : RolaStar / Zeco 8.01 600 x 600 X 350 8.02 150 x 150 X 250 8.03 400 x 400 X 350 9.00 Supply, installation, testing & commissioning of Spigot & Butterfly Dampers of the following sizes Make : Air Master / KC Industries / Caryaire 9.01 300 mm dia 9.02 250 mm dia 9.03 100 mm dia 10.00 Supply, Fabrication, installation and testing of the insulated flexible ducting , complete with connecting rings, duct supports etc as per standards and specification Make : Asiana pack / caryaire / interlock 10.01 250 dia 10.02 200 dia 10.03 150 dia 11.00 Supply & installation , testing and balancing of Al. Powder coated Continuous grills with
necessary flanges for supply & return air of the following sizes.

Unit

Qty

Rate

Amount

Nos Nos

R.O 20

Nos Nos Nos

R.O 370 R.O

Nos Nos Nos

R.O R.O 370

Rm Rm Rm

R.O R.O 550

11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08

Make: Airmaster / Caryaire / Rolastar / Dynacraft 100 mm wide continous grille 150 mm wide continous grille 200 mm wide continous grille 350 mm wide (STP Ventilation) grille 200 mm wide (PUMP ROOM Ventilation) 500 mm wide continous grille 300 mm wide continous grille Aluminium. collar damper

Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

RO 10 RO RO RO RO RO RO

FA LOUVER 12.00 Supply, & installation of powder coated Al. Louver for fresh air , filter, etc as per the sizes indicated in the drawing. Make : Air Master / Caryaire 13.00 Supply, installation and laying of INSULATION FOR FRESH AIR DUCTS with 50MM thick EPS and Sand Cement plaster VI TOTAL VALUE FOR AIR DISTRIBUTION SYSTEM

Sqm

Sqm

RO

Architects: BENTEL ASSOCIATES

Page 11 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No VII

Description INSULATION

Unit

Qty

Rate

Amount

NITRILE RUBBER INSULATION - Chilled Water Pipes 1.00 Supply, installation and testing of TF Quality Class 'O' Nitrile rubber of preformed pipe section ( Thicknes as below ) for all pipes with factory laminated aluminum foil facing,, 'fittings, valves, unions, etc as per specifications. The exposed pipes on terrace shall be with FRP lining and quoted with uv protective paints . The insulation should meet the green building norms. Make : Lloyds / Beardsell 350 mm dia 300 mm dia 250 mm dia 200 mm dia 150 mm dia 125 mm dia 100 mm dia 80 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia

1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13

Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt Rmt

100 300 100 30 30 25 600 600 780 100 100 450

ACCOUSTIC INSULATION 2.00 Supply, installation and testing of TF Quality Acoustic lining for supply and return air ducts with 25 mm thick rigid fibre glass of 48Kg/Cum density covered with factory laminated RP Tissue and finished with with 26G Perforated Aluminium sheet as per the specifications and as detailed in the drawings. (For details refer Technical specfication). Make : UP Twiga / Owens corning / Kimmco AHU/MECHANICAL PLANT ROOM 3.00 Supply and installation of acoustic lining on walls the AHU/mechanical plant room with 50 mm thick TF quality fibre glass and 48 Kg/Cum density with GI frame grid and covered with 22G perforated GI sheet as per the approved shop drawings & specifications. (For details Technical specfication). Make : KC Industries / Eqvt NITRILE RUBBER - Ducts 4.00 Supply & Installation of 13 mm thick TF quality Class 'O' Elastometric nitrile rubber for duct insulation. The quoted price inclusive of adhesives fixtures etc., Make : ArmaFlex / K - Flex UNDER DECK INSULATION 5.00 Supply and installation of Duct Thermal insulation on ducts with 19mm thick Class-O, Elestomeric Nitrile rubber insulation . The quoted price shall include 2" wide self adhesive black cotton tape, adhesive etc., Make : Beardsell / coolite / Indian packaging services / Styrene VII TOTAL VALUE FOR INSULATION

Sqm

300

Sqm

2800

Sqm

R.O

Sqm.

4250

Architects: BENTEL ASSOCIATES

Page 12 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No VIII 1 ELECTRICAL WORKS RELATED TO HVAC

Description

Unit

Qty

Rate

Amount

1.01 1.02 1.03 1.04 1.05 2

POWER WIRING Supply, installation, testing & laying of 1.1 KV grade XLPE insulated, Cu conductor armoured and PVC sheathed cables. Make : KEI / POLYLAB / HAVELLS / SBEE 4C x 16 sqmm - YRY 4C x 10 sqmm - YRY 4C x 6 sqmm - YRY 3C x 6 sqmm - YRY 3C x 4 sqmm - YRY

Rmt Rmt Rmt Rmt Rmt

100 150 75 150 150

CONTROL WIRING Make : KEI / POLYLAB / HAVELLS / SBEE 2.01 2C x 1.5 Sq.mm YRY (Cu) cable 2.02 3C x 1.5 Sq.mm YRY (Cu) cable 2.03 4C x 1.5 Sq.mm YRY (Cu) cable 3 4 4.1 4.2 5 Control cabling of 3C x 1.0 Sqmm between each pump to remote push button to be suitably laid in 1' PVC conduit. Supply, installation & Laying of G.I. Cable Tray of following width 150 mm wide 250 mm wide EARTHING Earthing conductor

Rmt Rmt Rmt Rmt

RO 500 RO 9

Rmt Rmt

250 500

5.01 25 * 3 GI Flat 5.02 8 SWG GI wire Supply, installation, testing of Electrical starter panel for Air Handling Units with necessary DOL / Start Delta starters, Indicating lamps,ammeter,Voltmeter,necessary controls, cabling, etc as per specification. The price should include end termination (copper).The starter shall be able to connect to BMS 1.1 KW 1.5 KW 2.2 KW 3.3 KW 5.5 KW 7.5 KW 9.3 KW 11 KW 15 KW 18.5 KW 20 KW Supply, installation, testing of Electrical starter panel for Pumps with necessary DOL / Start Delta starters, Indicating lamps,necessary controls, cabling, etc as per specification. The price should include end termination (copper). - Primary Chilled Water Pumps - Condenser Water pumps - Secondary Chilled Water Pumps

Rmt Rmt

1000 500

6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

63 RO RO 25 16 RO RO RO RO RO RO

7.01 5.5 KW ( 4 No's) 7.02 9.3 KW ( 3 No's) 7.03 9.3 KW ( 4 No's)

Set Set Set

1 1 1

Supply, installation, testing & commissioning of Converter box from Aluminium power cable to copper power cable for chillers . The price should include end termination (copper).

Nos

Architects: BENTEL ASSOCIATES

Page 13 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No 9

Description Supply, laying, testing & commissioning of copper power cable from converer box to chillers . (Refer Electrical SLD for cable Details) The price should include end termination (copper).

Unit Set

Qty 4

Rate

Amount

10 11 VIII

Supply, installation, testing & commissioning of Remote lockable push button starter for Ventilation fans, HRW and pumps The price should include end termination (copper). End terminations TOTAL VALUE FOR ELECTRICAL WORKS RELATED TO HVAC

Nos Nos

21 20

IX

BASEMENT VENTILATION WORKS Supply, Installation, Testing, Commissioning & Handing over of the following for Basement of Natural fresh air for upper basement and independent Forced exhaust air for both the basements. The complete system along with the procurement & installation shall be sourced from main manufacturer with a written system guarantee & final handing over & acceptance clearance test FRESH AIR FAN FOR UPPER BASEMENT Supply, installation testing & commissioning of high tempearture rated direct driven Smoke Spill Axial fan with VFD, for demand controlled ventialtion for 8 ACH opearation (For lower basement) - Fresh air. Each fan shall be complete with mounting legs, Ceiling Suspension Rod, Anchor Fastners & Spring Isolators, inlet screen, flexible connection at outlet, inlet silencer and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 25000 CFM, Static Pressure :25mmWC, Motor: 9.3 KW FRESH AIR FAN FOR LOWER BASEMENT Supply, installation testing & commissioning of high tempearture rated direct driven Smoke Spill Axial fan with VFD, for demand controlled ventialtion for 8 ACH opearation (For lower basement) - Fresh air. Each fan shall be complete with mounting legs, Ceiling Suspension Rod, Anchor Fastners & Spring Isolators, inlet screen, flexible connection at outlet, inlet silencer and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 25000 CFM, Static Pressure :25mm , Motor: 5.6 KW EXHAUST AIR FAN WITH VFD FOR UPPER BASEMENT Supply, installation testing & commissioning of high tempearture rated direct driven Smoke Spill Axial fan with VFD, for demand controlled ventialtion for 8 ACH/16 ACH opearation (For Upper basement) - Exhaust Air. Each fan shall be complete with mounting legs, outlet screen, flexible connection at inlet or outlet and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 30000 CFM, Static Pressure :25mmWC, Motor: 11.0 KW EXHAUST AIR FAN WITH CONSTANT SPEED FOR UPPER BASEMENT Supply, installation testing & commissioning of high tempearture rated Axial fan with constant speed star delta starters,non return damper,Each fan shall be complete with mounting legs, outlet screen, flexible connection at inlet or outlet and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 30000 CFM, Static Pressure :25mmWC, Motor: 11.0 KW Nos 4 Nos 4

Nos

Nos

Architects: BENTEL ASSOCIATES

Page 14 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No

Description EXHAUST AIR FAN WITH VFD FOR LOWER BASEMENT Supply, installation testing & commissioning of high tempearture rated direct driven Smoke Spill Axial fan with VFD, for demand controlled ventialtion for 10 ACH opearation (For lower basement) - Exhaust Air. Each fan shall be complete with mounting legs, outlet screen, flexible connection at inlet or outlet and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 48750 CFM, Static Pressure :25mmWC, Motor: 11.0 KW EXHAUST AIR FAN WITH CONSTANT SPEED FOR LOWER BASEMENT Supply, installation testing & commissioning of high tempearture rated Axial fan with constant speed star delta starters,non return damper,Each fan shall be complete with mounting legs, outlet screen, flexible connection at inlet or outlet and rated 180C for 2 hours Class-H Motor suitable for 415+10% volts, 50 cycles , 3 phase AC supply. Make : Flaktwoods / System Air / Green Heck / Humidin 48750 CFM, Static Pressure :25mmWC, Motor: 11.0 KW JET FAN JET FAN Installation of jet fans QTY OF JET FAN SHALL BE FREEZED AFTER CFD ANALYSIS. Make : Flaktwoods / System Air / Green Heck / Humidin Lower Basement Upper Basement CFD ANALYSIS Computational Fluid Dynamics analysis report should include submittal of 3 sets of Color printed report document and the location of Jet fans. CO SENSORS Supply, Installation, Testing & Commissioning of CO Sensors (Location of the CO Sensor should be as per CFD Analysis) Make : Grey Stone / Honey Well PLC PANEL FOR UPPER BASEMENT Floor mounted free standing compartmentalized fire rated Electrical MCC Panel as per IS standards 8623 with Protection Class of IP 42 and Fault level of 25kA. The panel made out of 14 SWG CRCA sheet finished with Siemens Grey painting. The Panel consists of suitable dual Incomer (One incomer from Common area panel and another incomer from Fire emergency panel), Feeders and Starters for 24 nos. of Jet fans of 1.1 KW each (0.14KW for low speed / 1.1KW for High speed) and 4 nos of dual speed Axial fans of 7.5/15 KW with Danfoss VFD & 5 nos. of Axial fans of 11 KW each with star delta starters, with 5 nos. spare feeders, MCCB, Metering panel, top cable entry, aluminum bus bar and custom built microprocessor logic controller with necessary control wiring etc. Each feeder shall have TPN MCB, two starters and indication lamps, toggle switch for two speed operations and Electrical interlock for two speed functions. It should control of JET fans for demand ventilation with a logic. Vendor should submit SLD and GA drawings for consultants approval. LOGIC CONTROL microprocessor logic PANEL to perform the logical operation of Speed change in fans from Low to high speed based on the CO Level in the basement. The control is envisaged for JET Vent fans and AXIAL fans. ALL these fans should also be SWITCHED on in full speed incase of Receipt of FIRE SIGNAL. The Logical Operation of Pollution mode and FIRE mode is desired from the control panel\. This shall also include all the necessary cabling & control wiring for all the fans. Make : ABB / Schneider PLC PANEL FOR LOWER BASEMENT

Unit

Qty

Rate

Amount

Nos

Nos

a b

Nos Nos

14 13

Lot

Nos

14

Sets

Architects: BENTEL ASSOCIATES

Page 15 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

HVAC LOW SIDE BOQ

Sl No

Description Floor mounted free standing compartmentalized fire rated Electrical MCC Panel as per IS standards 8623 with Protection Class of IP 42 and Fault level of 25kA. The panel made out of 14 SWG CRCA sheet finished with Siemens Grey painting. The Panel consists of suitable dual Incomer (One incomer from Common area panel and another incomer from Fire emergency panel), Feeders and Starters for 7 nos. of Jet fans of 1.1 KW each (0.14KW for low speed / 1.1KW for High speed) and 2 nos of Axial fans of 9.5 KW with Danfoss VFD & 1 no. of Axial fans of 7.5 KW with star delta starters, with 5 nos. spare feeders, MCCB, Metering panel, top cable entry, aluminum bus bar and custom built microprocessor logic controller with necessary control wiring etc. Each feeder shall have TPN MCB, two starters and indication lamps, toggle switch for two speed operations and Electrical interlock for two speed functions. It should control of JET fans for demand ventilation with a logic. Vendor should submit SLD and GA drawings for consultants approval. LOGIC CONTROL microprocessor logic PANEL to perform the logical operation of Speed change in fans from Low to high speed based on the CO Level in the basement. The control is envisaged for JET Vent fans and AXIAL fans. ALL these fans should also be SWITCHED on in full speed incase of Receipt of FIRE SIGNAL. The Logical Operation of Pollution mode and FIRE mode is desired from the control panel\. This shall also include all the necessary cabling & control wiring for all the fans. Make : ABB / Schneider POWER CABLING Supply and Laying of Following Size fire rated FRLS aluminium/copper cables with necessary supports. The cables shall be pvc sheathed or armoured cables with including standard cu lugs with terminating Make : KEI / POLYLAB / HAVELLS / SBEE 3 C X 1.5 Sq.mm FRLS Armoured Copper Cable 2 runs for high & Low speed (from Car Park Ventilation Panel to Jet Vent Fans) 4 C X 25 Sq.mm FRLS Armoured Aluminium Cable (from Car Park Ventilation Panel to Extract Fans) 2C X 1 Sq.mm FRLS Copper cable unarmoured in 19 mm PVC conduit (from PLC Panel to CO Sensor ) Providing & Install cable terminations for the below cables including double compression type chrome plated brass glands and lugs(crimping type), gland earthing, PVC taping as required and all accessories complete. 3 C X 1.5 Sq.mm FRLS Armoured Copper Cable (from Jetfan to electrical panel) 4 C X 25 Sq.mm FRLS Armoured Aluminium Cable (from Emergency extract fan to electrical panel) 2C X 1 Sq.mm FRLS Copper cable unarmoured in 19 mm PVC conduit (from CO Sensor to PLC Panel) Supply of Sheet steel Ladder Type cable tray of 450 mm width with necessary supports for extract fans 450 mm wide 300 mm wide Supply,Installation of Earthing wire for, Extract Fans, Supply Fans, Electrical Panel (25 x 3 mm width G.I) Supply,Installation of Earthing Wire for Jet Vent fans - 8SWG Supply, Fabrication suitable to site condition and installation of MS Frame work using ISMC for Extract Fans/ Supply fans etc., with 2 coat of redoxide and 2 coat of black enamal painting. TOTAL VALUE FOR BASEMENT VENTILATION WORKS TOTAL AIR CONDITIONING WORKS Amount Excluding VAT & Service Tax VAT Amount Service Tax Amount Amount Including VAT & Service Tax Excise Duty Component Included in the Supply Portion

Unit

Qty

Rate

Amount

Sets

a b c

Rmt Rmt Rmt

600 450 500

8 a b c

Set Set Set

50 20 30

9 a b 10 11

Rmt Rmt Rmt Rmt

RO 350 300 510

12

Kgs

300

IX

Architects: BENTEL ASSOCIATES

Page 16 of 16

Consultants :- Entask Consultancy services Pvt Ltd.

Project:-OZONE GALLERIA @ RANCHI

Summary

PROJECT: OZONE GALLERIA MALL @ RANCHI


SUMMARY SHEET FOR HVAC LOWSIDE WORKS Sl No Description Total Amount (in Rs)

I II III IV V VI VII VIII IX

TOTAL VALUE FOR COOLING TOWER TOTAL VALUE FOR CENTRIFUGAL PUMPS TOTAL VALUE FOR AIR HANDLING UNIT & HRW TOTAL VALUE FOR CENTRIFUGAL FANS TOTAL VALUE FOR PIPING SYSTEM TOTAL VALUE FOR AIR DISTRIBUTION WORKS TOTAL VALUE FOR INSULATION TOTAL VALUE FOR ELECTRICAL WORKS RELATED TO HVAC TOTAL VALUE FOR BASEMENT VENTILATION

GRAND TOTAL