Sie sind auf Seite 1von 23

Single Site Verification Checklist

Site ID: New Site: Swap Site: No. of E1s or IP Site Type: No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Idle Mode

Reminder Data Base Update Mapinfo Update

Frequency and Scrambling Code correctly defined Cell selection and reselection parameters are as planned The LAC/RAC is correctly defined The neighbor list and parameters are as planned LA update proceduce is checked MO-SMS and MT-SMS inside/Outside RNC MO-MMS and MT-MMS inside/Outside RNC CPICH_RSCP > -70 dBm near site CPICH_EcIo > -5 dB near site MTC & MOC for voice service inside/Outside RNC is checked The voice service quality is good by the engineer feeling MTC & MOC for VP service inside/Outside RNC is checked The VP service quality is good by the engineer feeling Emergency Call Test PS PDP activation and deactivation is checked The PS service quality is good by the engineer feeling RA update proceduce is checked R99 PS access function normal HSDPA access function normal EUL access function normal Soft handover for voice service to and from the 3G cells checked OK Soft handover for VP service to and from the 3G cells checked OK Soft handover for PS service to and from the 3G cells checked OK Intra-site Soft handover for CS, PS and VP are normal (Clockwise) Intra-site Soft handover for CS, PS and VP are normal (Counter Clockwise) Installed antenna is of the planned type Overall performance and coverage area as expected by a brief drive test Antenna Swapping Test (RTWP test) Handover for voice service from 3G cell to 2G cell checked OK Handover for PS service from 3G cell to 2G cell checked OK Cell selection from 3G cell to 2G cell and from 2G cell to 3G cell checked OK cell re-selection from 2G cell to 3G cell in idle mode is normal Cell re-selection from 2G cell to 3G cell in Packet mode (GPRS mode) is normal HO from 3G to 2G

Site Name: Site Connected to RNC: Site Expanded from: IP Site Migrated from RNC: O1 S111 S222 S1111 Activity/Process

USF0039

0039 To: To RNC: Swapped Expansion Migration Others Remarks


OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

Remarks (Further comments): Checked & Reviewed by: Name/Designation: Approved by (Customer):

Inter-RAT

Gen

Handover

PS

Connection Mode

Signature: Signature:

Date:27/07/2011 Date:

Notes: If the item is OK, mark the ' ' on the ''; If the item is not OK, mark the 'X' on the ''; If the item is not checked, mark the ' \ ' on the ''.

Reminder Data Base Update Mapinfo Update

Remarks
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

'.

UMTS Site Overall Performance and Coverage

Best Server P-SC

RSCP
Village -Al-Mishash Al-Karawein Village - Al-Badanah

CPICH Ec/Io
Village -Al-Mishash Al-Karawein Village - Al-Badanah

Village - Al-Badanah

Village - Al-Badanah

Sector A

Sector B

Sector C

Village- AlMishash Al-Karawein

Village- Al-Badanah

PS Performance Report
Sector A

Sector B

Sector C

Village -Al-Mishash Al-Karawein

Village - Al-Badanah

UMTS Site HSDPA Test


Sec A

Sec B

Sector C

Village - Al-Mishash Al-Karawein

Village - Al-Badanah

UMTS Site HSUPA Test


Sec A

Sec B

Sector C

Village Name : Al-Mishshash Al-Karawein

Village - Al-Badanah

184174329.xlsx.ms_office

Security Level:

SITE AUDIT FORM Mobily Network


Site Code GPS Co-ordinates
Physical Data

rev 1.0
23.937381 41.722928

0039 LAT LONG


A
LBX-3319DS-T0M
1 130

B
LBX-3319DS-T0M
1 190

Antenna Type Number of Antennas Bore E-Tilt M-Tilt Total Tilt Building height (Floors) Structure height/type Total Antenna Height Photo Taken (Yes/No) Comments Verified By Submitted To

90 NO

90 NO

Date Date

10/29/2013

HUAWEI Confidential

Page22of24

184174329.xlsx.ms_office

Security Level:

rev 1.0
23.937381 41.722928
C
LBX-3319DS-T0M
1

310

90

NO

27-Jul-11 27-Jul-11

10/29/2013

HUAWEI Confidential

Page23of24

Das könnte Ihnen auch gefallen