Beruflich Dokumente
Kultur Dokumente
Transfer
Agreement for
Year 2009-2010
Between
Telecom Egypt
- Hereinafter referred to as "TE" -
And
Part I ............................................................................................ 4
1.1 Introduction
1.2 Concept
1.3 Scope of Work
1.4 Requirements & pre-requisites for the Technical Knowledge
Transfer Agreement
1.5 Services not included
1.6 Agreement duration
1.7 Offer Validity
Part II .......................................................................................... 9
Module 1:
Education
On Job training
Training on Technology
This will be considered per geographical area depending on the
technology existence. (Estimated 50 engineer)
Module 2:
Operation support & network Support
Experts to cover the network complexity.
Module 3:
Fault Management
TSC solution expansion to cover tickets
Spare Management
Manage existing spares / Spare evaluation per area
Module 4:
Network Optimization
Module 5:
SW Life Extender Service
Module 6:
Knowledge Transfer through a Shared Intranet
Module 7:
Knowledge Transfer through local enabling measures.
Knowledge Transfer through Technology Updates.
1 Commercial Conditions
2. Payment Conditions:
3. Effective Date of the Contract (E.D.C.):
4. Execution Time:
5. Validity Time:
6. General Conditions:
ANNEX 2: Contacts........................................................................ 65
4. Module 4:
• Network Optimization
• Traffic routing / redesign for 8 Network.
5. Module 5:
• SW Life Extender Service
6. Module 6:
• Knowledge Transfer through a Shared Intranet
7. Module 7:
• Knowledge Transfer through local enabling measures.
• Knowledge Transfer through Technology Updates.
The services shall not comprise any services or supplies, which are
required as a result of or in connection with one or more of the
following:
Products that are declared as End of Life (EoL i.e. Phased out)
This agreement shall commence after the closure of the existing O&M
agreement 15/2005/42
Module 1
1.1 Introduction
The scope of the module implementation will be based on 3 parts starting with
the entry examination to evaluate the candidates and assure the best output
calipers for TE.
Duration Number of
Course Code Course Name
(days) participant
hiT 7070 / hiT 7050
Duration Number of
Course Code Course Name
(days) participant
HiT 7070/HiT 7050
SURPASS hiT 7070,7050 O&M; General
FT5232-00S 3 16
Topics
SURPASS hiT 7070,7050 OAM; SDH and
FT5233-00S Equipment Core Functionalities Advanced 3 16
Topics
TNMS
TNMS-Core/CDM Operation and
FT9212-01A Administration for Next Generation SDH 5 16
networks
FT9219-00S TNMS-Core Installation and Commissioning 2 16
DCN planning / Routers
FT1102-00S Next Generation Optical Network 5 16
FT1802-00S DCN in Next Generation SDH Networks 4 16
2.1 Introduction
The operation support is divided in 2 parts, first the O&M procedure development
which contains the O&M procedure documentation development in addition to
the O&M procedure mentoring.
On the other hand and regarding the Service overview managed by the
expert support for handling O&M activities a Competent Support for day-to-
day network operations is expected within the following:
Service summary
Nokia Siemens Networks Network Operations Service is designed for
operators who want to purchase part or all of the technical network
operations as a managed service. Nokia Siemens Networks Network
Operations Service is delivered against a clear Service Level Agreement
(SLA), which ensures a high quality of the delivered service and
facilitates proper governance for both Nokia Siemens Networks and
Telecom Egypt. In addition, this service enables Telecom Egypt to
accurately plan network operations OPEX.
NOC Management
The NOC Management is responsible for all NOC business processes,
NOC planning and NOC personnel related issues. NOC Management
activities include:
y NOC planning, steering and monitor all aspects of the NOC activities.
Performance management
Performance management includes analyzing and reporting the quality of
end-user services as well as network performance and availability. The
main activities include:
• Collection of service quality and network performance data from the
OSS
• Generating basic quality, performance and traffic statistics and
reports
• Monitoring the long-term development of service quality and the
network’s performance
• Analysis of quality and performance degradation
Security Management
Security Management is responsible for the day-to-day management of
security related to the operation and the access to OSS systems and
Network Elements as well as Site / Infrastructure security.
System administration
2. User management
• User authorization and authentication
• Access management and control
Share of responsibility
• 24 hour, 365 days a year access for all sites and facilities
Nokia Siemens Networks will provide a detailed list of the equipment and
tools required for the Nokia Siemens Networks Network Operation
Service. The tools and equipment provided by Nokia Siemens Networks
for its O&M team include laptops, mobile phones, and field maintenance
tools.
Definitions
Trouble tbd
Overview:
Spare Pool:
• Fault incident recording
• Equipment Assets
• Inventory Control:
• Preventive Maintenance Management:
• Track location and serial number of spare parts and relate
them to contracts
Spare pool is per region and each region should have its
own interface to manage
• Analyze
• Optimize
• Implement
The respective activities during these phases are indicated on a high level in the
following Figure:
Optimisation and Assurance - General
• Change • Collect
• Update • Trace
• Fix Measure
• Test
• Add • Count
• Remove • Read
• Verify • Investigate
Implement
Analyse
• Visualize
• Evaluate • Derive
• Solve • Compare
• Prioritize • Correct
• Proceed Optimize • Discover
• Recommend • Determine
• Reengineer • Consider
Reliability
Reliability of the network is a key functionality to meet SLAs towards customers.
Three areas will be analyzed
• Resilience
Traffic Protection within the network will be checked (SNCP,
MSP, BSHR, etc.). HW redundancy and TNMS network
management redundancy will be analyzed. Goal is to ensure the
required resilience for Customer.
• Security
Mainly security settings of TNMS are checked. Goal is to use
ensure the required security level of Customer.
Efficiency
• Alarm reduction
an important measure to enhance network management
efficiency is to reduce the number of alarm displayed in TNMS,
only the real relevant alarms should be displayed. Goal is to
identify unnecessary alarms and to suppress them.
• Over resilience
typically there are parts of the network which are overprotected
due to the combination of different protection mechanisms.
Goal is to identify these cases and to free the resources.
• Parameter adjustment
several parameters of TNMS-Core and Network Elements have
to be correlated to reach a higher efficiency. Goal is to adjust
these values to enhance efficiency.
Flexibility
• NEs
• TNMS Server/Net-Server/Clients
4.2 Duration
To be defined
4.3 Deliverables
The collected data of this phase will be considered in the Analysis phase.
There are no dedicated deliverables of these phases.
4.5 Activities
Mismatches between planning or guidelines and realization shall be
identified.
The following list gives an overview of the checks, which will be executed by
Nokia Siemens Networks:
4.6 Duration
To be defined.
Introduction
Nokia Siemens Networks Care offers a full range of maintenance
services to suit the needs of your network. Offering world wide service
delivery through highly skilled engineers, Nokia Siemens Networks
Care is designed to perform in the best and most cost-effective way
possible. This ensures that we can overcome the critical situations
facing your network, solve solution and equipment problems, answer
your technical questions and address the unique needs of each
operator’s network. We achieve this through providing preventive and
corrective maintenance services for your products and solutions and
by helping you keep your platforms ready to launch new services in
the shortest possible time.
Benefits at a glance:
Service introduction
This SW Life Extender Care Service is designed to safeguard the
network investment with proper incident management and issue
resolution. The SW Life Extender services provide the basis for a
competitive and reliable network by keeping network equipment in
good operating conditions while preparing for Network renewal. It
allows increased stability of the network and reduces risk of Operator’s
business during the necessary additional time needed before Network
replacement is completed.
The key deliverable of the Nokia Siemens Networks SWS Life Extender
Service is technical expertise and guidance for resolving critical
network faults and technical queries. This support from Nokia Siemens
Networks improves the efficiency of the Customer’s network
operations.
The right focus on SWS Life Extender allows the TE to achieve the
highest possible network usability and availability, quality and
compatibility in increasingly complex networks and reductions in the
operational costs of the network.
Service Module LE B
1. Emergency support X
2. Trouble resolution X
3. Technical query X
Overview
This service offers the fastest possible restoration of the Customer’s
end-user services or network equipment in emergency situations
where part or all of the network element’s functionalities are not
available. The service is available 24 hours, 365 days a year through
global GCC Network. The service also includes Customer management
communication and escalations if needed.
In the event of an emergency, the support will be called for via the
defined emergency contact number. Nokia Siemens Networks will
capture the emergency support request and manage the restoration
activities. The restoration work is carried out by Nokia Siemens
Networks emergency support experts.
Deliverables
Nokia Siemens Networks Emergency Support experts are available 24
hours 365 days a year.
Share of responsibilities
Share of responsibilities: Emergency Support
Issue Nokia TE
Siemens
Networks
Initiative call via a defined emergency R
phone number
R: Responsible, A: Assistance
Overview
The Nokia Siemens Networks Trouble Resolution Service handles TE
reported technical problems and malfunctions during the operation of
the Nokia Siemens Networks network. The service provides a contact
point for submitting the details of the identified or suspected defect,
assignment of the technical support expert for the case, investigation,
troubleshooting and documentation of the problem, regular updates
on progress of the trouble investigation and the delivery of the
workaround (if available for product) within the agreed response and
resolution times.
Deliverables
Confirmation of the support case submission
Share of responsibilities
Share of responsibilities: Trouble Resolution Service
R: Responsible, A: Assistance
Overview
The Nokia Siemens Networks Technical Query Service provides
answers and assistance for technical and operational queries
regarding daily network operations and maintenance. Queries are
handled by technical experts and they provide qualified responses
within the agreed response time.
A central technical support teams will analyze and evaluate the query
and provide a qualified response in writing, within the defined time
frame according to the priority of the query.
On receiving the response, the Customer will check the reply and
confirm to Nokia Siemens Networks technical support if the case can
be closed.
Deliverables
Access to technical and system expertise in English.
Regular status updates on the progress of the query until final answer.
Issue Nokia TE
Siemens
Networks
Initiation of the ticket, assigning a priority R
level
R: Responsible, A: Assistance
Initial response
The initial response is sent by a service engineer after receiving the
case. The content includes the contact partner, case identification
details, determination of priority and possibly requirements for
additional information.
Restoration
Restoration means to put a system back into operation, so that the
service is available again. This could be done e.g. via rebooting the
system, restoring the database…If a hardware fault was the reason,
the information to change the defect module will be given. Restoration
does not necessarily mean to solve root cause of the problem but it
means to restore traffic lost.
Workaround
A workaround is an action to manage the failure situation and
minimize the effect. A workaround may include an operational advice.
Workaround is searched with best efforts and may need restoration to
earlier configuration in the NW
Final correction
Delivery of a solution to the Customer reported problem. The final
correction must be available for the Customer via the agreed media.
Confidence level
Nokia Siemens Networks commits to have target to provide services
for at least ninety percent of all cases within response times.
Exceptions
Time to collect additional or missing error symptoms are excluded
from final correction time if initial information is not adequate to
investigate the issue.
Emergency case
Emergency case stands for the highest fault priority (critical). There is
only one priority defined for the emergency service:
Trouble resolution
Handles suspected or identified defects. The case criticalities are
described in the next chapter.
Technical query
Handles technical queries, operational problems regarding daily
network operations and maintenance. Nokia Siemens Networks
defines two priorities for the technical queries.
Major fault P1
Conditions that seriously affect system operation, maintenance and
administration and require immediate attention as viewed by the
Customer following discussion with the supplier. For example:
Medium fault P2
Conditions that seriously affect system operation, maintenance and
administration, and require attention as viewed by the Customer
following discussion with the supplier. The urgency is less than in
critical situations because of a lesser immediate or impending effect
on system performance, customers and the customer’s operation and
revenue. For example:
• On Site troubleshooting
• On site maintenance
The service availability will be three hours from entering (3 hrs + Transportation
time) for only the critical cases (e.g. traffic outage). The on site support service
is based on a condition that Telecom Egypt will provide the needed spare parts
on site.
General requirements
Nokia Siemens Networks shall be allowed full and free access to sites.
Availability of e-channel
The service provides access to the latest Nokia Siemens Networks
technical information, advanced web-based tools. It forms a subset of
services delivered via an extranet channel. The service is available to
the customer 24 hours a day, 7 days a week through the Nokia
Siemens Networks extranet.
Valid contract
Customers will need a valid contract to get access to any Nokia
Siemens Networks Care service. This means that any customer
without a valid contract will be rejected.
6.1 Introduction
Knowledge sharing intranet is a strategic tool to boost customer service, improve
knowledge management, save time, share best practices and increase
productivity. The proposed solution will enable both NSN and Telecom Egypt to
have a common and solid ground for sharing information, capturing and
managing knowledge in a very efficient and interactive way.
This solution will improve the flow of information and knowledge It will act as a
technology enabler and catalyst for knowledge sharing between the two entities
to meet the agreed upon business goals and to strengthen their long term
partnership.
NSN will facilitate the described services through an Internet web site. The
number of subscribers to the different services is limited to a maximum of 100
subscribers (as a first stage) from Telecom Egypt side. All the initial contents
(documentation, presentations, software and firmware) will be prepared and
published by NSN. Also on job enabling sessions will be conducted in order to
make sure of the maximum utilization of the available services.
A. Content Management:
With the Content Management you engage more employees in the critical
process of content creation and submission. Empowering knowledge experts,
rather than IT professionals, to manage and publish content dramatically reduces
your ongoing maintenance costs and increases the contextual relevance of your
intranet.
B. Document Management:
80 to 90 percent of a typical enterprise's knowledge resource exists as
unstructured data in documents, reports, e-mail, graphics, images, audio and
video files. These data sources are largely inaccessible from existing information
systems. Intranet document management allows the sophisticated management
of these resources. It also provides multi access/permissions to these
unstructured data sources and unifies the delivery of the content.
J. Group/User Administration:
It will include easy access of user accounts generation as well as groups for the
administrators group
K. Security Administration:
It will allow setting security rules on different users and groups using the intranet
and setting the web folders access rights
NSN will also arrange local enabling sessions/workshops, which shall concentrate
some TE special points of interest.
These local sessions/workshops shall deal with Egypt relevant network
configuration aspects only; the technical content is subject to mutual agreement
between NSN and TE, minimum 4 weeks prior to planned commencing date.
Such events –as completely outside of standard training scope –shall be always
considered as on best effort base and are limited to a maximum of 60 Group
Days (6 participants/Group).
The distribution of Group Days will be allocated according to a mutual agreement
with NSN
The updates can be distributed over the shared intranet (e-mail, discussion
group…) or can be done in the form of seminars or presentations.
The total offered price for the before mentioned services is 4,400,000 Euro.
1. Prices:
In case of coming into force of any other duties or taxes related to the
Contract, the prices have to be mutually agreed.
Telecom Egypt shall deduct withholding tax from every invoice and shall
provide Nokia Siemens Networks with the respective certificate at the end
of every three months.
Telecom Egypt will assist Nokia Siemens Networks to facilitate paying the
social insurance to the social insurance authorities as following:
1. Telecom Egypt should approve and stamp the translated Contract and
issue a covering letter addressed to the social insurance authority.
2. Telecom Egypt should approve and sign the translated copy of Nokia
Siemens Networks invoices and issue a covering letter addressed to
social insurance authority.
• All payments shall be paid by cheques within thirty (30) days from
the date of the respective invoice.
100% (Hundred percent) of the Contract value in Euro shall be paid in four (4)
equal quarterly installments at the end of every three months by cheques
against presentation of the respective commercial invoice as follows:
25% (Twenty five percent) of the Contract value in Euro shall be converted
from Euro to EGP at the selling rate (Transfer – Sell) of the Central Bank
of Egypt on the date of each respective invoice (date of the invoice).
25% (Twenty five percent) of the Contract value in Euro shall be converted
from Euro to EGP at the selling rate (Transfer – Sell) of the Central Bank
of Egypt on the date of each respective invoice (date of the invoice).
25% (Twenty five percent) of the Contract value in Euro shall be converted
from Euro to EGP at the selling rate (Transfer – Sell) of the Central Bank
of Egypt on the date of each respective invoice (date of the invoice).
25% (Twenty five percent) of the Contract value in Euro shall be converted
from Euro to EGP at the selling rate (Transfer – Sell) of the Central Bank
of Egypt on the date of each respective invoice (date of the invoice).
4. Execution Time:
The Execution time shall be Twelve (12) months from E.D.C with
mobilization time 3 months.
5. Validity Time:
This offer is valid until July 16th, 2009. Nokia Siemens Networks must
confirm any extension of the validity.
6. General Conditions:
NSN:
Head of Service:
Tel.: +20-2-38282151
Fax: +20-10-6078126
E-Mail: Sharafeldin.mohamed@nsn.com
Tel.: +20-10-1662990
Fax: +20-2-38333349
E-Mail: Yehia.mourad@nsn.com
Program Manager:
Tel.: +20-2-38282221
Fax: +20-2-38333349
E-Mail: amr.ibrahim@nsn.com
Tel.: +20-2-31315022
Fax: +20-2-31315020
Tel.: +20-2-25915222
Fax: +20-2-25915395
Tel.: +20-2-7871144
Fax: +20-2-7871122