SOP FOR FLUSHING OF MIXED BED POLISHER

Document No: SOP/UTY Issue No : 01 Revision No : 00 Effective Date : 30-10-13 Page 1 of 5

Prepared By: Graduate Trainee Engineer (MHH)

Reviewed By: Utility Process Engineer (UM)

Approved By: Manager Utilities (AA)

Change Record
Sr.No Rev. No Date Page No. Section Description of Change

Distribution Lists
LAN Process Engineering File Control Room File

SOP FOR FLUSHING OF MIXED BED POLISHER

Document No: SOP/UTY Issue No : 01 Revision No : 00 Effective Date : 30-10-13 Page 2 of 5

1.
1.1

Objective & Scope


Objective The objective of this SOP is to provide system and instructions to the executors for carrying out safe and sound flushing of Mixed Bed Polisher in order to make safe operation without any incident. Scope This SOP describes safety considerations and other requirements for carrying out effective flushing procedure of mixed bed polisher at EEAP.

1.2

2.
1. 2. 3. 4.

Responsibility
Utilities Mechanical Interface Instrument Interface Project Engineering

3.

Information
Follow the flushing of mixed bed polisher checklist

SOP FOR FLUSHING OF MIXED BED POLISHER

Document No: SOP/UTY Issue No : 01 Revision No : 00 Effective Date : 30-10-13 Page 3 of 5

4. Checklist of Flushing procedure of MBP:


Sr. No. 1 Description Check that no work is in progress in the area. Yes No N/A Remarks

Ensure that no other person is present in the area other than plant operator. Ensure that all the vessels and tanks have been firmly secured to the foundation and the piping is well fixed by the supports. Check that Feed water of specified quality, quantity, and pressure is available. Ensure that treated water supply is connected to the treated water storage tank. Ensure that dust and oil free instrument air is available at the required pressure. Ensure that 30% w/w HCl solution is ready in the acid dosing tank. Ensure that 50% w/w NaOH solution is ready in the acid dosing tank. Check that all interlocks and indication lights on the panel are properly set.

10

Ensure all pipe fittings are tight.

11

Check that power supply is available.

SOP FOR FLUSHING OF MIXED BED POLISHER

Document No: SOP/UTY Issue No : 01 Revision No : 00 Effective Date : 30-10-13 Page 4 of 5

12

Ensure no leakage is present in the system.

13

Ensure PPE`s regulations are followed.

14

Ensure raw water supply to shower is available. Ensure raw-water supply near chemical tanks for leakage observation.

15

5.

Media
Treated water

6.

Procedure: SERVICE/ EXHAUSTION:

LOOP #1:
1. 2. 3. 4. 5.

Open flange of main discharge line (from vessel) from SS main line. Start Feed water pump and open its discharge valve. Open valve#1, allow water to flow into the vessel from top and leaves the bottom. Water leaves the flange through manual opening of valve#2. Procedure is continued till cleaned water is achieved which ensures complete flushing of lines.

LOOP #2:

SERVICE/ EXHAUSTION:

1. Start Feed water pump and open its discharge valve. 2. Open valve#3, allow water to flow into the vessel from bottom and leaves the top. 3. Water leaves the tower from top and valve#4 and valve#10 is open manually and water is drained.

SOP FOR FLUSHING OF MIXED BED POLISHER

Document No: SOP/UTY Issue No : 01 Revision No : 00 Effective Date : 30-10-13 Page 5 of 5

4. Procedure is continued till cleaned water is achieved which ensures complete flushing of lines.

LOOP #3:

REGENERATION:

1. Fill the storage tank with water, open valve to allow water to flow from main storage tank to dosing tank. 2. Start dosing pumps. 3. Start Feed water pump and open its discharge valve. 4. Open valve#5 manually, allow water to flow into the vessel from bottom and leaves the top. 5. Water leaves the tower from top and valve#6 is open manually and water is drained. 6. Procedure is continued till cleaned water is achieved which ensures complete flushing of lines. 7. Open valve#7 manually, allow water to flow into the vessel from bottom and leaves the top. 8. Water leaves the tower from top and valve#6 is open manually and water is drained. 9. Procedure is continued till cleaned water is achieved which ensures complete flushing of lines.

7.

PPEs
1. 2. 3. 4. 5. 6. Safety Shoes. Safety Goggles. Safety Helmet Hand Gloves. Dust Mask. F-Key