Diagnostic Measurements on Power Transformers

Introduction
Partial Discharges (PD) "localized electrical discharges that only partially bridge the insulation between conductors" [IEC 60270:2000] can harm insulation systems generate electromagnetic signals PD Measurement General specifications: IEC 60270:2000
o

measurable

Transformers: IEC 60076 (and others)

INTRODUCTION INTO PARTIAL DISCHARGE (PD) PHENOMENA AND PD MEASUREMENT

detection of critical defects recognition of defects assessment of risk

Dr. Michael Krger

May 10

PAGE 2

PD Inception and Extinction Voltage

PD Classification

Internal PD has hystersis External corona has normally no hysteresis

a) corona discharge c) discharge in laminated material


IEC 60034-27

b) surface discharges d) cavity discharge

e) treeing
PAGE 3 May 10 PAGE 4

May 10

Electrical Treeing in PE

Electrical Treeing in PE

May 10

PAGE 5

May 10

PAGE 6

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

Detection of PD

Equivalent Circuit Diagram


A
Ut(t)

2CS

Chemical (DGA) Optical (e.g. UV camera for corona) Electrical (narrow band or wide band) according to IEC 60270 Acoustical UHF

CP/2

CF 2CS

r
CP/2
Uz UL -UL -Uz

U1(t)

U'1(t)

Is(t) I2(t) CS R1

I1(t)

I3(t) Ut CP

U1 CF

I1(t) S

q = U 1 .C F
May 10

q = i1 (t ).dt
PAGE 8

May 10

PAGE 7

Apparent Charge
Apparent charge q , of a pulse is that charge which, if injected between the terminals of the test object, would give the same reading on the measuring instrument as the PD current pulse itself. Expressed usually in pC. The apparent charge is not equal to the amount of charge locally involved at the site of the discharge, which can not measured directly.
May 10 PAGE 9

When to measure?
Factory test:
Standard measurement during the AC withstand test for every new (or repaired) transformer. Usually low ground noise level.

On-site test:
After indication of DGA results. Usually high ground noise level and other disturbances.

May 10

PAGE 10

The classical visualization

PRPD Phase Resolved Histogram

May 10

PAGE 11

May 10

PAGE 12

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

Calibration of the PD Instrument


Z

Conventional Coupling of the Measuring Device

Q= C = *k U smax .q
Calibrator
C0

I(t) A Ct

CK

Smax

U~
U0

Transformer under test


M

Coupling capacitor IPD

Amp.

Filter

Um Zm Measuring Impedanc e

Cc
Testing transformer Fault (discharge) PD

May 10

PAGE 13

May 10

PAGE 14

Typical PD Measurement in a Test Lab


Coupling capacitor Testing transformer Test object Faraday cage PD instrument

Noise Filtering
- High bandwidth desirable for sensitive measurement and high pulse repetition rates - Low bandwidth improves interference rejection - Always use the highest possible bandwidth - Only a variable filter is suitable for on-site measurements

May 10

PAGE 15

May 10

PAGE 16

Analogue and Digital PD measuring instruments

Traditional PD Measurement
Analogue PD measuring instrument

PD systems

May 10

Page: 17

May 10

PAGE 18

14/

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

"Digital" PD Measurement with Analogue Filter

"Digital" PD Measurement with MultiChannels and MUX

May 10

PAGE 19

May 10

PAGE 20

MPD 600 True Digital Measurement with Digital Filtering

Synchronous Multi-Channel PD Measurement System MPD600

May 10

PAGE 22

May 10

Page: 24

14/

Synchronous multi-channel measurement

Separation of PD and Corona Sources at Different Locations with 3PARD

3PARD = Three Phase Amplitude Relation Diagram

May 10

PAGE 26

May 10

PAGE 27

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

Inner PD source in L1 in 3PARD


3PARD

Outer noise in 3PARD


3PARD

L2
Inner PD Source in L1

Inner PD Source L1>L2>L3 L1

L2
Outer Noise

Outer Noise L1 L2 L3 L1

L2

L2

L3

L3

L3

L1
timeframe 1 s

L3

L1
timeframe 1 s

3PARD = Three Phase Amplitude Relation Diagram

3PARD = Three Phase Amplitude Relation Diagram

May 10

PAGE 28

May 10

PAGE 29

3PARD

Back Transformation

May 10

PAGE 30

May 10

PAGE 31

3CFRD 3 Center Frequency Relation Diagram


PD source 1 PD source 2 PD source 3

Measurement at Three Different Frequencies with 3CFRD

Frequency 2 MPD600

Needle

FFT of all three impulses


Frequency 1 Frequency 2 Frequency 3

Surface discharge
PD source 1 PD source 2

FFT pulse 2 FFT pulse 1

Faulty joint

FFT pulse 3
Frequency 3 PD source 3 Frequency 1

22kV_Corona_Surface_Joint
May 10 PAGE 33

May 10

PAGE 32

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

Case Studies

Coupling of the PD Measurement Instrument to the HV Bushing Measuring Tap

PD Measurements on Power Transformers Coupling of the Measuring System


MPD600

May 10

PAGE 34

May 10

PAGE 37

Power Transformer 132kV/32kV in the Factory

PD Decoupling at the Measuring Tap of the HV Bushing

May 10

PAGE 38

May 10

PAGE 39

PD Decoupling at the Measuring Tap of the HV Bushing


Advantage Little constructive effort No coupling capacitors necessary Drawback Measuring tap not always accessible / existing

PD Decoupling by Coupling Capacitors

MPD600

May 10

PAGE 40

May 10

PAGE 41

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

PD Decoupling by Coupling Capacitors

PD Decoupling by Coupling Capacitors

May 10

PAGE 42

May 10

PAGE 43

HV Connections PD free!

Inductive PD Decoupling at Cable Screen

May 10

PAGE 44

May 10

PAGE 45

Capacitive Sensors

Practical Examples

MPD 600 MPD 600 MPD 600

PD Measurements on Power Transformers Measuring Results

Sensor for capacitive coupling (Patented by the University of Hannover)


May 10 PAGE 46 May 10 PAGE 47

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

Measuring Results
30 MVA Transformer, 115 kV / 11.3 kV

Synchronous Multi-Channel PD Measurement


on a 30MVA 115 / 11.3 kV Transformer

May 10

PAGE 48

May 10

Page 49

Measuring Results

Decoupling of PD at the Neutral

30 MVA Transformer, 115 kV / 11.3 kV


Statistical Noise

External Disturbance

PD Fault

May 10

PAGE 50

May 10

PAGE 51

Transformer with Coupling Capacitors, Step-up Transformer and Diesel Generator

Simultaneous PD Measurement on 3 Phases

W
Diesel Generator

U
Coupling capacitor with MPD 600 on U

Transformer
Step-up transformer 400V / 21kV
May 10 Page 52

without 3PARD filtering W

with 3PARD filtering


May 10

Page 53

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

3CFRD 3 Center Frequency Relation Diagram


PD source 1 PD source 2 PD source 3

Simultaneous PD Measurement at 3 Different Center Frequencies, Phase U


3MHz

Frequency 2 MPD600

300kHz

10MHz
FFT of all three impulses
Frequency 1 Frequency 2 Frequency 3

FFT pulse 2 FFT pulse 1

PD source 1 PD source 2

without filtering
10MHz
Frequency 1

3MHz

with filtering
300kHz

FFT pulse 3
Frequency 3 PD source 3

May 10

Page 54

May 10

Page 55

Decrease of the PD Amplidude with Increasing Frequencies

Combined UHF and IEC Measurements

3MHz

10MHz

PD is not close to the measurement point (bushing)


May 10 Page 56 OMICRON Energy

May 10

14.05.2010

Page 61

PAGE 61

Connection to the Measuring Tap of the Bushing

UHF Sensor at the Main Valve

OMICRON Energy

May 10

14.05.2010

Page 62

PAGE 62

OMICRON Energy

May 10

14.05.2010

Page 63

PAGE 63

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Diagnostic Measurements on Power Transformers

The OMICRON mtronix Solution

The OMICRON mtronix Solution

May 10

PAGE 64

May 10

PAGE 65

Combined UHF and IEC measurement

Summary
Partial Discharges (PD) can lead to outages PD measurement is reasonable tool for diagnosis and quality control

IEC PD Measurement

UHF PD Measurement

Sensitive PD measurements: High demands on PD measuring system MPD600: a variable tool for all kind of application
electrical equipment (cable, transformer, rot. machines, ) measuring condition (laboratory, factory, on-site)

Corrected IEC PD Measurement

May 10

PAGE 66

May 10

PAGE 67

Michael Krger e Marcelo Paulino - So Paulo maio/2010

Thank You for Your kind attention!