RATES OF LABOUR & MATERIALS


~~~~~~~ ~~~~~~
PLACE OF WORK :- Nellore
`````````````````````````````````````````````````````
S.S.R. :- Common S.S.R. for all Engineering Departments FOR THE YEAR 2008-200
~~~~~~~
ADD
25
--------- --------TOTAL
25
~~~~~ ~~~~~
ADD
0
-------- --------- --------CODE SS.No/LQ.
-------- --------- --------I.
~~~~~
( L-1 )
(L-43)
(L-73)
(L-76)

% For Municipal
Rs. Limits
% of Labour 0.25
Component
)
i.e (
~~~~~~
% FOR T.O.T.
0.00
------------ ---------- ------------ ------ ---------- --------ITEMS
Rate
Per
------------ ---------- ------------ ------ ---------- --------L A B O U R - RATES
~~~~~~~
Mason Ist class
206.00
1 each
Mason IInd class 188.00
1 each
Man Mazdoor
146.00
1 each
WoMan Mazdoor 146.00
1 each

MISCELLENEOUS ITEMS
~~~~~ ~~~~~~~
(M-184)
Labour for MIXING Mortor
28.00

1 CUM

(M-292)

Machine MIXING of Concrete


45.00

1 CUM

(M-291)

Vibrating Charges for 43.00


C.C.

1 CUM

(B-117)

Steel FABRICATION Charges


9.00

1 Kg.

(B-47)
(B-44)
(B-1006)

Sh.stone Flat Nosing 7.00


Sh.stone ROUNDING38.00
Labour for RCM Facia/rack
180.00

1 Rmt
1 Rmt
1 Sqm

MR
(B-943)

Labour for GLASS Fixing


40.00
Labour for wood work383.00

1 sqm
1 sqm

Earth Work & Filling :


~~~~~ ~~~~~~~~~~~~~~~~~~
(M-246)
Earth work excavation
375.00
10 CUM
SS: 20-B of S.S.R.
Mixture of gravel&soft disintigrated rock like shales,ordinary gravel,
stony earth and earth mixed with fair sized boulders.
(M-286)

Labour for Refilling EARTH


140.00

8-Lead

2 KMs Earth carting lead


106.00

(M-285)

Sand/gravel filling labour


14.00

10 CUM

1 cum
1 CUM

Centring - Scaffolding - Lift Charges


~~~~~ ~~~~~~~ ~~~~~~
(B-982) Centring for Lintel/PB
1071.00

1 cum

(B-980) Centring for Bedblocks/footing/templets


715.00

1 cum

(B-981) Centring for Pedestals

963.00

1 cum

1587.00

1 cum

(B-986) Centring for L-Beams & T-Beams


1509.00

1 cum

(B-985)

|::

"

Columns

(B-987)

"

RCC Slab (upto 1501690.00


mm th.)

10 sqm

(B-867)

"

Rcm/facia railing

102.00

1 Rmt

(B-984)

"

Sunshade any thickness


138.00

1 Sqm

(B-974)

"

Scaffolding for Brick work


48.00
at second floor1level
cum

(B-975)

"

Scaffolding for Brick work


40.00
at 1st floor level1 cum

(B-978)

"

for Plastering bet F.F&S.F


44.00

10 SQM

(B-1022)Lift charges for BM bet FF & SF


46.00

1 cum

(B-1013)

"

for R.C.C. bet F.F & 55.00


S.F

1 cum

(B-1030)

"

for Plastering bet F.F&S.F


11.00

10 sqm

II.
M A T E R I A L S - RATES
~~~~~ ~~~~~~~ ~~~~~~ ~
(M-183)Cost
of C E M E N T 220.00

1 Bag

Lead +(M-193)
Lead +(M-190)
Lead +(M-179)

"
"
"

of Tor Steel bars


41.50
of Mild Steel bars
41.50
of S A N D for Mortar
418.63

1 Kg.
1 Kg.
1 cum

Lead +(M-180)

"

of S A N D for Filling
303.63

1 cum

Lead +(M-177)

"

of GRAVEL for Filling


288.63

1 cum

Lead +(M-118)

"

Of

1 cum

Lead +(M-113
to M116)
Lead +(M-102)

"

Of 6mm-20 mm H.B.G
1328.21
(M.C) Metal

1 cum

"

of C.R.S. Stone (Granite)


0.00

1 cum

Lead +(M-100)

"

of Rough Stone (Granite)


0.00

1 cum

Lead + (B-1)

"

Bricks 2nd class(local)


3513.25

"

Impervious /Accoproof24.00
Compound

"

Rough
shabad
stone
slabs
50mm(bl
ue)

0.00

10 Sqm

Lead + (B-36)

"

Polished
shabad
stone
slab
25.4mm(
blue)

0.00

10 Sqm

(B-213)

"

of Rabbit Wire MESH


12.00

1 sqm

(B-276)

"

4mm (Plain) Glass334.00

1 sqm

(B-288)

"

4mm (Pin headed) Glass


220.00

1 sqm

(B-95)

"

Best Teak Wood

1 CUM

(B-320)

Lead + (B-34)

(B-304)
(B-305)

40 mm H.B.G Metal
908.48

75194

Shalimar putty(Iron work)


0.00
Shalimar putty(Wood work)
36.00

1000

Nos
1 Kg.

1 kg
1 kg

|::
PAINTS
~~~~~ ~~
(B-312) Cost of Synthetic Enamel 175.00
Paint
Grade - I (ISI)
(B-322)
"
of P R I M E R Paint
121.00
(wood)

1 Ltr

(B-303)

"

of French Polish (Wax)


255.00

1 Ltr

(B-327)

"

of SNOW CEM Paint


38.00

1 Kg.

"

of OIL
Bound
DISTEM
PER
(Acrylic
based)

77.00

1 Kg.

(B-300)

"

of
WATER
Bound
DISTEM
PER(dry
powder)

30.00

1 Kg.

(B-328)

"

Surya cem

7.12

1 Kg

(B-301)

1 Ltr

DATAS
~~~~~~~
PLACE OF WORK :- Nellore
~~~~~~~
Common S.S.R. for all Engineering Departments FOR THE YEAR 2008-200
~~~~~~~

1.
-->

EARTH WORK EXCAVATION :


******* ******** **********
Earth work excavation of foundation and depositing on banks in all soils
with all leads and lifts but excluding cost of blasting of rock such as
Mixture of gravel&soft disintigrated rock like shales,ordinary gravel,
stony earth and earth mixed with fair sized boulders.
UNIT:
10 cum
~~~~~~~ ~~~ ~~~~~ ~~~~~
10.00 cum
cost of excavation 375.00
10 cum
375.00
SS: 20-B and
(M-246)
SSR Item no.
~~~~~~
Add
75 % for building0.75
foundation(
)
281.25
0.00
0
0
25 % For Municipal Limits
656.25 (L)
0
164.06
~~~~~~~
--------------Total
Rs.
820.31
ADD

0 % FOR T.O.T.

0.00
Rounding off say

820.00
--------------Rate: Rs.
820.00
per
10 cum
---------- ------------ ------ ---------- --------- ---------

2a.

Rs.

FILLING ITEMS :
******** **********
Filling foundation and basement with available excavated earth
including breaking clods, watering and tamping, and complete. ....10 cum
10.00 cum

0.00

ADD

cost of refilling( M 286)


140.00

25 % For Municipal Limits


140.00 (L)
~~~~~~~
Total

10 cum

140.00

Rs.

0 % FOR T.O.T.

35.00
--------------175.00
0.00

Rounding off say

Rs.

175.00
--------------Rate: Rs.
175.00
per
10 cum
---------- ------------ ------ ---------- --------- ---------

|::
2b.

Filling of basement with carted earth with a dist of 2 KM including


cost and conveyance of earth, watering, tamping, etc., complete.
Unit:
10 cum
10.00 cum
10.00 cum

cost of earth
375.00
lead charges for 2 Kms
106.00

10 cum
1 cum

Total
ADD

375.00
1060.00

Rs.

0 % FOR T.O.T.

--------------1435.00
0.00

Rounding off say

1435.00
--------------Rate: Rs.
1435.00
per
10 cum
---------- ------------ ------ ---------- --------- --------3.

Filling the basement with gravel including cost of conveyance


of all materials, watering, tamping, etc., complete.
Unit:
1 cum
1.00 cum
cost of gravel
288.63
1 cum
1.00 cum
cost of labour for filling,
watering, tamping
14.00
1 cum
0
0
0.00
25 % For Municipal
Rs. Limits14.00 (L)
~~~~~~~
Total
ADD

Rs.

288.63
14.00

Rs.

0 % FOR T.O.T.

3.50
--------------306.13
0.00

Rounding off say

306.00
--------------Rate: Rs.
306.00
per
1 cum
---------- ------------ ------ ---------- --------- --------4.

Filling sand under foundation including cost and conveyance


charges to site from approved source, labour charges for filling
and spreading in layers, watering, ramming etc., complete.
..
1 cum
1.00 cum
cost of sand for filling303.63
1 cum
1.00 cum
cost of labour for filling
as item No. 4
14.00
1 cum
0.00
0
0
25 % For Municipal
Rs. Limits14.00 (L)
~~~~~~~
Total
ADD

Rs.

303.63
14.00

Rs.

0 % FOR T.O.T.

3.50
--------------321.13
0.00

Rounding off say

Rs.

321.00
--------------Rate: Rs.
321.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

5.

Steel Reinforcement
******* ******** **********
Providing Steel reinforcement of different diameters, cutting and bending to
required sizes and shapes placing in position with cover blocks of approved
material & size, tying firmly with M.S. binding wireforming grills for reinforcement
work as per approved design & drawing to be supplied at the time of execution
of work including cost and conveyance of deformed bars and all wastages such
as over laps, couplings, welded joints, chairs, spacer bars, binding wire, cover
blocks and all operational & incidental labour charges such as cutting, bending
placing in position, tying etc., complete for finished item of work ( payment will
be made on the basis of weight of fabricated deformed bars only )as directed
by the Department.
Unit :
1 KG
~~~~~~~ ~~~ ~~~~~
1.00 Kg
cost of steel
41.50
1 Kg
1.00 Kg
cost of fabrication
9.00
1 Kg
0.00
0
0
25 % For Municipal
Rs. Limits 9.00 (L)
~~~~~~~
Total
ADD

41.50
9.00

Rs.

0 % FOR T.O.T.

2.25
--------------52.75
0.00

Rounding off say

52.75
--------------Rate: Rs.
52.75
per
1 Kg
---------- ------------ ------ ---------- --------- --------6.
a)
1.00
9.60
1.00
0.00

CEMENT MORTARS:******** **********


Cement mortar 1:3 prop
..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

Rs.

1
1
1
1

cum
cum
bag
cum

418.63
2112.00
28.00

Rs.

7.00
--------------2565.63
---------------

Rate: Rs.
2565.63 per
1 cum
---------- ------------ ------ ---------- --------- --------b)
1.00 cum
7.20 bags
1.00 cum
0.00
0
25

Cement Mortar 1:4 prop.


..
cost of sand for mortar
418.63
cement
220.00
labour for mixing
28.00
0
% For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

418.63
1584.00
28.00

Rs.

Rate: Rs.
2037.63 per
1 cum
---------- ------------ ------ ---------- --------- ---------

7.00
--------------2037.63
---------------

c)
1.00
5.76
1.00
0.00

Cement Mortar 1:5 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

418.63
1267.20
28.00

Rs.

7.00
--------------1720.83
---------------

Rate: Rs.
1720.83 per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
d)
1.00 cum
4.80 bags
1.00 cum
0.00
0
25

Cement Mortar 1:6 prop.


..
cost of sand for mortar
418.63
cement
220.00
labour for mixing
28.00
0
% For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

418.63
1056.00
28.00

Rs.

7.00
--------------1509.63
---------------

Rate: Rs.
1509.63 per
1 cum
---------- ------------ ------ ---------- --------- --------e)
1.00 cum
3.60 bags
1.00 cum
15
13

Cement Mortar 1:8 prop.


..
cost of sand for mortar
418.63
cement
220.00
labour for mixing
28.00
% labour +
% importation
28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

418.63
792.00
28.00

Rs.

7.00
--------------1245.63
---------------

Rate: Rs.
1245.63 per
1 cum
---------- ------------ ------ ---------- --------- --------f)
1.00
2.88
1.00
0.00

Cement Mortar 1:10 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

418.63
633.60
28.00

Rs.

Rate: Rs.
1087.23 per
1 cum
---------- ------------ ------ ---------- --------- ---------

7.00
--------------1087.23
---------------

7.

Plain cement concretes******** **********


P.C.C. 1:5:10 Prop. using 40mm HBG metal including all materials,
labour, charges, tamping, curing, etc., complete.
..
1 cum
0.92 cum
cost of 40mm metal 908.48
1 cum
0.46 cum
cost of sand
418.63
1 cum
2.65 bags cement
220.00
1 bag
0.06 Mason 1st class
206.00
1 day
0.14 Mason 2nd class
188.00
1 day
1.80 Man
mazdoor
146.00
1 day
1.40 Womanmazdoor
146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
505.88 (L)
~~~~~~~
Total
Rs.
ADD

0 % FOR T.O.T.

835.80
192.57
583.00
12.36
26.32
262.80
204.40
126.47
--------------2243.72
0.00

Rounding off say

2244.00
--------------Rate: Rs.
2244.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
8.

Rs.

P.C.C. 1:4:8 Prop. using 40mm HBG metal including all materials,
labour, charges, tamping, curing, etc., complete.
..
1 cum
0.92 cum
cost of 40mm metal 908.48
1 cum
0.46 cum
cost of sand
418.63
1 cum
3.31 bags cement
220.00
1 bag
0.06 Mason 1st class
206.00
1 day
0.14 Mason 2nd class
188.00
1 day
1.80 Man
mazdoor
146.00
1 day
1.40 Womanmazdoor
146.00
1 day
0
25 % For Municipal Limits
505.88 (L)
~~~~~~~
Total
Rs.
ADD

0 % FOR T.O.T.

835.80
192.57
728.20
12.36
26.32
262.80
204.40
126.47
--------------2388.92
0.00

Rounding off say

Rs.

2389.00
--------------Rate: Rs.
2389.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

9.

P.C.C. 1:3:6 prop. using 40mm HBG metal


unit
..
0.92 cum
cost of 40mm metal 908.48
0.46 cum
cost of sand
418.63
4.42 bags cement
220.00
0.06 Mason 1st class
206.00
0.14 Mason 2nd class
188.00
1.80 Man
mazdoor
146.00
1.40 Womanmazdoor
146.00
0.00
0
0
25 % For Municipal Limits
505.88 (L)
~~~~~~~
Total
ADD

1
1
1
1
1
1
1
1

cum
cum
cum
bag
day
day
day
day

835.80
192.57
972.40
12.36
26.32
262.80
204.40

Rs.

0 % FOR T.O.T.

126.47
--------------2633.12
0.00

Rounding off say

Rs.

2633.00
--------------Rate: Rs.
2633.00
per
1 cum
---------- ------------ ------ ---------- --------- --------|::
10 P.C.C. 1:2:4 prop. using 20mm to 6mm size HBG machine mixing,
laying, curing, etc., complete
unit
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
6.62 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing
45.00
1 cum
0.12 Nos. Mason 1st class
206.00
1 each
0.28 Nos. Mason 2nd class
188.00
1 each
2.10 Nos. Mam mazdoor
146.00
1 each
3.50 Nos. Woman mazdoor 146.00
1 each
0.00
0
0
25 % For Municipal
Rs. Limits
894.96 (L)
Total
ADD

Rs.

0 % FOR T.O.T.

1221.95
192.57
1456.40
45.00
24.72
52.64
306.60
511.00
223.74
--------------4034.62
0.00

Rounding off say

Rs.

4035.00
--------------Rate: Rs.
4035.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

11a. P.C.C. 1:1 1/2:3 prop. using 3/4" to 1/4" size HBG machine mixing
curing etc., complete.
unit
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
8.84 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing
45.00
1 cum
0.12 Nos. Mason 1st class
206.00
1 each
0.28 Nos. Mason 2nd class
188.00
1 each
2.10 Nos. Mam mazdoor
146.00
1 each
3.50 Nos. Woman mazdoor 146.00
1 each
0.00
0
0
25 % For Municipal
Rs. Limits
894.96 (L)
~~~~~~~
Total
Rs.
ADD

0 % FOR T.O.T.

1221.95
192.57
1944.80
45.00
24.72
52.64
306.60
511.00
223.74
--------------4523.02
0.00

Rounding off say

Rs.

4523.00
--------------Rate: Rs.
4523.00
per
1 cum
---------- ------------ ------ ---------- --------- --------|::
12 P.C.C. 1:3:6 Prop. using 20mm to 6mm size HBG metal mahine
mixing, curing, etc., complete.
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
4.41 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing
45.00
1 cum
0.12 Nos. Mason 1st class
206.00
1 each
0.28 Nos. Mason 2nd class
188.00
1 each
2.10 Nos. Mam mazdoor
146.00
1 each
3.50 Nos. Woman mazdoor 146.00
1 each
0
0
0
25 % For Municipal Limits
894.96 (L)
~~~~~~~
Total
ADD

1221.95
192.57
970.20
45.00
24.72
52.64
306.60
511.00

Rs.

0 % FOR T.O.T.

223.74
--------------3548.42
0.00

Rounding off say

Rs.

3548.00
--------------Rate: Rs.
3548.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

13
1.10
0.34
0.54
1.26
1.40
1.40
0.00

Randum Rubble Masonry:******** **********


R.R. Masonry in C.M.
unit1:8 prop.
..
cum
cost of rough stone
0.00
cum
cost of C.M. 1:8 prop.
1245.63
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Nos. Man mazdoor
146.00
Nos. Woman mazdoor 146.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

ADD

1
1
1
1
1
1
1

cum
cum
cum
each
each
each
each

0.00
423.51
111.24
236.88
204.40
204.40

Rs.

0 % FOR T.O.T.

189.23
--------------1369.66
0.00

Rounding off say

1370.00
--------------Rate: Rs.
1370.00
per
1 cum
---------- ------------ ------ ---------- --------- --------14
1.10
0.34
0.54
1.26
1.40
1.40
0.00

ADD

R.R. Masonry in C.M.


unit1:6 prop.
..
cost of rough stone
0.00
cost of C.M. 1:6 prop.
1509.63
Mason 1st class
206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Woman mazdoor 146.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

cum
cum
Nos.
Nos.
Nos.
Nos.

Rs.

1
1
1
1
1
1
1

cum
cum
cum
each
each
each
each

0.00
513.27
111.24
236.88
204.40
204.40

Rs.

0 % FOR T.O.T.

189.23
--------------1459.42
0.00

Rounding off say

Rs.

1459.00
--------------Rate: Rs.
1459.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
15
1.10
0.34
0.54
1.26
1.40
1.40
0.00

ADD

R.R. Masonry in C.M.


unit1:5 prop.
..
cost of rough stone
0.00
cost of C.M. 1:5 prop.
1720.83
Mason 1st class
206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Woman mazdoor 146.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

cum
cum
Nos.
Nos.
Nos.
Nos.

1
1
1
1
1
1
1

1.10
0.34
0.54
1.26
1.40
1.40
0.00

ADD

1.10
0.34
0.54
1.26
1.40
1.40
0.00

ADD

Rs.

189.23
--------------1531.23
0.00

Rate: Rs.
1531 /---------- ------------ ------ ---------R.R. Masonry in C.M.
unit1:4 prop.
..
1
cum
cost of rough stone
0.00
1
cum
cost of C.M. 1:4 prop.
2037.63
1
Nos. Mason 1st class
206.00
1
Nos. Mason 2nd class
188.00
1
Nos. Man mazdoor
146.00
1
Nos. Woman mazdoor 146.00
1
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

Rs.

1531.00
--------------per
1 cum
--------- --------cum
cum
0.00
cum
692.79
each
111.24
each
236.88
each
204.40
each
204.40

Rs.

0 % FOR T.O.T.

189.23
--------------1638.94
0.00

Rounding off say

17

0.00
585.08
111.24
236.88
204.40
204.40

0 % FOR T.O.T.
Rounding off say

16

cum
cum
cum
each
each
each
each

Rate: Rs.
1639 /---------- ------------ ------ ---------R.R. Masonry in C.M.
unit1:3 prop.
..
1
cum
cost of rough stone
0.00
1
cum
cost of C.M. 1:3 prop.
2565.63
1
Nos. Mason 1st class
206.00
1
Nos. Mason 2nd class
188.00
1
Nos. Man mazdoor
146.00
1
Nos. Woman mazdoor 146.00
1
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

Rs.

1639.00
--------------per
1 cum
--------- --------cum
cum
0.00
cum
872.31
each
111.24
each
236.88
each
204.40
each
204.40

Rs.

0 % FOR T.O.T.

189.23
--------------1818.46
0.00

Rounding off say

Rs.

1818.00
--------------Rate: Rs.
1818 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

Coursed Rubble Masonry:******** **********


18 C.R.S. Masonry in C.M. 1:8 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:8 prop.
1245.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor 146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

0.00
0.00
398.60
154.50
329.00
204.40
204.40

Rs.

0 % FOR T.O.T.

223.08
--------------1513.98
0.00

Rounding off say

1514.00
--------------Rate: Rs.
0 /per
1 cum
---------- ------------ ------ ---------- --------- --------19 C.R.S. Masonry in C.M. 1:6 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:6 prop.
1509.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor 146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

Rs.

0.00
0.00
483.08
154.50
329.00
204.40
204.40

Rs.

0 % FOR T.O.T.

223.08
--------------1598.46
0.00

Rounding off say

Rs.

1598.00
--------------Rate: Rs.
0 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
20 C.R.S. Masonry in C.M. 1:5 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:5 prop.
1720.83
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor 146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

0.00
0.00
550.67
154.50
329.00
204.40
204.40
223.08
--------------1666.04

0 % FOR T.O.T.

0.00
Rounding off say

1666.00
--------------Rate: Rs.
0 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

21 C.R.S. Masonry in C.M. 1:4 prop. 2nd sort including cost of


all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:4 prop.
2037.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor 146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

0.00
0.00
652.04
154.50
329.00
204.40
204.40

Rs.

0 % FOR T.O.T.

223.08
--------------1767.42
0.00

Rounding off say

Rs.

1767.00
--------------Rate: Rs.
0 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

22 C.R.S. Masonry in C.M. 1:3 prop. 2nd sort including cost of


all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:3 prop.
2565.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor 146.00
1 day
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD
0 % FOR T.O.T.
Rounding off say

Rs.

0.00
0.00
821.00
154.50
329.00
204.40
204.40
223.08
--------------1936.38
0.00

Rs.

1936.00
--------------Rate: Rs.
0 /per
1 cum
---------- ------------ ------ ---------- --------- --------|::

Brick Masonry using 2nd class Bricks


******** ********** *********
23 Brick masonry in C.M. 1:3 prop. with 2nd class bricks including cost &
conveyance of materials, labour, scaffolding, during, etc., complete.
(ground floor)
unit
..
1 cum
~~~~~~~~~~~~~
512 Nos. cost of 2nd class bricks
3513.25
Nos
1000
0.20 cum
cost of C.M. 1:3 prop.
2565.63
1 cum
0.42 nos.
Mason 1st class
206.00
1 each
0.98 nos.
Mason 2nd class
188.00
1 each
0.70 Nos. Man mazdoor
146.00
1 day
2.10 Nos. Woman mazdoor 146.00
1 day
0.00

ADD

0
0
25 % For Municipal
Rs. Limits
679.56 (L)
~~~~~~~
Total

Rs.

0 % FOR T.O.T.

1798.78
513.13
86.52
184.24
102.20
306.60

169.89
--------------3161.36
0.00

Rounding off say

Rs.

3161.00
--------------Rate: Rs.
3161.00 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

a)

Brick masonry in C.M. 1:3 prop.


unit
...
(First floor)
~~~~~~~~~~~~~
1.00 cum
Brick masonry in C.M. 1:3 prop.
@ G.Floor Rate 3161.36
1.00 cum
lift charges to F.F.
46.00
1.00 cum
cost of scaffolding charges
40.00
0.00
25 % For Municipal Limits46.00
~~~~~~~
Total
ADD

1 cum

1 cum
1 cum
1 cum

3161.36
46.00
40.00
11.50
Rs.

0 % FOR T.O.T.

3258.86
0.00

Rounding off say

Rs.

3259.00
--------------Rate: Rs.
3259 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
24 Brick masonry in C.M. 1:4 prop. with 2nd class bricks including cost &
conveyance of materials, labour, scaffolding, during, etc., complete.
(ground floor)
unit
..
1 cum
~~~~~~~~~~~~~
512 Nos. cost of 2nd class bricks
3513.25
Nos
1000
0.20 cum
cost of C.M. 1:4 prop.
2037.63
1 cum
0.42 nos.
Mason 1st class
206.00
1 each
0.98 nos.
Mason 2nd class
188.00
1 each
0.70 Nos. Man mazdoor
146.00
1 day
2.10 Nos. Woman mazdoor 146.00
1 day
0.00

ADD

0
0
25 % For Municipal
Rs. Limits
679.56 (L)
~~~~~~~
Total

Rs.

0 % FOR T.O.T.

1798.78
407.53
86.52
184.24
102.20
306.60

169.89
--------------3055.76
0.00

Rounding off say

Rs.

3056.00
--------------Rate: Rs.
3056 /per
1 cum
---------- ------------ ------ ---------- --------- ---------

a)

Brick masonry in C.M. 1:4 prop.


unit
...
(First floor)
~~~~~~~~~~~~~
1.00 cum
Brick masonry in C.M.
3055.76
1:4 prop.
1.00 cum
Lift charges to First floor
46.00
1.00 cum
Scafolding charges F.F.
40.00

ADD

25 a)

3055.76
46.00
40.00
--------------3141.76
25 % For Municipal Limits 46
11.50
0 % FOR T.O.T.
0.00
3153.26
Rounding off say
Rs.
3153.00
--------------Rate: Rs.
3153.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

Brick Masonry in C.M. 1:5 Prop.


(Ground floor)
unit
...
~~~~~~~~~~~~~
512 nos
Cost of bricks
3513.25
0.2 cum
c.m 1:5 pro
1720.83
1 cum
Labour charges as item
849.45
no24

ADD

1 cum

1 cum
1 cum
1 cum

1 cum
1000 nos
1 cum
1 cum

1798.78
344.17
849.45
____________
2992.40

0 % FOR T.O.T.

0.00
Rounding off say

2992.00
--------------Rate: Rs.
2992.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

|::
b)

Brick Masonry in C.M. 1:5 Prop.


(First floor)
unit
...
~~~~~~~~~~~~~
1 cum
Rate of ground floor2992.40
1 cum
Lift charges to F.F
46.00
1 cum
Scofolding charges to F.f
40.00
25 % For Municipal Limits
ADD

46

Rs.

1 cum
1 cum
1 cum
1 cum

2992.40
46.00
40.00

11.50
3089.90
0 % FOR T.O.T.
0.00
3089.90
Rounding off say
Rs.
3090.00
--------------Rate: Rs.
3090.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

26 a)

Brick Masonry in C.M. 1:6 Prop.


(Ground floor)
unit
...
~~~~~~~~~~~~~
512 nos
Bricks
3513.25
0.2 Cum
1 cum

C.M 1:6 Pro


1509.63
Labour charges as item
849.45

1 cum
1000 nos

1798.78

1 cum
1 Cum

301.93
849.45
--------------2950.16

ADD

0 % FOR T.O.T.

0.00
Rounding off say

2950.00
--------------Rate: Rs.
2950.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

b)

Brick Masonry in C.M. 1:6 Prop.


(First floor)
unit
...
~~~~~~~~~~~~~
1 cum
Rate of ground floor2950.16
1 cum
Lift charges to First floor
46.00
1 cum
scofolding charges to first
40.00
floor
25 % For Municipal Limits46.00

Rs.

1 cum
1 cum
1 cum
1 cum

2950.16
46.00
40.00
11.50
3047.66
ADD
0 % FOR T.O.T.
0.00
Rounding off say
Rs.
3048.00
--------------Rate: Rs.
3048.00
per
1 cum
---------- ------------ ------ ---------- --------- --------27 a)
Brick Masonry in C.M. 1:8 Prop.
(Ground floor)
unit
...
1 cum
~~~~~~~~~~~~~
512 nos
cost of bricks
3513.25
1000 nos
1798.78
0.2 cum
cost of C:M 1:8 pro 1245.63
1 cum
249.13
1 cum
labour charges as above
849.45
1 cum
849.45
--------------2897.36
ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

2897.00
--------------Rate: Rs.
2897.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

b)

Brick Masonry in C.M. 1:8 Prop.


(First floor)
unit
...
~~~~~~~~~~~~~
1 cum
rate of ground floor 2897.36
1 cum
lift charges to F.F
46.00
1 cum
scofolding charges
40.00

ADD

28 a)

1 cum
1 cum
1 cum
1 cum

2897.36
46.00
40.00
--------------2983.36
25 % For Municipal Limits46.00
11.50
0 % FOR T.O.T.
0.00
2994.86
Rounding off say
Rs.
2995.00
--------------Rate: Rs.
2995.00
per
1 cum
---------- ------------ ------ ---------- --------- ---------

R.B.M. walls in C.M. 1:3 Prop. using 2nd


class bricks and 2 nos 6 mm M.S.
rods for every 3rd layer including
labour etc complete
(Ground floor)4.5" thick
unit
..
1sqm
~~~~~~~~~~~~~
0.114 cum
brick masonry in c.m.
3161.36
1:3
1 cum
1.85 kgs
cost of steel
41.50
1 Kg.
sundries

360.40
76.78
--------------437.17

ADD

0 % FOR T.O.T.

0.00
Rounding off say

437.00
--------------Rate: Rs.
437.00
per
1 sqm
---------- ------------ ------ ---------- --------- --------b)
0.114 cum
1.85 kgs

(First Floor)
~~~~~~~~~~~~~
brick masonry in CM
3258.86
1:3 prop.F.F
of steel
41.50
Add sundries

Rs.

1 cum
1 kg

371.51
76.78
--------------448.29

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

448.00
--------------Rate: Rs.
448.00
per
1 sqm
---------- ------------ ------ ---------- --------- ---------

|::
29 a)

R.B.M. Walls in c.m. 1:4 prop. using 2nd


class bricks and 2 nos.
unit 6 mm...M.S.
rods @ every 3rd layer including
labour charges etc. complete
(Ground floor)
~~~~~~~~~~~~~
0.114 cum
brick masonry in CM
3055.76
1:4 Prop.
1.85 kgs
steel
41.50
sundries

1 sqm

1 cum
1 kg

348.36
76.78
--------------425.13

ADD

0 % FOR T.O.T.

0.00
Rounding off say

b)

425.00
--------------Rate: Rs.
425.00
per
1 sqm
---------- ------------ ------ ---------- --------- --------R.B.M. walls in C.M. 1:4 Prop.
unit
...
1 sqm
(First floor)
~~~~~~~~~~~~~
0.114 cum
Brick masonry in cm3141.76
1:4 prop F.F.
1 cum
358.16
1.85 kg
steel
41.50
1 kg
76.78
Add sundries
--------------434.94
ADD

Rs.

0 % FOR T.O.T.

0.00
Rounding off say

30 a)

0.15
0.33
0.77
0.5
1.1

ADD

Rs.

435.00
--------------Rate: Rs.
435.00
per
1 sqm
---------- ------------ ------ ---------- --------- --------Plastering 12 mm thick with cement Mortors
~~~~~~~
Plastering 12 mm thick in C.M.
unit 1:3 prop.
...
10 sqm
(Ground floor)
~~~~~~~~~~~~~
cum
C.M. 1:3 Prop.
2565.63
1 cum
384.84
Nos. Mason 1st class
206.00
1 no
67.98
Nos. Mason 2nd class
188.00
1 no
144.76
Man
Mazdor
146.00
1 no
73.00
Woman Mazdor
146.00
1 no
160.60
0
0
25 % For Municipal Limits
446.34
111.59
sundries
--------------943
942.77 / 10 SqM
0 % FOR T.O.T.

0.00
Rounding off say

Rate: Rs.

943.00

Rs.
per

943.00
--------------10 SQM

|::
b)

(First floor)
unit
...
10
~~~~~~~~~~~~~
10 sqm
Plastering in C.M. 1:3942.77
prop. 12 mm
10
10 sqm
scofolding charges between
44.00 F.F. & S.F. 10
10 sqm
lift charges
11.00
10
25 % For Municipal Limits11.00

ADD

sqm
sqm
sqm
sqm

942.77
44.00
11.00
2.75
997.77 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

998.00
--------------Rate: Rs.
998.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------31 a)
0.15 cum
10 sqm

Rs.

Plastering 12mm thick in C.M. 1:4 prop


(Ground floor)
unit
...
10 sqm
C.M. 1:4 prop
2037.63
1 cum
Labour as item No.30557.93
above
10 sqm
sundries L.S.

305.64
557.93
--------------863.57 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

864.00
--------------Rate: Rs.
864.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

b)

Plastering 12 mm thick in C.M. 1:4


prop (First floor) unit
...
~~~~~~~~~~~~~
10 sqm
Ground floor rate
863.57
10 sqm
scofolding & lift charges
55.00
25 % For Municipal Limits11.00

Rs.

10 sqm
10 sqm
10 sqm
2.75

863.57
55.00
921.32 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

921.00
--------------Rate: Rs.
921.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

32 a)

0.15 cum
10 sqm

Plastering 12mm in C.M. 1:5 Porp


(Ground floor)
unit
...
~~~~~~~~~~~~~
C.M. 1:5 Prop
1720.83
Labour charges as per
557.93
item no.
above

10 sqm
1 cum
10 sqm

258.12
557.93

--------------816.05 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

816.00
--------------Rate: Rs.
816.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no 32
816.05
a
10 sqm
Lift charges+scofolding
55.00
charges
25 % For Municipal Limits11.00

Rs.

10 sqm
10 sqm
10 sqm
2.75

816.05
55.00
873.80 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

874.00
--------------Rate: Rs.
874.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------33 a)

0.15 cum
10 sqm

Rs.

Plastering 12mm thick


unit in C.M....1:6 Prop.10 sqm
(Ground floor)
~~~~~~~~~~~~~
C.M. 1:6 Prop.
1509.63
1 cum
Labour charges as per
557.93
item No.
10 sqm
above

226.44
557.93

--------------784.37 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

784.00
--------------Rate: Rs.
784.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

b)

(First floor)
unit
..
~~~~~~~~~~~~~
10 sqm
Rate as per item
above
784.37
10 sqm
lift charges + scofolding
55.00
charges
25 % For Municipal Limits 11

10 Sqm
10 sqm
10 sqm
2.75

784.37
55.00
842.12 / 10 SqM

.
ADD

0 % FOR T.O.T.

0.00
Rounding off say

842.00
--------------Rate: Rs.
842.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------34 a)

0.15 cum
10 sqm

Rs.

Plastering 12 mm thick in C.M. 1:8 prop


(Ground floor)
unit
...
10 sqm
~~~~~~~~~~~~~
C.M. 1:8 prop
1245.63
1 cum
labour charges as per
557.93
item no.
10 sqm

186.84
557.93
--------------744.77 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

745.00
--------------Rate: Rs.
745.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no. 744.77
above
10 sqm
lift charges + scofolding
55.00
charges
25 % For Municipal Limits 11

Rs.

10 sqm
10 sqm
10 sqm
2.75

744.77
55.00
--------------802.52 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

803.00
--------------Rate: Rs.
803.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

35 a)

0.11
0.3
0.7
0.5
1

0.04
0.33
0.77
0.50
1.10

Plastering 12 mm thick in cm 1:5


Prop. 3/8" thick as base, coat and in
C.M. 1:3 prop. 1/8" unit
thick as top
....coat
with dubara sponge finishing etc.
(Ground floor)
~~~~~~~~~~~~~
cum
cost of C.M. 1:5 Prop
1720.83
Mason 1st class
206.00
Mason 2nd class
188.00
Man
Mazdor
146.00
Woman Mazdor
146.00
Top coat 1/8" thick in c.m 1:3 prop
cum
c.m 1:3
2565.63
nos
Mason 1st
206.00
nos
Mason 2nd
188.00
nos
M.m
146.00
nos
W.m
146.00
0
0 961.37 858.74
25 % For Municipal Limits

10 sqm

1
1
1
1
1

cum
each
each
day
day

189.29
61.80
131.60
73.00
146.00

1
1
1
1
1

cum
no
no
no
no

102.63
67.98
144.76
73.00
160.60
214.69
--------------1365.34 / 10 SqM

ADD

36 a)

0.21
0.66
1.54
0.50
3.2

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1365.00
--------------Rate: Rs.
1365.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Plastering in cement Mortor 20 mm
thick (Ground floor)
Plastering 20 mm thick
unit in C.M.
...
10 sqm
1:3 Prop
~~~~~~~~~~~~~
cum
C.M. 1:3 prop
2565.63
1 cum
538.78
Nos. Mason 1st class
206.00
1 each
135.96
Nos. Mason 2nd class
188.00
1 each
289.52
Nos. Man Mazdor
146.00
1 day
73.00
Nos. Woman Mazdor
146.00
1 day
467.20
0
0
965.68
241.42
25 % For Municipal Limits
--------------1745.88 / 10 SqM
0 % FOR T.O.T.
0.00
Rounding off say

Rs.

1746.00
--------------Rate: Rs.
1746.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no. G.F.
10 sqm
Scofolding charges
10 sqm
LIft charges
0
0
25 % For Municipal Limits

ADD

10 sqm
1745.88
44.00
11.00
2.75
___________
1803.63 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

1804.00
--------------Rate: Rs.
1804.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

37 a)

0.21 cum
10 sqm

Plastering in C.M.1:4
unitprop. 20...mm
thick Ground Floor
~~~~~~~~~~~~~
C.M. 1:4 prop.
2037.63
Labour as item no. 1207.10
above

Rs.

10 sqm

1 cum
10 sqm

427.90
1207.10
__________
1635.00 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

1635.00
--------------Rate: Rs.
1635.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per G.F.
10 sqm
Scofolding + lift charges
0
0
25 % For Municipal Limits 11

ADD

Rs.

10 sqm
1635.00
55.00
0.00
2.75
1692.75 / 10 SqM

2.75

0 % FOR T.O.T.

0.00
_____________

Rounding off say

Rs.

1693.00
--------------Rate: Rs.
1693.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
38 a)

0.21 cum
10 sqm

Plastering 20 mm thic in C.M. 1:5 prop.


(Ground floor)
unit
...
10 sqm
~~~~~~~~~~~~~
C.M/ 1:5 prop
1720.83
1 cum
labour charges as per
1207.10
item no. above 10 sqm

361.37
1207.10
--------------1568.47 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

1568.00
--------------Rate: Rs.
1568.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

(First floor)
unit
....
~~~~~~~~~~~~~
10 sqm
Rate as per item no. G.F.
10 sqm
Scofolding + Lift charges
0
0
25 % For Municipal Limits

ADD

Rs.

10 sqm
1568.47
55.00
0.00
2.75
1623.47 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

1623.00
--------------Rate: Rs.
1623.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

39 a)

0.21 cum
10 sqm

Plastering 20 mm thick in C.M. 1:6


prop (Ground floor)unit
...
~~~~~~~~~~~~~
C.M. 1:6 prop
1509.63
Labour charges as per
1207.10
item no.

Rs.

10 sqm
1 cum
10 sqm

317.02
1207.10
--------------1524.12 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1524.00
--------------Rate: Rs.
1524.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate of ground floor as per item no.
10 sqm
scofolding charges + lift charges
0
0
25 % For Municipal Limits

ADD

10 sqm
1524.12
55.00
0.00
2.75
1579.12 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

1579.00
--------------Rate: Rs.
1579.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
40 a)

0.21 cum
10 sqm

Plastering 20 mm thick
unit in C.M.
... 1:8
prop (Ground floor)
~~~~~~~~~~~~~
C.M. 1:8 prop
1245.63
Labour charges as per
1207.10
item No.

Rs.

10 sqm

1 cum
10 sqm

261.58
1207.10
--------------1468.68 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

1469.00
--------------Rate: Rs.
1469.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

Rs.

Plastering 20 mm thick in C.M. 1:8 prop


First floor
unit
..
10 Sqm
~~~~~~~~~~~~~
10 sqm
Rate of ground floor
10 sqm
scofolding + lift charges
0
0
25 % For Municipal Limits

ADD

1468.68
55.00
0.00
2.75
1523.68 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1524.00
--------------Rate: Rs.
1524.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

41 a)

0.17
0.3
0.7
0.5
1.8

0.04
0.33
0.77
0.5
1.1

ADD

|::
b)

Plastering 20mm thick in


C.M. 1:5 Prop. 16mm thick
and 1:3 prop.4mm unit
thick as ...
10
top coat dubara sponge
finish etc. (Ground floor)
~~~~~~~~~~~~~
Base coat 16mm thick in C.M. 1:5 Prop.
~~~~~~~~~~~~~
cum
C.M. 1:5 prop.
1720.83
1
Mason 1st class
206.00
1
Mason 2nd class
188.00
1
Man
Mazdoor
146.00
1
WomanMazdoor
146.00
1

Top coat 4mm thick in C.M.


1:3 prop.
~~~~~~~~~~~~~
cum
C.M. 1:3 Prop.
2565.63
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Man
Mazdoor
146.00
Nos. Women Mazdoor 146.00
0
0 1078.2 975.54
25 % For Municipal Limits

cum
each
each
day
day

292.54
61.80
131.60
73.00
262.80

cum
each
each
day
day

102.63
67.98
144.76
73.00
160.60
243.89

--------------1614.59 / 10 SqM
0 % FOR T.O.T.
0.00
Rounding off say
Rs.
1615.00
--------------Rate: Rs.
1615.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item above
10 sqm
Scofolding charges 44.00
10 sqm
Lift charges
11.00
25 % For Municipal Limits

ADD

1
1
1
1
1

sqm

10 Sqm
1614.59
44.00
11.00
2.75
__________
1672.34 / 10 SqM

10 sqm
10 sqm

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1672.00
--------------Rate: Rs.
1672.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

42 a)

10 sqm
2 kgs.

ADD

Impervious coat 20mm thick


in C.M. 1:3 prop. with 1 kg
acco pro compoundunit
per bag ...
of cement and laid when the
slab is green including fine
rendering thread lining etc.
(Ground floor)
~~~~~~~~~~~~~
cost of 20mm thick plastering
in C.M. 1:3 prop as per
item no.
1745.88
impermo compound 24.00

10 sqm

10 sqm
1 kg

1745.88
48.00
--------------1793.88 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

1794.00
--------------Rate: Rs.
1794.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

(First floor)
~~~~~~~~~~~~~
10 sqm
cost of 20mm thick plastering
in C.M. 1:3 prop. first floor
item no.
lift charges
11.00
25 % For Municipal Limits11.00

Rs.

1803.63
10 sqm
2.75

Rs.

11.00
1817.38 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1817.00
--------------Rate: Rs.
1817.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
43

Flush pointing to R.R. Masonry in


C.M. 1:3 prop.
unit
...
0.09
0.48
1.12
0.50
1.80

cum
Nos.
Nos.
nos
nos

C.M. 1:3 prop


2565.63
Mason 1st class
206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Women mazdoor 146.00
0
0
645.24
25 % For Municipal Limits

10 Sqm
1
1
1
1
1

cum
each
each
day
day

230.91
98.88
210.56
73.00
262.80
161.31
--------------1037.46 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

1037.00
--------------Rate: Rs.
1037.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------44

Rs.

Flush Pointing R.R. Masonry


unitin C.M. ...
1:4 Prop. 10 sqm
0.09 cum
10.00 sqm

C.M. 1:4 Prop.


2037.63
Labour as per item no.
806.55
above

1 cum
10 sqm

183.39
806.55

--------------989.94 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

990.00
--------------Rate: Rs.
0.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------flush Pointing CRS Masonry
unit
in C.M. 1:3
... Prop. 10 Sqm

45

0.06 cum
10 sqm

ADD

cost of C.M. 1:3 prop.


2565.63
Labour charges as per item
no. above
806.55

Rs.

1 cum

153.94
806.55
--------------960.49 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

960.00
--------------Rate: Rs.
960.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
46

Flush Pointing to CRS Masonry in C.M. 1:4unit


Prop

0.06 cum
10 sqm

...

C.M. 1:4 Prop


2037.63
Labour charges as per item
no. above
806.55

10 Sqm
1 cum

122.26
806.55
--------------928.81 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

929.00
--------------Rate: Rs.
0.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

47

Rs.

Raised pointing to CRS Masonry in C.M. 1:3 Prop.


unit
...
10 Sqm
10 sqm
cost of painting as per
item no. above
1.10 Nos. Mason 2nd class
188.00
1 each
0
0 on
206.80
25 % For Municipal Limits

960.49
206.80
51.70
1218.99 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

1219.00
--------------Rate: Rs.
0.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------48

Rs.

Pointingto Rough shabad flooring in C.M. 1:3 Prop


unit
...
10 Sqm
0.02 cum
C.M. 1:3 Prop.
2565.63
1 cum
Labour as per item above
Sundries

51.31
806.55
--------------857.86 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

858.00
--------------Rate: Rs.
754.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

49

Pointing to rough shabad flooring in C.M. 1:4 prop


unit
...
10 Sqm
0.02 cum
C.M. 1:4 prop.
2037.63
1 cum
Labour chages as per item
no. above
Sundries

40.75
806.55
--------------847.30 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

847.00
--------------Rate: Rs.
743.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
50
0.58
0.5
1.1
0.5
1.8

Pointing to polished shabad flooring with cement putty


unit
...
10 Sqm
bags
220.00
1 bag
Nos. Mason 1st class
206.00
1 each
Nos. Mason 2nd class
188.00
1 each
Nos. Man Mazdoor
146.00
1 day
Nos. Woman Mazdoor 146.00
1 day
0
0 on
645.6
25 % For Municipal Limits

127.60
103.00
206.80
73.00
262.80
161.40
--------------934.60 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

935.00
--------------Rate: Rs.
935.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------51

Rs.

P.C.C. 1:2:4 prop. 2" thick flooring using 3/4"


to 1/4" greage metal machine crushed including
1/2" thick plastering in C.M. 1:3 prop. including
fine rendering, thread lining etc. complete
unit
...
10 Sqm
C.C. 1:2:4 prop. as per
0.38 cum
item no. above
4034.62
1 cum
10 sqm
Plastering 1:3 prop 12mm
thick as per item no 942.77
10 sqm
Rounding

1533.16
942.77
--------------2475.93 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

2476.00
--------------Rate: Rs.
2476.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

52

Flooring with rough shabad stone 1.5"


thick (38.1 mm) blue tandur set over
3/4" thick bed mortor 1:6 prop. and
pointing to slabs inunit
CM1:3 prop
...
10 Sqm
10.5 sqm
0.12
0.02
10
0.96
2.24
2.2
1.1

cost of 1/5" thick shabad


807.80
stone Tandur Blue
cum
C.M. 1:6 prop
1509.63
sqm
Pointing in C.M. 1:32565.63
prop.
as per item no.
labour charges for pointing
645.24
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Nos. Man Mazdoor
146.00
Nos. Woman Mazdoor 146.00
0
0 on
1100.68
25 % For Municipal Limits

ADD

10 sqm

848.19

1 cum
1 cum

181.16
51.31

10
1
1
1
1

Sqm
each
each
each
each

645.24
197.76
421.12
321.20
160.60
275.17
--------------3101.75 / 10 SqM
0.00

0 % FOR T.O.T.
Rounding off say

Rs.

3102.00
--------------Rate: Rs.
3102.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
53

Flooring with rough shabad stone 1.5" ( 1 1/2" )


thick Tandur Blue or 3/4" bed mortor
in C.M. 1:8 prop. and pointing in C.M.
1:3 prop.etc. complete
unit
...
10 Sqm
10.5 sqm
0.21 cum
10 sqm
0.02 CUM
10

cost of stone
0.00
C.M. 1:8 prop
1245.63
Labour for 10 sqm as
1375.85
per
item no. above
Pointing 10 sqm in C.M.
2565.63
1:3
prop.
labour charges for pointing
645.24
Sundries

10 sqm
1 cum
10 sqm

0.00
261.58
1375.85

1 cum

51.31

10 Sqm

645.24
--------------2333.98 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

2334.00
--------------Rate: Rs.
2334.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

54

Flooring with polished shabad stone


(Tandur Blue) 1" thick or 3/4"
thick mortor in C.M. 1:6 Prop. and
Pointing slabs with putty etc.
complete
unit
...
10.10 Sqm
0.12 cum
15 kgs
0.05 cum

10 sqm

Cost of stone
0.00
cost of bed mortor 1:6
Prop. 3/4" thick
1509.63
cost of cement
220.00
CM1:3 pointing
2565.63
Labour charges for cutting
and laying as per item
No.49 above
1375.85
Add sundries

10 Sqm
10 Sqm

0.00

1 cum
50 kgs
1 cum

181.16
66.00
128.28

10 sqm

1375.85
--------------1751.29 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1751.00
--------------Rate: Rs.
1751.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
55

10.10
0.12
15
0.05
10

Flooring with polished shabad stone 1"


thick Tandur blue 3/4" thick bed Mortor
1:8 Prop. and Pointing withunit
cement ...
etc. complete
Sqm cost of stone
0.00
cum
bed mortar 1:8 Prop.
1245.63
3/4"
kgs
cement
220.00
cum
pointing with cement
2565.63
putty
(as item 47 above)
sqm
labour as per item No.51
1375.85
above
Add sundries L.S.

10 Sqm
10
1
50
1

sqm
cum
kgs
cum

0.00
149.48
66.00
128.28

10 sqm

1375.85

--------------1719.61 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1720.00
--------------Rate: Rs.
1720.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

56

10.10
0.12
15.00
0.05
10
11

Polished shabad stone flooring 1"


thick tandur blue for threads
and riser of stairs setover 1/4"
thick bed Mortor 1:4 Prop. and
pointing slabs with cement unit
pretty
...
including laying etc. complete
sqm
Cost of stone
0.00
cum
Cost of Bed Mortar 1:4
2037.63
kgs
cement for joints
220.00
Add 10% extra for threads & rises
0.00on
cum
cost of pointing with2565.63
cement pretty
sqm
Labour for laying 1375.85
RM
Flat nosing by machine7.00
crutting
Sundries L.S.

10 Sqm
10 sqm
1 cum
50 kgs
1 cum

0.00
244.52
66.00
0.00
128.28

10 sqm
1 Rm

1375.85
77.00

--------------1891.65 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

1892.00
--------------Rate: Rs.
1892.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
57

10.10
0.15
10
0.05
80

ADD

Polished shabad stone skirting


with 1" thick Tandur Blue 5"
height set over 1/2" thick bed
Mortor 1:4 Prop. including
pointing with cement pretty, flat
nasing with machine crutting
unit
...
etc. complete.
sqm
cost of stone
0.00
cum
Cost of c.m 1:4 prop2037.63
12mm thick
sqm
Labour for laying 1375.85
kgs
pointing with cement
2565.63
putty
RM
cost of flat nosing
7.00

10 Sqm
10 sqm
1 cum

0.00
305.64

10 sqm
50 kgs
1 Rm

1375.85
2.57
560.00
--------------2244.06

0 % FOR T.O.T.

For one Rm
Rounding Rs.
off say

0.00
--------------2244.00
28.05 / 1 Rmt.

28.00 / 1 Rmt.
-----------Rate: Rs.
28.00
per
1 Rmt.
---------- ------------ ------ ---------- --------- ---------

58

Damp proof coarse 50 mm thick with


CC 1:2:4 prop normal mix by volume
using 20 mm grade machine
Crushed metal appling acco proof compound
for top of cement 1:5 prop 20
unitmm thick
...
0.5 cum
c.c. 1:2:4 prop.
4034.62
10 sqm
20mm plastering 1:5
1568.47
prop.
1.5 kgs
Acco proof compound24.00
sundries

10
1
10
1

sqm
cum
sqm
kg

2017.31
1568.47
36.00
--------------3621.79 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

59

0.5
10.00
32
10
10

3622.00
--------------Rate: Rs.
3622.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Refinforced cement mortor Facia/Fire/
drop/Pardah wall 50mm thick with C.M.
1:3 Prop. and Mild steel 6mm dia at
150mm centres in both directions with
Rabit wire mesh including cost and
conveyance of all materials labour
and all operational charges, such as
centering mixing, laying,plastering and
finishing curing etc.
unit
...
10 sqm
cum
C.M. 1:3 prop
2565.63
1 cum
1282.82
sqm
Rabbit wire mesh
12.00
1 sqm
120.00
kgs
steel
52.75
1 kg
1688.00
sqm
labour charges
180.00
1 sqm
1800.00
sqm
Centering charges 102.00
1 sqm
1020.00
--------------5910.82 / 10 SqM

ADD

Rs.

0 % FOR T.O.T.

0.00
Rounding off say

5911.00
--------------Rate: Rs.
5911.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Shelves/Racks as per drawing including
plastering both sides in C.M. 1:4 Prop.
finished smooth
unit
...
10 sqm

60

10.00 sqm
ADD

Rs.

Rate as per item 68

5910.82

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

5911.00
--------------Rate: Rs.
5911.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

61

Filling the basement with Gravel to


a lead of 6 Kms cost and conveyance
of materials, watering, tamping etc.
complete.
unit
...
1 cum
1 cum
cost of gravel
288.63
1 cum
1 cum
cost of labour for filling,watering,tamping
14.00
1 cum
0
0
25 % For Municipal Limits14.00
3.5

288.63
14.00
0.00
292.13 / 1

ADD

0 % FOR T.O.T.

cum

0.00
Rounding off say

292.00
--------------Rate: Rs.
292.00
per
1 CUM
---------- ------------ ------ ---------- --------- --------Synthetic Enamel Painting
Synthetic Enamel paint 2 coats over a
coat of primer coat (3 coats in all)
with approved brand & shade, cost of
materials and labour charges etc.
complete.to new wood
unit work...
10 Sqm

62

1.2
0.6
0.7
1.2

lts
Ltrs.
Nos.
Nos.

Synthetic ENAMEL Paint


175.00
cost of wood primer 121.00
painter for Primer 1st193.40
painter for painting 2nd
193.40

Rs.

1
1
1
1

litre
litre
No.
No.

210.00
72.60
135.38
232.08

0
0
367.46
25 % For Municipal Limits

91.87
--------------741.93 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

742.00
--------------Rate: Rs.
742.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Synthetic Enamel Paint (two)
unit2 coats ...
10 Sqm

63

1.20 lts
1.20 nos

Enamel paint
175.00
Painter
193.40
0%
0 on
232.08
25 % For Municipal Limits

Rs.

1 lts
1 no

210.00
232.08
58.02
____________
500.10 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

500.00
--------------Rate: Rs.
500.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

64

Syntetic enamel paint single


unit
coat
0.70 Lts
0.70 nos

...

Enamel paint
175.00
Painter 1st class
193.40
0
0 on
135.38
25 % For Municipal Limits

10 Sqm
1 lts
1 nos

122.50
135.38
33.85
____________
291.73 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

292.00
--------------Rate: Rs.
292.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Snowcem paint to walls-

65

3.50
0.50
0.50
1.00

Snowcem paint 3 coats including 1 coat of primer coat


including cost of all materials and labour charges etc
complete
unit
...
10 Sqm
Kgs
cost of cement paint 38.00
1 kg
nos
painter
193.40
1 no
no
M.m
146.00
1 no
no
W.m
146.00
1 no

2.00 kgs
0.50 no

ADD

Rs.

Surya cement
7.12
Painter
193.40
0
0 426.64 412.40
25 % For Municipal Limits

1 kg
1 no

3.50
0.50
0.50
1.00

ADD

14.24
96.70
103.10
______________
662.74 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

66

133.00
96.70
73.00
146.00

Rs.

663.00
--------------Rate: Rs.
663.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Snowcem paint two coats including cost of all materials
labour charges etc complete
unit
...
10 Sqm
kgs
cement paint
38.00
1 kg
133.00
no
Painter
193.40
1 no
96.70
no
M.m
146.00
1 no
73.00
no
W,m
146.00
1 no
146.00
0
0
315.70
78.93
25 % For Municipal Limits
__________
527.63 / 10 SqM
0 % FOR T.O.T.

0.00
Rounding off say

Rate: Rs.

528.00

Rs.
per

528.00
--------------10 SQM

67

2.00
0.30
0.50
1.00

Snowcem painting single coat including cost of all


materials labour charges etc complete
unit
...
10 Sqm
kgs
cement paint
38.00
1
nos
painter
193.40
1
nos
M.m
146.00
1
nos
W.m
146.00
1
0
0
277.02
25 % For Municipal Limits

kg
no
no
no

76.00
58.02
73.00
146.00
69.26
___________
422.28 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

422.00
--------------Rate: Rs.
422.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------68

1.70
1.20
1.00
0.3

ADD

Rs.

Oil bound distemper two coats over one coat of primer


including cost of materials and labour charges etc
complete
unit
...
10 Sqm
lts
Oil bound distemper 77.00
1 no
no
Painter
193.40
1 no
Ltr
cost of OBD primerB401
69.00
1 sqm
Nos
painter for primer coat
142.70
1 no
25 % For Municipal Limits

130.90
232.08
69.00
42.81
68.7225
474.79 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

475.00
--------------Rate: Rs.
475.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
69

Oil bound distemper two coats including cost of


materials etc complete
unit
...
10 Sqm
1.70 lts
Oil bound distemper 77.00
1 lts
1.20 nos
Painter
193.40
1 no
25
0 % For Municipal
on
Limits
232.08

ADD

130.90
232.08
58.02
__________
421.00 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

421.00
--------------Rate: Rs.
421.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

70

Oil bound distemper single coat


unit
...
1.00 lts
Oil bound distemper 77.00
0.7 no
Painter
193.40
0
0 on
135.38
25 % For Municipal Limits

ADD

10 Sqm
1 no
1 no

77.00
135.38
33.85
__________
246.23 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

246.00
--------------Rate: Rs.
246.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------71

1.34
0.50
0.50
0.80
10.00

ADD

Watert bound distemper two coats over one of


primer including cost of materials and labour
charges etc complete
unit
...
10 Sqm
kgs
dry distemper B378 30.00
1
nos
Painter
193.40
1
no
M.m
146.00
1
no
W.m
146.00
1
sqm
costing of one coat whiting
80.98
10
0
0 on
286.5
25 % For Municipal Limits

Rs.

kg
no
no
no
sqm

40.20
96.70
73.00
116.80
80.98
71.63
__________
479.31 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

479.00
--------------Rate: Rs.
479.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------72

Water bound distemper two coats


unit
...
10.00 sqm
cost for three coats
10.00 sqm
deduct for whiting coat

ADD

Rs.

10 Sqm
479.31
80.98
__________
398.33 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

398.00
--------------Rate: Rs.
398.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
73

Water bound distemper single coat


unit
...
0.85 kgs
distemper
30.00
0.30 no
Painter
193.40
0.80 no
M.m
146.00

10 Sqm
1 kg
1 no
1 no

25.50
58.02
116.80

0
0 on
174.82
25 % For Municipal Limits

ADD

0 % FOR T.O.T.

0.00
Rounding off say

74
2
0.11
0.03
0.19

ADD

43.71
__________
244.03 / 10 SqM

Rs.

244.00
--------------Rate: Rs.
244.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------Janathacem single coat with white cement
unit
...
10 Sqm
kgs
Janathacem
7.12
1 kg
14.24
nos
Painter
193.40
1 no
21.27
no
M.m
146.00
1 no
4.38
no
W.m
146.00
1 no
27.74
0
0 on
53.39
13.35
25 % For Municipal Limits
__________
80.98 / 10 SqM
0 % FOR T.O.T.

0.00
Rounding off say

81.00
--------------Rate: Rs.
81.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------75

Rs.

Colour janatha cem single coat


unit
...
10 Sqm
10 sqm
janathacem single coat
80.98
10 sqm
Add for colour
25% of cost

ADD

80.98
20.25
__________
101.23 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

101.00
--------------Rate: Rs.
101.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

76
3.50
0.16
0.05
0.27

ADD

Janathacem two coats


unit
...
kgs
Janatha cem
7.12
no
Painter
193.40
no
M.m
146.00
no
W,m
146.00
0
0 on
77.66
25 % For Municipal Limits

10 Sqm
1
1
1
1

kg
no
no
no

24.92
30.94
7.30
39.42
19.42
__________
122.00 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

122.00
--------------Rate: Rs.
122.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------|::
77

Colour janathacem two coats


unit
...
10 sqm
Janathacem two coats
Add 25% for colour

ADD

10 Sqm
122.00
30.50
__________
152.50 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

153.00
--------------Rate: Rs.
153.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

79

Rs.

S&F 4 mm thick plain glass including removing old putty


and providing fresh putty with necessary clips etc complete
unit
...
1 Sqm
1 sqm
cost of 4 mm thick plain
334.00
glass
1 sqm
10 Add 10% for wastage
2.2 kgs
shalimar putty
36.00
1 kg
1 sqm
Labour for fixing glass40.00
1 sqm

334.00
33.40
79.20
40.00

__________
486.60 1sqm
ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

Rate: Rs.
487.00
per
1 sqm
---------- ------------ ------ ---------- --------- ---------

487.00
---------------

|::
80

S&F 4 mm pin headed glass of approved design


including cost of putty etc complete.
unit
1sqm
1 sqm

rate for plain glass


deduct differance for plain glass & pin headed glass
deduct on wastage also

486.60
114.00
__________
372.60

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

373.00
---------------

Rate: Rs.
373.00
per
1sqm
---------- ------------ ------ ---------- --------- --------S&Fbest teak wood door frame of any size with 5" x
2.5" using best teak wood scantlings including cost
of 6 nos z hold fasts and bituminous coat on masonary side
including cost of materials and labour charges etc
complete
unit
...
1 Sqm
Data for a frame of size 3-6 *7-0= 24.5 sft or 2.27 sqm

81

0.044
6.00
18
2.27

Teak wood scantling required


verticals 2* 5" *2.5" *7-0= 1.234 cft
h0rizantal 1*5" *2.5" *3-6= 0.308cft
------------------total
OR
=== 0.0437
1.542cft
CUM
------------------CUM cost of teak wood
75194
nos
z hold fasts
8.00
nos
screws 1" long
0.50
sqm
labour charge @30%114.90

3421.22
1sqm== ----------2.27 sqm

= 1507.15 /

1
1
1
1

CUM
no
no
sqm

3285.98
48.00
9.00
78.25

--------------3421.22
----------------

1 Sqm

Rounding off say

Rs.

1507.00
--------------Rate: Rs.
1507.00
per
1 SQM
---------- ------------ ------ ---------- --------- ---------

82

VRCC ( 1:1.5:3 ) prop. corresponding to M20 grade using 20mm to 6mm size
graded ( 60% of 20mm metal, 15% of 12mm metal,15% of 10mm metal,10%
of 6mm metal ) HBG / machine crushed metal as per SS 108 with necessory
reinforcement including cost and conveyance of all materials and water to
work site,seigniorage and all operational incidental, labour charges such as
centering,form work,mixing concrete,laying,vibrating,curing etc.,complete for
finished item of work as per SS403 but excluding cost of reinforcement steel
and its fabrication charges etc.,complete and as directed by the deparment.

a)

RCC lintels,Plinth beems & cuvert


slabs less than 3mt span unit
...
cost of CC 1:1 1/2 : 3 Prop. as
1 cum
per item No.7 above4523.02
1 cum
cost of centering charges
1071.00
1 cum
vibrating charges
43.00
sundries

1 cum
1 cum
1 cum
1 cum

4523.02
1071.00
43.00
--------------5637.02 / CUM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

5637.00
--------------Rate: Rs.
5637.00
per
1 CUM
---------- ------------ ------ ---------- --------- --------R.C.C. Footings
unit
...
1 cum
1 cum
cost of CC 1:1 1/2 :4523.02
3
1 cum
4523.02
1 cum
cost of centering
715.00
1 cum
715.00
1 cum
vibration charges
43.00
1 cum
43.00
sundries
--------------5281.02 / CUM

83 a)

ADD

Rs.

0 % FOR T.O.T.

0.00
Rounding off say

5281.00
--------------Rate: Rs.
5281.00
per
1 CUM
---------- ------------ ------ ---------- --------- --------R.C.C. Pedastals
unit
...
1 cum
1 cum
cost of CC 1:1 1/2 :4523.02
3
1 cum
4523.02
1 cum
cost of centering
963.00
1 cum
963.00
1 cum
vibration charges
43.00
1 cum
43.00
sundries
--------------5529.02 / CUM

84 a)

ADD

Rs.

0 % FOR T.O.T.

0.00
Rounding off say

Rate: Rs.

5529.00

Rs.
per

5529.00
--------------1 CUM

85 a)

R.C.C. Columns
1 cum
1 cum
1 cum

unit
...
cost of CC 1:1 1/2 :4523.02
3
cost of centering 1587.00
vibration charges
43.00
sundries

1 cum
1 cum
1 cum
1 cum

4523.02
1587.00
43.00
--------------6153.02 / CUM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

6153.00
--------------Rate: Rs.
6153.00
per
1 CUM
---------- ------------ ------ ---------- --------- ---------

86 a)

R.C.C. 'L' beams,'T' Beams


rectangular beamsunit
...
1 cum
cost of CC 1:1 1/2 :4523.02
3
1 cum
cost of centering 1509.00
1 cum
vibration charges
43.00
sundries

Rs.

1 cum
1 cum
1 cum
1 cum

4523.02
1509.00
43.00
--------------6075.02 / CUM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

6075.00
--------------Rate: Rs.
6075.00
per
1 CUM
---------- ------------ ------ ---------- --------- --------b)

First floor ....1 cumunit


...
1 cum
Rate of ground floor6075.02
1 cum
Lift Charges
55.00
25 % For Municipal Limits55.00

Rs.

1 cum
1 cum
1 cum
13.75

6075.02
55.00
13.75 / CUM

ADD

0 % FOR T.O.T.

0.00
6143.77
Rounding off say

Rs.

--------------Rate: Rs.
6133.00
per
1 CUM
---------- ------------ ------ ---------- --------- ---------

87 a)

RCC roof slab 100mm thick


1:1 1/2:3 Prop. unit
...
1 cum
cost of CC 1:1 1/2 :4523.02
3
10 sqm
cost of centering 1690.00
1 cum
cost of vibration charges
43.00
sundries

10 sqm
1 cum
10 sqm
1 cum

4523.02
1690.00
43.00
--------------6256.02 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

6256.00
--------------Rate: Rs.
6256.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------First Floor ....10 sqm
1 cum
Ground Floor
6256.02
1 cum
6256.02
1 cum
Lift charges
55.00
1 cum
55.00
25 % For Municipal Limits55.00
13.75
13.75 / 10 SqM

b)

ADD

Rs.

0 % FOR T.O.T.

0.00
6324.77
Rounding off say

88 a)

Rs.

--------------Rate: Rs.
6325.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------RCC roof slab 115mm 4.5"
thick 1:1 1/2:3 Prop.
unit
...
10 sqm
1.15 cum
cost of CC 1:1 1/2 :4523.02
3
1 cum
5201.48
10 sqm
centering charges 1690.00
10 sqm
1690.00
1.15 cum
vibration charges
43.00
1 cum
49.45
Rounding
--------------6940.93 / 10 SqM
ADD

0 % FOR T.O.T.

0.00
Rounding off say

6941.00
--------------Rate: Rs.
6941.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

First Floor ..... 10 Sqm


1 cum
Rate of ground floor6940.93
1 cum
Lift charges
55.00
25 % For Municipal Limits55.00

Rs.

1 cum
1 cum
13.75

6940.93
55.00
13.75 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
7009.68
Rounding off say

Rs.

--------------Rate: Rs.
7010.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

89 A)

RCC roof slab 5" thick


unit (125mm)
...
1.25 cum
cost of CC 1:1 1/2 :4523.02
3
10 sqm
centering charges 1690.00
1.25 cum
vibration charges
43.00
Sundries

ADD

10 sqm
1 cum
10 sqm
1 cum

5653.78
1690.00
53.75
--------------7397.53 / 10 SqM

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

7398.00

Rate: Rs.
7398.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------b)

(First floor)
1 cum
1 cum

...

Ground floor rate 7397.53


Lift charges
55.00
25 % For Municipal Limits55.00

10 sqm
1 cum
1 cum
13.75

7397.53
55.00
13.75 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
7466.28
Rounding off say

Rs.

--------------Rate: Rs.
7466.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

|::
90

RCC roof slab 6" thick (150mm)


unit
1:2:4 prop
1.50 cum
10 sqm
1.50 cum

...

cost of CC 1:1 1/2 :4523.02


3
centering charges 1690.00
vibration charges
43.00
Sundries

10 sqm

1 cum
10 sqm
1 cum

6784.53
1690.00
64.50
--------------8539.03 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

8539.00
--------------Rate: Rs.
8539.00
per
10 SQM
---------- ------------ ------ ---------- --------- ---------

91

RCC sunshades or chajja of any size


and average 2" thick 1/2" platering
in CM 1:5 prop. as base coat and
in CM 1:3 1/8" thick as finishing
coat including dubara finishing etc
complete
Data for 10 Sqm
0.5 cum
cost of CC 1:1 1/2 :4523.02
3
1 sqm
centering
138.00
20.75 Plastering 2 coats
1365.34
Sundries

1 cum
1 sqm
10 sqm

2261.51
138.00
2833.08
--------------5232.60 / 10 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

5233.00
--------------Rate: Rs.
5233.00
per
10 SQM
---------- ------------ ------ ---------- --------- --------RCC facia average 2" thick with
1/2" thick plastering in CM 1:5
`
prop and 1:3 prop dubara sponge
finish etc

92

0.05 cum
2 sqm
1.04 sqm

cost of CC 1:1 1/2 :4523.02


3
centering charges 1690.00
plastering double coats
1365.34
Sundries

Rs.

1 cum
10 sqm
10 sqm

226.15
338.00
142.00
--------------706.15 / 1 SqM

ADD

0 % FOR T.O.T.

0.00
Rounding off say

Rs.

706.00
--------------Rate: Rs.
706.00
per
1 SQM
---------- ------------ ------ ---------- --------- ---------

{
RATES OF LABOUR & MATERIALS
~~~~~~~ ~~~~~~
PLACE OF WORK :- Venkataramannagudem
`````````````````````````````````````````````````````
S.S.R. :- Common S.S.R. for all Engineering Departments FOR THE YEAR
~~~~~~~
ADD
25
--------- --------TOTAL
25
~~~~~ ~~~~~
ADD
0
--------- --------- --------CODE SS.No/LQ.
--------- --------- --------I.
~~~~~
( L-1 )
(L-43)
(L-73)
(L-76)

% For Municipal
Rs. Limits
% of Labour 0.25
Component
)
i.e (
~~~~~~
% FOR T.O.T.
0.00
------------ ----------- ------------ ------- ---------ITEMS
Rate
Per
------------ ----------- ------------ ------- ---------L A B O U R - RATES
~~~~~~~
Mason Ist class
206.00
1
Mason IInd class 188.00
1
Man Mazdoor
146.00
1
WoMan Mazdoor 146.00
1

-----------------

each
each
each
each

MISCELLENEOUS ITEMS
~~~~~ ~~~~~~~
(M-184)
Labour for MIXING Mortor
28.00

1 CUM

(M-292)

Machine MIXING of Concrete


45.00

1 CUM

(M-291)

Vibrating Charges for 43.00


C.C.

1 CUM

(B-117)

Steel FABRICATION Charges


9.00

1 Kg.

(B-47)
(B-44)
(B-1006)

Sh.stone Flat Nosing 7.00


Sh.stone ROUNDING38.00
Labour for RCM Facia/rack
180.00

1 Rmt
1 Rmt
1 Sqm

MR
(B-943)

Labour for GLASS Fixing


40.00
Labour for wood work383.00

1 sqm
1 sqm

Earth Work & Filling :


~~~~~ ~~~~~~~~~~~~~~~~~~
(M-246)
Earth work excavation
375.00
10 CUM
SS: 20-B of S.S.R.
Mixture of gravel&soft disintigrated rock like shales,ordinary gravel,
stony earth and earth mixed with fair sized boulders.
(M-286)

Labour for Refilling EARTH


140.00

8-Lead

2 KMs Earth carting lead


106.00

(M-285)

Sand/gravel filling labour


14.00

10 CUM

1 cum
1 CUM

Centring - Scaffolding - Lift Charges


~~~~~ ~~~~~~~ ~~~~~~
(B-982) Centring for Lintel/PB
1071.00

1 cum

(B-980) Centring for Bedblocks/footing/templets


715.00

1 cum

(B-981) Centring for Pedestals

963.00

1 cum

1587.00

1 cum

(B-986) Centring for L-Beams & T-Beams


1509.00

1 cum

(B-985)

"

Columns

(B-987)

"

RCC Slab (upto 1501690.00


mm th.)

10 sqm

(B-867)

"

Rcm/facia railing

102.00

1 Rmt

(B-984)

"

Sunshade any thickness


138.00

1 Sqm

(B-974)

"

Scaffolding for Brick work


48.00
at second floor1level
cum

(B-975)

"

Scaffolding for Brick work


40.00
at 1st floor level1 cum

(B-978)

"

for Plastering bet F.F&S.F


44.00

10 SQM

(B-1022)Lift charges for BM bet FF & SF


46.00

1 cum

(B-1013)

"

for R.C.C. bet F.F & S.F


55.00

1 cum

(B-1030)

"

for Plastering bet F.F&S.F


11.00

10 sqm

II.
M A T E R I A L S - RATES
~~~~~ ~~~~~~~ ~~~~~~ ~
(M-183)Cost
of C E M E N T 220.00

1 Bag

|::

Lead +(M-193)
Lead +(M-190)
Lead +(M-179)

"
"
"

of Tor Steel bars


50.80
of Mild Steel bars
41.50
of S A N D for Mortar
419.00

1 Kg.
1 Kg.
1 cum

Lead +(M-180)

"

of S A N D for Filling304.00

1 cum

Lead +(M-177)

"

of GRAVEL for Filling


273.00

1 cum

Lead +(M-118)

"

Of

1 cum

Lead +(M-113
to M116)
Lead +(M-102)

"

Of 6mm-20 mm H.B.G
1516.85
(M.C) Metal

1 cum

"

of C.R.S. Stone (Granite)


0.00

1 cum

Lead +(M-100)

"

of Rough Stone (Granite)


0.00

1 cum

Lead + (B-1)

"

Bricks 2nd class(local)


3440.00

40 mm H.B.G 1085.60
Metal

1000

Nos

(B-320)

"

Impervious /Accoproof24.00
Compound

"

Rough
shabad
stone
slabs
50mm(bl
ue)

0.00

10 Sqm

Lead + (B-36)

"

Polished
shabad
stone
slab
25.4mm(
blue)

0.00

10 Sqm

(B-213)

"

of Rabbit Wire MESH


12.00

1 sqm

(B-276)

"

4mm (Plain) Glass 334.00

1 sqm

(B-288)

"

4mm (Pin headed) Glass


220.00

1 sqm

(B-95)

"

Best Teak Wood

1 CUM

Lead + (B-34)

(B-304)
(B-305)

75194

Shalimar putty(Iron work)


0.00
Shalimar putty(Wood work)
36.00

1 Kg.

1 kg
1 kg

|::
PAINTS
~~~~~ ~~
(B-312) Cost of Synthetic Enamel Paint
175.00
Grade - I (ISI)
(B-322)
"
of P R I M E R Paint
121.00
(wood)

1 Ltr

(B-303)

"

of French Polish (Wax)


255.00

1 Ltr

(B-327)

"

of SNOW CEM Paint


38.00

1 Kg.

1 Ltr

"

of OIL
Bound
DISTEM
PER
(Acrylic
based)

77.00

1 Kg.

(B-300)

"

of
WATER
Bound
DISTEM
PER(dry
powder)

30.00

1 Kg.

(B-328)

"

Surya cem

7.12

1 Kg

(B-301)

DATAS
~~~~~~~

PLACE OF WORK :- Venkataramannagudem


~~~~~~~
Common S.S.R. for all Engineering Departments FOR THE YEAR 200
~~~~~~~

1.
-->

EARTH WORK EXCAVATION :


******** ******** ***********
Earth work excavation of foundation and depositing on banks in all soils
with all leads and lifts but excluding cost of blasting of rock such as
Mixture of gravel&soft disintigrated rock like shales,ordinary gravel,
stony earth and earth mixed with fair sized boulders.
UNIT:
10 cum
~~~~~~~ ~~~~ ~~~~~~ ~~~~~
10.00 cum
cost of excavation 375.00
10 cum
SS: 20-B and
(M-246)
SSR Item no.
~~~~~~
Add
75 % for building 0.75
foundation(
)
0.00
0
0

25 % For Municipal Limits


656.25 (L)
~~~~~~~
Total
ADD

0
Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
820.00
per
10
----------- ------------ ------- ---------- --------- ---------

2a.

FILLING ITEMS :
******** ***********
Filling foundation and basement with available excavated earth
including breaking clods, watering and tamping, and complete. ....10 cum
10.00 cum

0.00

ADD

cost of refilling( M 286)


140.00

10 cum

25 % For Municipal Limits


140.00 (L)
~~~~~~~
Total

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
175.00
per
10
----------- ------------ ------- ---------- --------- ---------

|::
2b.

Filling of basement with carted earth with a dist of 2 KM including


cost and conveyance of earth, watering, tamping, etc., complete.
Unit:
10 cum

10.00 cum
10.00 cum

ADD

cost of earth
375.00
lead charges for 2 Kms
106.00

10 cum
1 cum

Total

Rs.

Rounding off say

Rs.

0 % FOR T.O.T.

Rate: Rs.
1435.00
per
10
----------- ------------ ------- ---------- --------- --------3.

Filling the basement with gravel including cost of conveyance


of all materials, watering, tamping, etc., complete.
Unit:
1 cum
1.00 cum
cost of gravel
288.63
1 cum
1.00 cum
cost of labour for filling,
watering, tamping
14.00
1 cum
0
0
0.00
25 % For Municipal
Rs. Limits14.00 (L)
~~~~~~~
Total
ADD

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
306.00
per
1
----------- ------------ ------- ---------- --------- --------4.

Filling sand under foundation including cost and conveyance


charges to site from approved source, labour charges for filling
and spreading in layers, watering, ramming etc., complete.
..
1 cum
1.00 cum
cost of sand for filling303.63
1 cum
1.00 cum
cost of labour for filling
as item No. 4
14.00
1 cum
0.00
0
0
25 % For Municipal
Rs. Limits14.00 (L)

ADD

~~~~~~~
Total

Rs.

Rounding off say

Rs.

0 % FOR T.O.T.

Rate: Rs.
321.00
per
1
----------- ------------ ------- ---------- --------- ---------

5.

Steel Reinforcement
******** ******** ***********
Providing Steel reinforcement of different diameters, cutting and bending to
required sizes and shapes placing in position with cover blocks of approved
material & size, tying firmly with M.S. binding wireforming grills for reinforcement
work as per approved design & drawing to be supplied at the time of execution
of work including cost and conveyance of deformed bars and all wastages such
as over laps, couplings, welded joints, chairs, spacer bars, binding wire, cover
blocks and all operational & incidental labour charges such as cutting, bending
placing in position, tying etc., complete for finished item of work ( payment will
be made on the basis of weight of fabricated deformed bars only )as directed
by the Department.
Unit :
1 KG
~~~~~~~ ~~~~ ~~~~~~
1.00 Kg
cost of steel
41.50
1 Kg
1.00 Kg
cost of fabrication
9.00
1 Kg
0.00
0
0
25 % For Municipal
Rs. Limits 9.00 (L)
~~~~~~~
Total
ADD

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
52.75
per
1
----------- ------------ ------- ---------- --------- --------6.

CEMENT MORTARS:-

a)
1.00
9.60
1.00
0.00

******** ***********
Cement mortar 1:3 prop
..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
2565.63 per
1 cum
----------- ------------ ------- ---------- --------- --------b)
1.00
7.20
1.00
0.00

Cement Mortar 1:4 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
2037.63 per
1 cum
----------- ------------ ------- ---------- --------- ---------

c)
1.00
5.76
1.00
0.00

Cement Mortar 1:5 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
1720.83 per
1 cum
----------- ------------ ------- ---------- --------- ---------

|::

d)
1.00
4.80
1.00
0.00

Cement Mortar 1:6 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
1509.63 per
1 cum
----------- ------------ ------- ---------- --------- --------e)

Cement Mortar 1:8 prop.


..
1.00 cum
cost of sand for mortar
418.63
3.60 bags cement
220.00
1.00 cum
labour for mixing
28.00
15 % labour +
13 % importation
28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
1245.63 per
1 cum
----------- ------------ ------- ---------- --------- --------f)
1.00
2.88
1.00
0.00

Cement Mortar 1:10 prop.


..
cum
cost of sand for mortar
418.63
bags cement
220.00
cum
labour for mixing
28.00
0
0
25 % For Municipal Limits28.00 (L)
~~~~~~~
Total

1
1
1
1

cum
cum
bag
cum

Rs.

Rate: Rs.
1087.23 per
1 cum
----------- ------------ ------- ---------- --------- ---------

7.

Plain cement concretes******** ***********


P.C.C. 1:5:10 Prop. using 40mm HBG metal including all materials,
labour, charges, tamping, curing, etc., complete.

..
0.92
0.46
2.65
0.06
0.14
1.80
1.40
0.00

ADD

cum
cost of 40mm metal 908.48
cum
cost of sand
418.63
bags cement
220.00
Mason 1st class
206.00
Mason 2nd class
188.00
Man
mazdoor
146.00
Womanmazdoor
146.00
0
0
25 % For Municipal
Rs. Limits
505.88 (L)
~~~~~~~
Total

1
1
1
1
1
1
1
1

cum
cum
cum
bag
day
day
day
day

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2244.00
per
1
----------- ------------ ------- ---------- --------- ---------

|::
8.

P.C.C. 1:4:8 Prop. using 40mm HBG metal including all materials,
labour, charges, tamping, curing, etc., complete.
..
1 cum
0.92 cum
cost of 40mm metal 908.48
1 cum
0.46 cum
cost of sand
418.63
1 cum
3.31 bags cement
220.00
1 bag
0.06 Mason 1st class
206.00
1 day
0.14 Mason 2nd class
188.00
1 day
1.80 Man
mazdoor
146.00
1 day
1.40 Womanmazdoor
146.00
1 day
0
25 % For Municipal Limits
505.88 (L)
~~~~~~~
Total
Rs.
ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2389.00
per
1
----------- ------------ ------- ---------- --------- --------9.

P.C.C. 1:3:6 prop. using 40mm HBG metal


unit
..
0.92 cum
cost of 40mm metal 908.48
0.46 cum
cost of sand
418.63
4.42 bags cement
220.00
0.06 Mason 1st class
206.00
0.14 Mason 2nd class
188.00
1.80 Man
mazdoor
146.00
1.40 Womanmazdoor
146.00
0.00
0
0
25 % For Municipal Limits
505.88 (L)
~~~~~~~
Total
ADD

1
1
1
1
1
1
1
1

cum
cum
cum
bag
day
day
day
day

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2633.00
per
1
----------- ------------ ------- ---------- --------- --------|::
10 P.C.C. 1:2:4 prop. using 20mm to 6mm size HBG machine mixing,
laying, curing, etc., complete
unit
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
6.62 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing45.00
1 cum
0.12 Nos. Mason 1st class
206.00
1 each
0.28 Nos. Mason 2nd class
188.00
1 each
2.10 Nos. Mam mazdoor
146.00
1 each
3.50 Nos. Woman mazdoor
146.00
1 each
0.00
0
0
25 % For Municipal
Rs. Limits
894.96 (L)

ADD

Total

Rs.

Rounding off say

Rs.

0 % FOR T.O.T.

Rate: Rs.
4035.00
per
1
----------- ------------ ------- ---------- --------- ---------

11a. P.C.C. 1:1 1/2:3 prop. using 3/4" to 1/4" size HBG machine mixing
curing etc., complete.
unit
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
8.84 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing45.00
1 cum
0.12 Nos. Mason 1st class
206.00
1 each
0.28 Nos. Mason 2nd class
188.00
1 each
2.10 Nos. Mam mazdoor
146.00
1 each
3.50 Nos. Woman mazdoor
146.00
1 each
0.00
0
0
25 % For Municipal
Rs. Limits
894.96 (L)
~~~~~~~
Total
Rs.
ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
4523.00
per
1
----------- ------------ ------- ---------- --------- --------|::
12 P.C.C. 1:3:6 Prop. using 20mm to 6mm size HBG metal mahine
mixing, curing, etc., complete.
..
1 cum
0.92 cum
cost of 20mm graded
1328.21
metal
1 cum
0.46 cum
cost of sand
418.63
1 cum
4.41 bags cement
220.00
1 bag
1.00 cum
cost of machine mixing45.00
1 cum

0.12
0.28
2.10
3.50
0

Nos.
Nos.
Nos.
Nos.

ADD

Mason 1st class


206.00
Mason 2nd class
188.00
Mam mazdoor
146.00
Woman mazdoor
146.00
0
0
25 % For Municipal Limits
894.96 (L)
~~~~~~~
Total

1
1
1
1

each
each
each
each

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3548.00
per
1
----------- ------------ ------- ---------- --------- ---------

13

Randum Rubble Masonry:******** ***********


R.R. Masonry in C.M.
unit1:8 prop.
..
1.10 cum
cost of rough stone
0.00
0.34 cum
cost of C.M. 1:8 prop.
1245.63
0.54 Nos. Mason 1st class
206.00
1.26 Nos. Mason 2nd class
188.00
1.40 Nos. Man mazdoor
146.00
1.40 Nos. Woman mazdoor
146.00
0.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total
ADD

1
1
1
1
1
1
1

cum
cum
cum
each
each
each
each

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1370.00
per
1
----------- ------------ ------- ---------- --------- --------14
1.10 cum
0.34 cum

R.R. Masonry in C.M.


unit1:6 prop.
..
cost of rough stone
0.00
cost of C.M. 1:6 prop.
1509.63

1 cum
1 cum
1 cum

0.54
1.26
1.40
1.40
0.00

Nos.
Nos.
Nos.
Nos.

Mason 1st class


206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Woman mazdoor
146.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

ADD

1
1
1
1

each
each
each
each

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1459.00
per
1
----------- ------------ ------- ---------- --------- --------|::
15
1.10
0.34
0.54
1.26
1.40
1.40
0.00

R.R. Masonry in C.M.


unit1:5 prop.
..
cum
cost of rough stone
0.00
cum
cost of C.M. 1:5 prop.
1720.83
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Nos. Man mazdoor
146.00
Nos. Woman mazdoor
146.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

ADD

1
1
1
1
1
1
1

Rs.

0 % FOR T.O.T.
Rounding off say

16
1.10
0.34
0.54
1.26

cum
cum
cum
each
each
each
each

cum
cum
Nos.
Nos.

Rate: Rs.
1531 /----------- ------------ ------- ---------R.R. Masonry in C.M.
unit1:4 prop.
..
1
cost of rough stone
0.00
1
cost of C.M. 1:4 prop.
2037.63
1
Mason 1st class
206.00
1
Mason 2nd class
188.00
1

Rs.
per
1
--------- --------cum
cum
cum
each
each

1.40 Nos. Man mazdoor


146.00
1.40 Nos. Woman mazdoor
146.00
0.00
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total
ADD

1 each
1 each

Rs.

0 % FOR T.O.T.
Rounding off say

17
1.10
0.34
0.54
1.26
1.40
1.40
0.00

ADD

Rate: Rs.
1639 /----------- ------------ ------- ---------R.R. Masonry in C.M.
unit1:3 prop.
..
1
cum
cost of rough stone
0.00
1
cum
cost of C.M. 1:3 prop.
2565.63
1
Nos. Mason 1st class
206.00
1
Nos. Mason 2nd class
188.00
1
Nos. Man mazdoor
146.00
1
Nos. Woman mazdoor
146.00
1
0
0
25 % For Municipal
Rs. Limits
756.92 (L)
~~~~~~~
Total

Rs.
per
1
--------- --------cum
cum
cum
each
each
each
each

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1818 /per
1
----------- ------------ ------- ---------- --------- --------Coursed Rubble Masonry:******** ***********
18 C.R.S. Masonry in C.M. 1:8 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:8 prop.
1245.63
1 cum

0.75
1.75
1.40
1.40
0.00

ADD

Nos.
Nos.
Nos.
Nos.

Mason 1st class


206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Woman mazdoor
146.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total

1
1
1
1

each
each
day
day

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0 /per
1
----------- ------------ ------- ---------- --------- --------19 C.R.S. Masonry in C.M. 1:6 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:6 prop.
1509.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor
146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0 /per
1
----------- ------------ ------- ---------- --------- --------|::
20 C.R.S. Masonry in C.M. 1:5 prop. 2nd sort including cost of

all materials, labour charges, etc., complete.


unit
..
0.60 cum
cost of C.R.S. stone 0.00
0.50 cum
cost of rough stone
0.00
0.32 cum
C.M. 1:5 prop.
1720.83
0.75 Nos. Mason 1st class
206.00
1.75 Nos. Mason 2nd class
188.00
1.40 Nos. Man mazdoor
146.00
1.40 Nos. Woman mazdoor
146.00
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

1
1
1
1
1
1
1
1

cum
cum
cum
cum
each
each
day
day

0 % FOR T.O.T.
Rounding off say
Rate: Rs.
0 /per
1
----------- ------------ ------- ---------- --------- ---------

21 C.R.S. Masonry in C.M. 1:4 prop. 2nd sort including cost of


all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:4 prop.
2037.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor
146.00
1 day
0.00
0
0
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0 /per
1
----------- ------------ ------- ---------- --------- --------22 C.R.S. Masonry in C.M. 1:3 prop. 2nd sort including cost of
all materials, labour charges, etc., complete.
unit
..
1 cum
0.60 cum
cost of C.R.S. stone 0.00
1 cum
0.50 cum
cost of rough stone
0.00
1 cum
0.32 cum
C.M. 1:3 prop.
2565.63
1 cum
0.75 Nos. Mason 1st class
206.00
1 each
1.75 Nos. Mason 2nd class
188.00
1 each
1.40 Nos. Man mazdoor
146.00
1 day
1.40 Nos. Woman mazdoor
146.00
1 day
25 % For Municipal
Rs. Limits
892.30 (L)
~~~~~~~
Total
ADD
0 % FOR T.O.T.
Rounding off say

Rs.

Rs.

Rate: Rs.
0 /per
1
----------- ------------ ------- ---------- --------- --------|::

Brick Masonry using 2nd class Bricks


******** *********** *********
23 Brick masonry in C.M. 1:3 prop. with 2nd class bricks including cost &
conveyance of materials, labour, scaffolding, during, etc., complete.
(ground floor)
unit
..
1 cum
~~~~~~~~~~~~~
512 Nos. cost of 2nd class bricks
3513.25
Nos
1000
0.20 cum
cost of C.M. 1:3 prop.
2565.63
1 cum
0.42 nos.
Mason 1st class
206.00
1 each
0.98 nos.
Mason 2nd class
188.00
1 each
0.70 Nos. Man mazdoor
146.00
1 day
2.10 Nos. Woman mazdoor
146.00
1 day

0.00

ADD

0
0
25 % For Municipal
Rs. Limits
679.56 (L)
~~~~~~~
Total

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3161.00 /per
1
----------- ------------ ------- ---------- --------- ---------

a)

Brick masonry in C.M. 1:3 prop.


unit
...
(First floor)
~~~~~~~~~~~~~
1.00 cum
Brick masonry in C.M. 1:3 prop.
@ G.Floor Rate 3161.36
1.00 cum
lift charges to F.F.
46.00
1.00 cum
cost of scaffolding charges
40.00
0.00
25 % For Municipal Limits46.00
~~~~~~~
Total
ADD

1 cum

1 cum
1 cum
1 cum

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3259 /per
1
----------- ------------ ------- ---------- --------- ---------

|::
24 Brick masonry in C.M. 1:4 prop. with 2nd class bricks including cost &
conveyance of materials, labour, scaffolding, during, etc., complete.
(ground floor)
unit
..
1 cum
~~~~~~~~~~~~~
512 Nos. cost of 2nd class bricks
3513.25
Nos
1000

0.20
0.42
0.98
0.70
2.10
0.00

ADD

cum
nos.
nos.
Nos.
Nos.

cost of C.M. 1:4 prop.


2037.63
Mason 1st class
206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Woman mazdoor
146.00

1
1
1
1
1

cum
each
each
day
day

0
0
25 % For Municipal
Rs. Limits
679.56 (L)
~~~~~~~
Total

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3056 /per
1
----------- ------------ ------- ---------- --------- --------a)

Brick masonry in C.M. 1:4 prop.


unit
...
(First floor)
~~~~~~~~~~~~~
1.00 cum
Brick masonry in C.M.
3055.76
1:4 prop.
1.00 cum
Lift charges to First floor
46.00
1.00 cum
Scafolding charges F.F.
40.00

ADD

25 % For Municipal Limits


0 % FOR T.O.T.

1 cum

1 cum
1 cum
1 cum

46

Rounding off say

Rs.

Rate: Rs.
3153.00
per
1
----------- ------------ ------- ---------- --------- ---------

25 a)

Brick Masonry in C.M. 1:5 Prop.


(Ground floor)
unit
...
~~~~~~~~~~~~~
512 nos
Cost of bricks
3513.25

1 cum
1000 nos

0.2 cum
1 cum

c.m 1:5 pro


1720.83
Labour charges as item
849.45
no24

ADD

1 cum
1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2992.00
per
1
----------- ------------ ------- ---------- --------- ---------

|::
b)

Brick Masonry in C.M. 1:5 Prop.


(First floor)
unit
...
~~~~~~~~~~~~~
1 cum
Rate of ground floor2992.40
1 cum
Lift charges to F.F
46.00
1 cum
Scofolding charges to F.f
40.00
25 % For Municipal Limits
ADD

1 cum
1 cum
1 cum
1 cum

46

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3090.00
per
1
----------- ------------ ------- ---------- --------- --------26 a)

Brick Masonry in C.M. 1:6 Prop.


(Ground floor)
unit
...
~~~~~~~~~~~~~
512 nos
Bricks
3513.25
0.2 Cum
1 cum

C.M 1:6 Pro


1509.63
Labour charges as item
849.45

1 cum
1000 nos
1 cum
1 Cum

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2950.00
per
1
----------- ------------ ------- ---------- --------- ---------

b)

Brick Masonry in C.M. 1:6 Prop.


(First floor)
unit
...
~~~~~~~~~~~~~
1 cum
Rate of ground floor2950.16
1 cum
Lift charges to First floor
46.00
1 cum
scofolding charges to first
40.00
floor
25 % For Municipal Limits46.00
ADD

1 cum
1 cum
1 cum
1 cum

0 % FOR T.O.T.
Rounding off say

27 a)

Rate: Rs.
3048.00
----------- ------------ ------- ---------Brick Masonry in C.M. 1:8 Prop.
(Ground floor)
unit
...
1
~~~~~~~~~~~~~
512 nos
cost of bricks
3513.25
1000
0.2 cum
cost of C:M 1:8 pro 1245.63
1
1 cum
labour charges as above
849.45
1

ADD

Rs.
per
1
--------- --------cum
nos
cum
cum

0 % FOR T.O.T.
Rounding off say
Rate: Rs.

2897.00

Rs.
per

----------- ------------ ------- ---------Brick Masonry in C.M. 1:8 Prop.


(First floor)
unit
...
1
~~~~~~~~~~~~~
1 cum
rate of ground floor 2897.36
1
1 cum
lift charges to F.F
46.00
1
1 cum
scofolding charges
40.00
1

b)

ADD

--------- --------cum
cum
cum
cum

25 % For Municipal Limits46.00


0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2995.00
per
1
----------- ------------ ------- ---------- --------- --------28 a)

R.B.M. walls in C.M. 1:3 Prop. using 2nd


class bricks and 2 nos 6 mm M.S.
rods for every 3rd layer including
labour etc complete
(Ground floor)4.5" thick
unit
..
1sqm
~~~~~~~~~~~~~
0.114 cum
brick masonry in c.m.
3161.36
1:3
1 cum
1.85 kgs
cost of steel
41.50
1 Kg.
sundries

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
437.00
per
1
----------- ------------ ------- ---------- --------- --------b)
0.114 cum
1.85 kgs

(First Floor)
~~~~~~~~~~~~~
brick masonry in CM3258.86
1:3 prop.F.F
of steel
41.50

1 cum
1 kg

Add sundries

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
448.00
per
1
----------- ------------ ------- ---------- --------- --------|::
29 a)

R.B.M. Walls in c.m. 1:4 prop. using 2nd


class bricks and 2 nos.
unit 6 mm...
M.S.
rods @ every 3rd layer including
labour charges etc. complete
(Ground floor)
~~~~~~~~~~~~~
0.114 cum
brick masonry in CM3055.76
1:4 Prop.
1.85 kgs
steel
41.50
sundries

ADD

1 sqm

1 cum
1 kg

0 % FOR T.O.T.
Rounding off say

b)

Rate: Rs.
425.00
----------- ------------ ------- ---------R.B.M. walls in C.M. 1:4 Prop.
unit
...
1
(First floor)
~~~~~~~~~~~~~
0.114 cum
Brick masonry in cm3141.76
1:4 prop F.F.
1
1.85 kg
steel
41.50
1
Add sundries

ADD

0 % FOR T.O.T.

Rs.
per
1
--------- --------sqm

cum
kg

Rounding off say

30 a)

0.15
0.33
0.77
0.5
1.1

Rate: Rs.
435.00
----------- ------------ ------- ---------Plastering 12 mm thick with cement Mortors
~~~~~~~
Plastering 12 mm thick in C.M.
unit 1:3 prop.
...
10
(Ground floor)
~~~~~~~~~~~~~
cum
C.M. 1:3 Prop.
2565.63
1
Nos. Mason 1st class
206.00
1
Nos. Mason 2nd class
188.00
1
Man
Mazdor
146.00
1
Woman Mazdor
146.00
1
0
0
25 % For Municipal Limits
446.34
sundries

Rs.
per
1
--------- ---------

sqm

cum
no
no
no
no

943
ADD

0 % FOR T.O.T.
Rounding off say
Rate: Rs.

|::
b)

943.00

(First floor)
unit
...
10
~~~~~~~~~~~~~
10 sqm
Plastering in C.M. 1:3942.77
prop. 12 mm
10
10 sqm
scofolding charges between
44.00 F.F. & S.F. 10
10 sqm
lift charges
11.00
10
25 % For Municipal Limits11.00

ADD

Rs.
per

10

sqm
sqm
sqm
sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
998.00
per
10
----------- ------------ ------- ---------- --------- --------31 a)
0.15 cum
10 sqm

ADD

Plastering 12mm thick in C.M. 1:4 prop


(Ground floor)
unit
...
10 sqm
C.M. 1:4 prop
2037.63
1 cum
Labour as item No.30557.93
above
10 sqm
sundries L.S.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
864.00
per
10
----------- ------------ ------- ---------- --------- ---------

b)

Plastering 12 mm thick in C.M. 1:4


prop (First floor) unit
...
~~~~~~~~~~~~~
10 sqm
Ground floor rate
863.57
10 sqm
scofolding & lift charges
55.00
25 % For Municipal Limits11.00

ADD

10 sqm
10 sqm
10 sqm
2.75

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
921.00
per
10
----------- ------------ ------- ---------- --------- ---------

32 a)

0.15 cum
10 sqm

Plastering 12mm in C.M. 1:5 Porp


(Ground floor)
unit
...
~~~~~~~~~~~~~
C.M. 1:5 Prop
1720.83
Labour charges as per
557.93
item no.

10 sqm
1 cum
10 sqm

above

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
816.00
per
10
----------- ------------ ------- ---------- --------- --------|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no 32
816.05
a
10 sqm
Lift charges+scofolding
55.00
charges
25 % For Municipal Limits11.00

ADD

10 sqm
10 sqm
10 sqm
2.75

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
874.00
per
10
----------- ------------ ------- ---------- --------- --------33 a)

0.15 cum
10 sqm

ADD

Plastering 12mm thick


unit in C.M....1:6 Prop. 10 sqm
(Ground floor)
~~~~~~~~~~~~~
C.M. 1:6 Prop.
1509.63
1 cum
Labour charges as per
557.93
item No.
10 sqm
above

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
784.00
per
10
----------- ------------ ------- ---------- --------- --------b)

(First floor)
unit
..
~~~~~~~~~~~~~
10 sqm
Rate as per item
above
784.37
10 sqm
lift charges + scofolding
55.00
charges
25 % For Municipal Limits 11

10 Sqm
10 sqm
10 sqm
2.75

.
ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
842.00
per
10
----------- ------------ ------- ---------- --------- --------34 a)

0.15 cum
10 sqm

ADD

Plastering 12 mm thick in C.M. 1:8 prop


(Ground floor)
unit
...
10 sqm
~~~~~~~~~~~~~
C.M. 1:8 prop
1245.63
1 cum
labour charges as per
557.93
item no.
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
745.00
per
10
----------- ------------ ------- ---------- --------- --------|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no. 744.77
above
10 sqm
lift charges + scofolding
55.00
charges
25 % For Municipal Limits 11

10 sqm
10 sqm
10 sqm
2.75

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
803.00
per
10
----------- ------------ ------- ---------- --------- --------35 a)

0.11
0.3
0.7
0.5
1

0.04
0.33
0.77
0.50
1.10

ADD

Plastering 12 mm thick in cm 1:5


Prop. 3/8" thick as base, coat and in
C.M. 1:3 prop. 1/8" unit
thick as top
....coat
with dubara sponge finishing etc.
(Ground floor)
~~~~~~~~~~~~~
cum
cost of C.M. 1:5 Prop
1720.83
Mason 1st class
206.00
Mason 2nd class
188.00
Man
Mazdor
146.00
Woman Mazdor
146.00
Top coat 1/8" thick in c.m 1:3 prop
cum
c.m 1:3
2565.63
nos
Mason 1st
206.00
nos
Mason 2nd
188.00
nos
M.m
146.00
nos
W.m
146.00
0
0 961.37 858.74
25 % For Municipal Limits

1
1
1
1
1

cum
each
each
day
day

1
1
1
1
1

cum
no
no
no
no

0 % FOR T.O.T.
Rounding off say

36 a)

10 sqm

Rs.

Rate: Rs.
1365.00
per
10
----------- ------------ ------- ---------- --------- --------Plastering in cement Mortor 20 mm
thick (Ground floor)

0.21
0.66
1.54
0.50
3.2

ADD

Plastering 20 mm thick
unit in C.M.
...
1:3 Prop
~~~~~~~~~~~~~
cum
C.M. 1:3 prop
2565.63
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Nos. Man Mazdor
146.00
Nos. Woman Mazdor
146.00
0
0
965.68
25 % For Municipal Limits

10 sqm

1
1
1
1
1

cum
each
each
day
day

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1746.00
per
10
----------- ------------ ------- ---------- --------- --------|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item no. G.F.
10 sqm
Scofolding charges
10 sqm
LIft charges
0
0
25 % For Municipal Limits

ADD

10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1804.00
per
10
----------- ------------ ------- ---------- --------- ---------

37 a)

Plastering in C.M.1:4
unitprop. 20...mm
thick Ground Floor

10 sqm

0.21 cum
10 sqm

ADD

~~~~~~~~~~~~~
C.M. 1:4 prop.
2037.63
Labour as item no. 1207.10
above

1 cum
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1635.00
per
10
----------- ------------ ------- ---------- --------- --------b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per G.F.
10 sqm
Scofolding + lift charges
0
0
25 % For Municipal Limits 11

ADD

10 sqm

2.75

0 % FOR T.O.T.

Rounding off say

Rs.

Rate: Rs.
1693.00
per
10
----------- ------------ ------- ---------- --------- --------|::
38 a)

0.21 cum
10 sqm

Plastering 20 mm thic in C.M. 1:5 prop.


(Ground floor)
unit
...
10 sqm
~~~~~~~~~~~~~
C.M/ 1:5 prop
1720.83
1 cum
labour charges as per
1207.10
item no. above 10 sqm

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1568.00
per
10
----------- ------------ ------- ---------- --------- --------b)

(First floor)
unit
....
~~~~~~~~~~~~~
10 sqm
Rate as per item no. G.F.
10 sqm
Scofolding + Lift charges
0
0
25 % For Municipal Limits

ADD

10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1623.00
per
10
----------- ------------ ------- ---------- --------- ---------

39 a)

0.21 cum
10 sqm

ADD

Plastering 20 mm thick in C.M. 1:6


prop (Ground floor)unit
...
~~~~~~~~~~~~~
C.M. 1:6 prop
1509.63
Labour charges as per
1207.10
item no.

10 sqm
1 cum
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1524.00
per
10
----------- ------------ ------- ---------- --------- ---------

b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate of ground floor as per item no.
10 sqm
scofolding charges + lift charges
0
0
25 % For Municipal Limits

ADD

10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1579.00
per
10
----------- ------------ ------- ---------- --------- --------|::
40 a)

0.21 cum
10 sqm

ADD

Plastering 20 mm thick
unit in C.M.
... 1:8
prop (Ground floor)
~~~~~~~~~~~~~
C.M. 1:8 prop
1245.63
Labour charges as per
1207.10
item No.

10 sqm

1 cum
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1469.00
per
10
----------- ------------ ------- ---------- --------- --------b)

Plastering 20 mm thick in C.M. 1:8 prop


First floor
unit
..
10 Sqm
~~~~~~~~~~~~~
10 sqm
Rate of ground floor
10 sqm
scofolding + lift charges
0
0
25 % For Municipal Limits

ADD

0 % FOR T.O.T.
Rounding off say

41 a)

0.17
0.3
0.7
0.5
1.8

0.04
0.33
0.77
0.5
1.1

ADD

Rs.

Rate: Rs.
1524.00
----------- ------------ ------- ---------Plastering 20mm thick in
C.M. 1:5 Prop. 16mm thick
and 1:3 prop.4mm thick
unit as ...
10
top coat dubara sponge
finish etc. (Ground floor)
~~~~~~~~~~~~~
Base coat 16mm thick in C.M. 1:5 Prop.
~~~~~~~~~~~~~
cum
C.M. 1:5 prop.
1720.83
1
Mason 1st class
206.00
1
Mason 2nd class
188.00
1
Man
Mazdoor
146.00
1
WomanMazdoor
146.00
1

Top coat 4mm thick in C.M.


1:3 prop.
~~~~~~~~~~~~~
cum
C.M. 1:3 Prop.
2565.63
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Man
Mazdoor
146.00
Nos. Women Mazdoor
146.00
0
0 1078.2 975.54
25 % For Municipal Limits

1
1
1
1
1

per
10
--------- ---------

sqm

cum
each
each
day
day

cum
each
each
day
day

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1615.00
per
10
----------- ------------ ------- ---------- --------- ---------

|::
b)

(First floor)
unit
...
~~~~~~~~~~~~~
10 sqm
Rate as per item above
10 sqm
Scofolding charges 44.00
10 sqm
Lift charges
11.00
25 % For Municipal Limits

ADD

10 Sqm

10 sqm
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1672.00
per
10
----------- ------------ ------- ---------- --------- --------42 a)

10 sqm
2 kgs.

ADD

Impervious coat 20mm thick


in C.M. 1:3 prop. with 1 kg
acco pro compoundunit
per bag ...
of cement and laid when the
slab is green including fine
rendering thread lining etc.
(Ground floor)
~~~~~~~~~~~~~
cost of 20mm thick plastering
in C.M. 1:3 prop as per
item no.
1745.88
impermo compound 24.00

10 sqm

10 sqm
1 kg

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1794.00
per
10
----------- ------------ ------- ---------- --------- ---------

b)

(First floor)
~~~~~~~~~~~~~
10 sqm
cost of 20mm thick plastering
in C.M. 1:3 prop. first floor
item no.
lift charges
11.00
25 % For Municipal Limits11.00

ADD

10 sqm
2.75

Rs.

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1817.00
per
10
----------- ------------ ------- ---------- --------- --------|::
43

Flush pointing to R.R. Masonry in


C.M. 1:3 prop.
unit
...
0.09
0.48
1.12
0.50
1.80

cum
Nos.
Nos.
nos
nos

C.M. 1:3 prop


2565.63
Mason 1st class
206.00
Mason 2nd class
188.00
Man mazdoor
146.00
Women mazdoor
146.00
0
0
645.24
25 % For Municipal Limits

ADD

10 Sqm
1
1
1
1
1

cum
each
each
day
day

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1037.00
per
10
----------- ------------ ------- ---------- --------- --------44

Flush Pointing R.R. Masonry


unit
in C.M. ...
1:4 Prop. 10 sqm
0.09 cum

C.M. 1:4 Prop.

2037.63

1 cum

10.00 sqm

ADD

Labour as per item no.


806.55
above

10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0.00
per
10
----------- ------------ ------- ---------- --------- --------flush Pointing CRS Masonry
unit
in C.M. 1:3
... Prop. 10 Sqm

45

0.06 cum
10 sqm

ADD

cost of C.M. 1:3 prop.


2565.63
Labour charges as per item
no. above
806.55

1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
960.00
per
10
----------- ------------ ------- ---------- --------- --------|::
46

Flush Pointing to CRS Masonry in C.M. 1:4unit


Prop

0.06 cum
10 sqm

ADD

...

C.M. 1:4 Prop


2037.63
Labour charges as per item
no. above
806.55

10 Sqm
1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0.00
per
10
----------- ------------ ------- ---------- --------- ---------

47

Raised pointing to CRS Masonry in C.M. 1:3 Prop.


unit
...
10 Sqm
10 sqm
cost of painting as per
item no. above
1.10 Nos. Mason 2nd class
188.00
1 each
0
0 on
206.80
25 % For Municipal Limits

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
0.00
per
10
----------- ------------ ------- ---------- --------- --------48

Pointingto Rough shabad flooring in C.M. 1:3 Prop


unit
...
10 Sqm
0.02 cum
C.M. 1:3 Prop.
2565.63
1 cum
Labour as per item above
Sundries

ADD

0 % FOR T.O.T.
Rounding off say

49

Rate: Rs.
754.00
----------- ------------ ------- ---------Pointing to rough shabad flooring in C.M. 1:4 prop
unit
...
10
0.02 cum
C.M. 1:4 prop.
2037.63
1
Labour chages as per item
no. above

Rs.
per
10
--------- --------Sqm
cum

Sundries

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
743.00
per
10
----------- ------------ ------- ---------- --------- --------|::
50
0.58
0.5
1.1
0.5
1.8

ADD

Pointing to polished shabad flooring with cement putty


unit
...
10 Sqm
bags
220.00
1 bag
Nos. Mason 1st class
206.00
1 each
Nos. Mason 2nd class
188.00
1 each
Nos. Man Mazdoor
146.00
1 day
Nos. Woman Mazdoor
146.00
1 day
0
0 on
645.6
25 % For Municipal Limits

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
935.00
per
10
----------- ------------ ------- ---------- --------- --------51

P.C.C. 1:2:4 prop. 2" thick flooring using 3/4"


to 1/4" greage metal machine crushed including
1/2" thick plastering in C.M. 1:3 prop. including
fine rendering, thread lining etc. complete
unit
...
10 Sqm
C.C. 1:2:4 prop. as per
0.38 cum
item no. above
4034.62
1 cum
10 sqm
Plastering 1:3 prop 12mm
thick as per item no 942.77
10 sqm

Rounding

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2476.00
per
10
----------- ------------ ------- ---------- --------- --------52

Flooring with rough shabad stone 1.5"


thick (38.1 mm) blue tandur set over
3/4" thick bed mortor 1:6 prop. and
pointing to slabs inunit
CM1:3 prop
...
10 Sqm
10.5 sqm
0.12
0.02
10
0.96
2.24
2.2
1.1

ADD

cost of 1/5" thick shabad


807.80
stone Tandur Blue
cum
C.M. 1:6 prop
1509.63
sqm
Pointing in C.M. 1:32565.63
prop.
as per item no.
labour charges for pointing
645.24
Nos. Mason 1st class
206.00
Nos. Mason 2nd class
188.00
Nos. Man Mazdoor
146.00
Nos. Woman Mazdoor
146.00
0
0 on
1100.68
25 % For Municipal Limits

10 sqm
1 cum
1 cum
10
1
1
1
1

Sqm
each
each
each
each

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
3102.00
per
10
----------- ------------ ------- ---------- --------- --------|::
53

Flooring with rough shabad stone 1.5" ( 1 1/2" )


thick Tandur Blue or 3/4" bed mortor
in C.M. 1:8 prop. and pointing in C.M.

1:3 prop.etc. complete


unit
10.5 sqm
0.21 cum
10 sqm
0.02 CUM
10

ADD

...

10 Sqm

cost of stone
0.00
C.M. 1:8 prop
1245.63
Labour for 10 sqm as
1375.85
per
item no. above
Pointing 10 sqm in C.M.
2565.63
1:3
prop.
labour charges for pointing
645.24
Sundries

10 sqm
1 cum
10 sqm
1 cum
10 Sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
2334.00
per
10
----------- ------------ ------- ---------- --------- --------54

Flooring with polished shabad stone


(Tandur Blue) 1" thick or 3/4"
thick mortor in C.M. 1:6 Prop. and
Pointing slabs with putty etc.
complete
unit
...
10.10 Sqm
0.12 cum
15 kgs
0.05 cum

10 sqm

ADD

Cost of stone
0.00
cost of bed mortor 1:6
Prop. 3/4" thick
1509.63
cost of cement
220.00
CM1:3 pointing
2565.63
Labour charges for cutting
and laying as per item
No.49 above
1375.85
Add sundries

0 % FOR T.O.T.

10 Sqm
10 Sqm
1 cum
50 kgs
1 cum

10 sqm

Rounding off say

Rs.

Rate: Rs.
1751.00
per
10
----------- ------------ ------- ---------- --------- --------|::
55

10.10
0.12
15
0.05
10

ADD

Flooring with polished shabad stone 1"


thick Tandur blue 3/4" thick bed Mortor
1:8 Prop. and Pointing withunit
cement ...
etc. complete
Sqm cost of stone
0.00
cum
bed mortar 1:8 Prop.
1245.63
3/4"
kgs
cement
220.00
cum
pointing with cement2565.63
putty
(as item 47 above)
sqm
labour as per item No.51
1375.85
above
Add sundries L.S.

10 Sqm
10
1
50
1

sqm
cum
kgs
cum

10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1720.00
per
10
----------- ------------ ------- ---------- --------- --------56

10.10
0.12
15.00
0.05

Polished shabad stone flooring 1"


thick tandur blue for threads
and riser of stairs setover 1/4"
thick bed Mortor 1:4 Prop. and
pointing slabs with cement unit
pretty
...
including laying etc. complete
sqm
Cost of stone
0.00
cum
Cost of Bed Mortar 1:4
2037.63
kgs
cement for joints
220.00
Add 10% extra for threads & rises
0.00on
cum
cost of pointing with2565.63
cement pretty

10 Sqm
10 sqm
1 cum
50 kgs
1 cum

10 sqm
11 RM

ADD

Labour for laying 1375.85


Flat nosing by machine7.00
crutting
Sundries L.S.

10 sqm
1 Rm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
1892.00
per
10
----------- ------------ ------- ---------- --------- --------|::
57

10.10
0.15
10
0.05
80

ADD

Polished shabad stone skirting


with 1" thick Tandur Blue 5"
height set over 1/2" thick bed
Mortor 1:4 Prop. including
pointing with cement pretty, flat
nasing with machine crutting
unit
...
etc. complete.
sqm
cost of stone
0.00
cum
Cost of c.m 1:4 prop2037.63
12mm thick
sqm
Labour for laying 1375.85
kgs
pointing with cement2565.63
putty
RM
cost of flat nosing
7.00

10 Sqm
10 sqm
1 cum
10 sqm
50 kgs
1 Rm

0 % FOR T.O.T.

For one Rm
Rounding Rs.
off say

28.05 / 1 Rmt.

28.00 / 1 Rmt.
-----------Rate: Rs.
28.00
per
1 Rmt.
----------- ------------ ------- ---------- --------- ---------

58

Damp proof coarse 50 mm thick with


CC 1:2:4 prop normal mix by volume
using 20 mm grade machine
Crushed metal appling acco proof compound
for top of cement 1:5 prop 20
unitmm thick
...
0.5 cum
c.c. 1:2:4 prop.
4034.62
10 sqm
20mm plastering 1:51568.47
prop.
1.5 kgs
Acco proof compound24.00
sundries

ADD

10
1
10
1

sqm
cum
sqm
kg

0 % FOR T.O.T.
Rounding off say

59

0.5
10.00
32
10
10

ADD

Rate: Rs.
3622.00
----------- ------------ ------- ---------Refinforced cement mortor Facia/Fire/
drop/Pardah wall 50mm thick with C.M.
1:3 Prop. and Mild steel 6mm dia at
150mm centres in both directions with
Rabit wire mesh including cost and
conveyance of all materials labour
and all operational charges, such as
centering mixing, laying,plastering and
finishing curing etc.
unit
...
10
cum
C.M. 1:3 prop
2565.63
1
sqm
Rabbit wire mesh
12.00
1
kgs
steel
52.75
1
sqm
labour charges
180.00
1
sqm
Centering charges 102.00
1

Rs.
per
10
--------- ---------

sqm
cum
sqm
kg
sqm
sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
5911.00
per
10
----------- ------------ ------- ---------- --------- --------Shelves/Racks as per drawing including
plastering both sides in C.M. 1:4 Prop.
finished smooth
unit
...
10 sqm

60

10.00 sqm
ADD

Rate as per item 59


0 % FOR T.O.T.
Rounding off say

Rate: Rs.
5911.00
----------- ------------ ------- ---------Filling the basement with Gravel to
a lead of 6 Kms cost and conveyance
of materials, watering, tamping etc.
complete.
unit
...
1
1 cum
cost of gravel
288.63
1
1 cum
cost of labour for filling,watering,tamping
14.00
1
0
0
25 % For Municipal Limits14.00
3.5

61

ADD

per
10
--------- ---------

cum
cum
cum

0 % FOR T.O.T.
Rounding off say

62

Rs.

Rs.

Rate: Rs.
292.00
per
1
----------- ------------ ------- ---------- --------- --------Synthetic Enamel Painting
Synthetic Enamel paint 2 coats over a
coat of primer coat (3 coats in all)
with approved brand & shade, cost of
materials and labour charges etc.
complete.to new wood
unit work...
10 Sqm

1.2
0.6
0.7
1.2

lts
Ltrs.
Nos.
Nos.

Synthetic ENAMEL Paint


175.00
cost of wood primer 121.00
painter for Primer 1st193.40
painter for painting 2nd
193.40

1
1
1
1

litre
litre
No.
No.

0
0
367.46
25 % For Municipal Limits

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
742.00
per
10
----------- ------------ ------- ---------- --------- --------Synthetic Enamel Paint (two)
unit2 coats ...
10 Sqm

63

1.20 lts
1.20 nos

ADD

Enamel paint
175.00
Painter
193.40
0%
0 on
232.08
25 % For Municipal Limits

1 lts
1 no

0 % FOR T.O.T.
Rounding off say

64

Rs.

Rate: Rs.
500.00
per
10
----------- ------------ ------- ---------- --------- --------Syntetic enamel paint single
unit
coat
...
10 Sqm
0.70 Lts
0.70 nos

Enamel paint
175.00
Painter 1st class
193.40
0
0 on
135.38
25 % For Municipal Limits

1 lts
1 nos

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
292.00
per
10
----------- ------------ ------- ---------- --------- --------Snowcem paint to walls-

65

3.50
0.50
0.50
1.00

Snowcem paint 3 coats including 1 coat of primer coat


including cost of all materials and labour charges etc
complete
unit
...
10 Sqm
Kgs
cost of cement paint 38.00
1 kg
nos
painter
193.40
1 no
no
M.m
146.00
1 no
no
W.m
146.00
1 no

2.00 kgs
0.50 no

ADD

Surya cement
7.12
Painter
193.40
0
0 426.64 412.40
25 % For Municipal Limits

0 % FOR T.O.T.
Rounding off say

66

3.50
0.50
0.50
1.00

1 kg
1 no

Rs.

Rate: Rs.
663.00
per
10
----------- ------------ ------- ---------- --------- --------Snowcem paint two coats including cost of all materials
labour charges etc complete
unit
...
10 Sqm
kgs
cement paint
38.00
1 kg
no
Painter
193.40
1 no
no
M.m
146.00
1 no
no
W,m
146.00
1 no
0
0
315.70
25 % For Municipal Limits

ADD

0 % FOR T.O.T.
Rounding off say

67

2.00
0.30
0.50
1.00

ADD

Rate: Rs.
528.00
Snowcem painting single coat including cost of all
materials labour charges etc complete
unit
...
10 Sqm
kgs
cement paint
38.00
1
nos
painter
193.40
1
nos
M.m
146.00
1
nos
W.m
146.00
1
0
0
277.02
25 % For Municipal Limits

Rs.
per

10

kg
no
no
no

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
422.00
per
10
----------- ------------ ------- ---------- --------- --------68

1.70
1.20
1.00
0.3

ADD

Oil bound distemper two coats over one coat of primer


including cost of materials and labour charges etc
complete
unit
...
10 Sqm
lts
Oil bound distemper 77.00
1 no
no
Painter
193.40
1 no
Ltr
cost of OBD primerB401
69.00
1 sqm
Nos
painter for primer coat
142.70
1 no
25 % For Municipal Limits

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
475.00
per
10
----------- ------------ ------- ---------- --------- --------|::
69

Oil bound distemper two coats including cost of


materials etc complete
unit
...
10 Sqm
1.70 lts
Oil bound distemper 77.00
1 lts
1.20 nos
Painter
193.40
1 no
25
0 % For Municipal
on
Limits
232.08

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
421.00
per
10
----------- ------------ ------- ---------- --------- --------70

Oil bound distemper single coat


unit
...
1.00 lts
Oil bound distemper 77.00
0.7 no
Painter
193.40
0
0 on
135.38
25 % For Municipal Limits

ADD

10 Sqm
1 no
1 no

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
246.00
per
10
----------- ------------ ------- ---------- --------- --------71

Watert bound distemper two coats over one of


primer including cost of materials and labour
charges etc complete
unit
...
10 Sqm
1.34 kgs
dry distemper B378 30.00
1 kg

0.50
0.50
0.80
10.00

ADD

nos
no
no
sqm

Painter
193.40
M.m
146.00
W.m
146.00
costing of one coat whiting
80.98
0
0 on
286.5
25 % For Municipal Limits

1
1
1
10

no
no
no
sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
479.00
per
10
----------- ------------ ------- ---------- --------- --------72

Water bound distemper two coats


unit
...
10.00 sqm
cost for three coats
10.00 sqm
deduct for whiting coat

ADD

10 Sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
398.00
per
10
----------- ------------ ------- ---------- --------- --------|::
73

Water bound distemper single coat


unit
...
0.85 kgs
distemper
30.00
0.30 no
Painter
193.40
0.80 no
M.m
146.00
0
0 on
174.82
25 % For Municipal Limits

ADD

0 % FOR T.O.T.

10 Sqm
1 kg
1 no
1 no

Rounding off say

74
2
0.11
0.03
0.19

ADD

Rs.

Rate: Rs.
244.00
----------- ------------ ------- ---------Janathacem single coat with white cement
unit
...
10 Sqm
kgs
Janathacem
7.12
1
nos
Painter
193.40
1
no
M.m
146.00
1
no
W.m
146.00
1
0
0 on
53.39
25 % For Municipal Limits

per
10
--------- ---------

kg
no
no
no

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
81.00
per
10
----------- ------------ ------- ---------- --------- --------75

Colour janatha cem single coat


unit
...
10 Sqm
10 sqm
janathacem single coat
80.98
10 sqm
Add for colour
25% of cost

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
101.00
per
10
----------- ------------ ------- ---------- --------- --------76

Janathacem two coats


unit
3.50 kgs
Janatha cem
0.16 no
Painter

...
7.12
193.40

10 Sqm
1 kg
1 no

0.05 no
0.27 no

ADD

M.m
W,m

146.00
146.00
0
0 on
77.66
25 % For Municipal Limits

1 no
1 no

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
122.00
per
10
----------- ------------ ------- ---------- --------- --------|::
77

Colour janathacem two coats


unit
...
10 sqm
Janathacem two coats
Add 25% for colour

ADD

10 Sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
153.00
per
10
----------- ------------ ------- ---------- --------- ---------

79

S&F 4 mm thick plain glass including removing old putty


and providing fresh putty with necessary clips etc complete
unit
...
1 Sqm
1 sqm
cost of 4 mm thick plain
334.00
glass
1 sqm
10 Add 10% for wastage
2.2 kgs
shalimar putty
36.00
1 kg
1 sqm
Labour for fixing glass40.00
1 sqm

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
487.00
per
1 sqm
----------- ------------ ------- ---------- --------- --------|::
80

S&F 4 mm pin headed glass of approved design


including cost of putty etc complete.
unit
1sqm
1 sqm

ADD

rate for plain glass


deduct differance for plain glass & pin headed glass
deduct on wastage also

0 % FOR T.O.T.
Rounding off say

81

Rs.

Rate: Rs.
373.00
per
1sqm
----------- ------------ ------- ---------- --------- --------S&Fbest teak wood door frame of any size with 5" x
2.5" using best teak wood scantlings including cost
of 6 nos z hold fasts and bituminous coat on masonary side
including cost of materials and labour charges etc
complete
unit
...
1 Sqm
Data for a frame of size 3-6 *7-0= 24.5 sft or 2.27 sqm
Teak wood scantling required
verticals 2* 5" *2.5" *7-0= 1.234 cft
h0rizantal 1*5" *2.5" *3-6= 0.308cft
------------------total
OR
=== 0.0437
1.542cft
CUM
------------------0.044 CUM cost of teak wood
75194
6.00 nos
z hold fasts
8.00
18 nos
screws 1" long
0.50

1 CUM
1 no
1 no

2.27 sqm

labour charge @30%114.90

3421.22
1sqm== ----------2.27 sqm

= 1507.15 /

1 sqm

1 Sqm

Rounding off say

Rs.

Rate: Rs.
1507.00
per
1
----------- ------------ ------- ---------- --------- ---------

82

VRCC ( 1:1.5:3 ) prop. corresponding to M20 grade using 20mm to 6mm size
graded ( 60% of 20mm metal, 15% of 12mm metal,15% of 10mm metal,10%
of 6mm metal ) HBG / machine crushed metal as per SS 108 with necessory
reinforcement including cost and conveyance of all materials and water to
work site,seigniorage and all operational incidental, labour charges such as
centering,form work,mixing concrete,laying,vibrating,curing etc.,complete for
finished item of work as per SS403 but excluding cost of reinforcement steel
and its fabrication charges etc.,complete and as directed by the deparment.

a)

RCC lintels,Plinth beems & cuvert


slabs less than 3mt span unit
...
cost of CC 1:1 1/2 : 3 Prop. as
1 cum
per item No.7 above4523.02
1 cum
cost of centering charges
1071.00
1 cum
vibrating charges
43.00
sundries

ADD

1 cum
1 cum
1 cum
1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
5637.00
per
1
----------- ------------ ------- ---------- --------- ---------

83 a)

R.C.C. Footings
1 cum
1 cum
1 cum

ADD

unit
...
cost of CC 1:1 1/2 : 4523.02
3
cost of centering
715.00
vibration charges
43.00
sundries

1 cum
1 cum
1 cum
1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
5281.00
per
1
----------- ------------ ------- ---------- --------- --------R.C.C. Pedastals
unit
...
1 cum
1 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum
1 cum
cost of centering
963.00
1 cum
1 cum
vibration charges
43.00
1 cum
sundries

84 a)

ADD

0 % FOR T.O.T.
Rounding off say
Rate: Rs.
5529.00
R.C.C. Columns
unit
...
1 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum
cost of centering 1587.00
1 cum
vibration charges
43.00
sundries

85 a)

ADD

0 % FOR T.O.T.

Rs.
per

1 cum
1 cum
1 cum
1 cum

Rounding off say

Rs.

Rate: Rs.
6153.00
per
1
----------- ------------ ------- ---------- --------- ---------

86 a)

R.C.C. 'L' beams,'T' Beams


rectangular beamsunit
...
1 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum
cost of centering 1509.00
1 cum
vibration charges
43.00
sundries

ADD

1 cum
1 cum
1 cum
1 cum

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
6075.00
per
1
----------- ------------ ------- ---------- --------- --------b)

First floor ....1 cumunit


...
1 cum
Rate of ground floor6075.02
1 cum
Lift Charges
55.00
25 % For Municipal Limits55.00

ADD

1 cum

0 % FOR T.O.T.
Rounding off say

87 a)

1 cum
1 cum
13.75

Rs.

Rate: Rs.
6133.00
per
1
----------- ------------ ------- ---------- --------- --------RCC roof slab 100mm thick
1:1 1/2:3 Prop. unit
...
10 sqm
1 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum

10 sqm
1 cum

ADD

cost of centering 1690.00


cost of vibration charges
43.00
sundries

10 sqm
1 cum

0 % FOR T.O.T.
Rounding off say
Rate: Rs.
6256.00
----------- ------------ ------- ---------First Floor ....10 sqm
1 cum
Ground Floor
6256.02
1
1 cum
Lift charges
55.00
1
25 % For Municipal Limits55.00
13.75

b)

ADD

per
10
--------- --------cum
cum

0 % FOR T.O.T.
Rounding off say

88 a)

Rs.

Rs.

Rate: Rs.
6325.00
per
10
----------- ------------ ------- ---------- --------- --------RCC roof slab 115mm 4.5"
thick 1:1 1/2:3 Prop.
unit
...
10 sqm
1.15 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum
10 sqm
centering charges 1690.00
10 sqm
1.15 cum
vibration charges
43.00
1 cum
Rounding

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
6941.00
per
10
----------- ------------ ------- ---------- --------- ---------

b)

First Floor ..... 10 Sqm


1 cum
Rate of ground floor6940.93
1 cum
Lift charges
55.00
25 % For Municipal Limits55.00

ADD

1 cum
1 cum
13.75

0 % FOR T.O.T.
Rounding off say

89 A)

Rs.

Rate: Rs.
7010.00
per
10
----------- ------------ ------- ---------- --------- --------RCC roof slab 5" thick
unit (125mm)
...
10 sqm
1.25 cum
cost of CC 1:1 1/2 : 4523.02
3
1 cum
10 sqm
centering charges 1690.00
10 sqm
1.25 cum
vibration charges
43.00
1 cum
Sundries

ADD

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
7398.00
per
10
----------- ------------ ------- ---------- --------- --------b)

(First floor)
1 cum
1 cum

ADD

...

Ground floor rate 7397.53


Lift charges
55.00
25 % For Municipal Limits55.00

10 sqm
1 cum
1 cum
13.75

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
7466.00
per
10
----------- ------------ ------- ---------- --------- ---------

|::
90

RCC roof slab 6" thick (150mm)


unit
1:2:4 prop
1.50 cum
10 sqm
1.50 cum

ADD

...

cost of CC 1:1 1/2 : 4523.02


3
centering charges 1690.00
vibration charges
43.00
Sundries

10 sqm

1 cum
10 sqm
1 cum

0 % FOR T.O.T.
Rounding off say

Rate: Rs.
8539.00
per
10
----------- ------------ ------- ---------- --------- --------RCC sunshades or chajja of any size
and average 2" thick 1/2" platering
in CM 1:5 prop. as base coat and
in CM 1:3 1/8" thick as finishing
coat including dubara finishing etc
complete
Data for 10 Sqm

91

0.5 cum
cost of CC 1:1 1/2 : 4523.02
3
1 sqm
centering
138.00
20.75 Plastering 2 coats
1365.34
Sundries

ADD

1 cum
1 sqm
10 sqm

0 % FOR T.O.T.
Rounding off say

92

Rs.

Rs.

Rate: Rs.
5233.00
per
10
----------- ------------ ------- ---------- --------- --------RCC facia average 2" thick with

1/2" thick plastering in CM 1:5


prop and 1:3 prop dubara sponge
finish etc
0.05 cum
2 sqm
1.04 sqm

ADD

cost of CC 1:1 1/2 : 4523.02


3
centering charges 1690.00
plastering double coats
1365.34
Sundries

1 cum
10 sqm
10 sqm

0 % FOR T.O.T.
Rounding off say

Rs.

Rate: Rs.
706.00
per
1
----------- ------------ ------- ---------- --------- ---------

ments FOR THE YEAR 2008-200

ts FOR THE YEAR 2008-200

375.00

281.25

164.06
--------------820.31
0.00
820.00
--------------cum

140.00

35.00
--------------175.00
0.00
175.00
--------------cum

375.00
1060.00
--------------1435.00
0.00
1435.00
--------------cum

288.63
14.00
3.50
--------------306.13
0.00
306.00
--------------cum

303.63
14.00
3.50

--------------321.13
0.00
321.00
--------------cum

and bending to
ks of approved
or reinforcement
me of execution
wastages such
ing wire, cover
utting, bending
( payment will
nly )as directed

41.50
9.00
2.25
--------------52.75
0.00
52.75
--------------Kg

418.63
2112.00
28.00
7.00
--------------2565.63
---------------

418.63
1584.00
28.00
7.00
--------------2037.63
---------------

418.63
1267.20
28.00
7.00
--------------1720.83
---------------

418.63
1056.00
28.00
7.00
--------------1509.63
---------------

418.63
792.00
28.00
7.00
--------------1245.63
---------------

418.63
633.60
28.00
7.00
--------------1087.23
---------------

835.80
192.57
583.00
12.36
26.32
262.80
204.40
126.47
--------------2243.72
0.00
2244.00
--------------cum

835.80
192.57
728.20
12.36
26.32
262.80
204.40
126.47
--------------2388.92
0.00
2389.00

--------------cum

835.80
192.57
972.40
12.36
26.32
262.80
204.40
126.47
--------------2633.12
0.00
2633.00
--------------cum

1221.95
192.57
1456.40
45.00
24.72
52.64
306.60
511.00
223.74
---------------

4034.62
0.00
4035.00
--------------cum

1221.95
192.57
1944.80
45.00
24.72
52.64
306.60
511.00
223.74
--------------4523.02
0.00
4523.00
--------------cum

1221.95
192.57
970.20
45.00

24.72
52.64
306.60
511.00
223.74
--------------3548.42
0.00
3548.00
--------------cum

0.00
423.51
111.24
236.88
204.40
204.40
189.23
--------------1369.66
0.00
1370.00
--------------cum

0.00
513.27

111.24
236.88
204.40
204.40
189.23
--------------1459.42
0.00
1459.00
--------------cum

0.00
585.08
111.24
236.88
204.40
204.40
189.23
--------------1531.23
0.00
1531.00
--------------cum

0.00
692.79
111.24
236.88

204.40
204.40
189.23
--------------1638.94
0.00
1639.00
--------------cum

0.00
872.31
111.24
236.88
204.40
204.40
189.23
--------------1818.46
0.00
1818.00
--------------cum

0.00
0.00
398.60

154.50
329.00
204.40
204.40
223.08
--------------1513.98
0.00
1514.00
--------------cum

0.00
0.00
483.08
154.50
329.00
204.40
204.40
223.08
--------------1598.46
0.00
1598.00
--------------cum

0.00
0.00
550.67
154.50
329.00
204.40
204.40
223.08
--------------1666.04
0.00
1666.00
--------------cum

0.00
0.00
652.04
154.50
329.00
204.40
204.40
223.08
--------------1767.42
0.00
1767.00

--------------cum

0.00
0.00
821.00
154.50
329.00
204.40
204.40
223.08
--------------1936.38
0.00
1936.00
--------------cum

1798.78
513.13
86.52
184.24
102.20
306.60

169.89
--------------3161.36
0.00
3161.00
--------------cum

3161.36
46.00
40.00
11.50
~~~~~~~~~~
3258.86
0.00
3259.00
--------------cum

1798.78

407.53
86.52
184.24
102.20
306.60

169.89
--------------3055.76
0.00
3056.00
--------------cum

3055.76
46.00
40.00
--------------3141.76
11.50
0.00
3153.26
3153.00
--------------cum

1798.78

344.17
849.45
____________
2992.40
0.00
2992.00
--------------cum

2992.40
46.00
40.00
11.50
3089.90
0.00
3089.90
3090.00
--------------cum

1798.78
301.93
849.45
---------------

2950.16
0.00
2950.00
--------------cum

2950.16
46.00
40.00
11.50
3047.66
0.00
3048.00
--------------cum

1798.78
249.13
849.45
--------------2897.36
0.00
2897.00
--------------cum

2897.36
46.00
40.00
--------------2983.36
11.50
0.00
2994.86
2995.00
--------------cum

360.40
76.78
--------------437.17
0.00
437.00
--------------sqm

371.51
76.78

--------------448.29
0.00
448.00
--------------sqm

348.36
76.78
--------------425.13
0.00
425.00
--------------sqm

358.16
76.78
--------------434.94
0.00

435.00
--------------sqm

384.84
67.98
144.76
73.00
160.60
111.59
--------------942.77 / 10 SqM
0.00
943.00
--------------SQM

942.77
44.00
11.00
2.75
997.77 / 10 SqM
0.00
998.00
---------------

SQM

305.64
557.93
--------------863.57 / 10 SqM
0.00
864.00
--------------SQM

863.57
55.00
921.32 / 10 SqM
0.00
921.00
--------------SQM

258.12
557.93

--------------816.05 / 10 SqM
0.00
816.00
--------------SQM

816.05
55.00
873.80 / 10 SqM
0.00
874.00
--------------SQM

226.44
557.93

--------------784.37 / 10 SqM
0.00
784.00
---------------

SQM

784.37
55.00
842.12 / 10 SqM
0.00
842.00
--------------SQM

186.84
557.93
--------------744.77 / 10 SqM
0.00
745.00
--------------SQM

744.77
55.00
---------------

802.52 / 10 SqM
0.00
803.00
--------------SQM

189.29
61.80
131.60
73.00
146.00

102.63
67.98
144.76
73.00
160.60
214.69
--------------1365.34 / 10 SqM
0.00
1365.00
--------------SQM

538.78
135.96
289.52
73.00
467.20
241.42
--------------1745.88 / 10 SqM
0.00
1746.00
--------------SQM

1745.88
44.00
11.00
2.75
___________
1803.63 / 10 SqM
0.00
1804.00
--------------SQM

427.90
1207.10
__________
1635.00 / 10 SqM
0.00
1635.00
--------------SQM

1635.00
55.00
0.00
2.75
1692.75 / 10 SqM
0.00
_____________

1693.00
--------------SQM

361.37
1207.10
--------------1568.47 / 10 SqM

0.00
1568.00
--------------SQM

1568.47
55.00
0.00
2.75
1623.47 / 10 SqM
0.00
1623.00
--------------SQM

317.02
1207.10
--------------1524.12 / 10 SqM
0.00
1524.00
--------------SQM

1524.12
55.00
0.00
2.75
1579.12 / 10 SqM
0.00
1579.00
--------------SQM

261.58
1207.10
--------------1468.68 / 10 SqM
0.00
1469.00
--------------SQM

1468.68
55.00
0.00
2.75

1523.68 / 10 SqM
0.00
1524.00
--------------SQM

292.54
61.80
131.60
73.00
262.80

102.63
67.98
144.76
73.00
160.60
243.89
--------------1614.59 / 10 SqM
0.00
1615.00
--------------SQM

1614.59
44.00
11.00
2.75
__________
1672.34 / 10 SqM
0.00
1672.00
--------------SQM

1745.88
48.00
--------------1793.88 / 10 SqM
0.00
1794.00
--------------SQM

1803.63
11.00
1817.38 / 10 SqM
0.00
1817.00
--------------SQM

230.91
98.88
210.56
73.00
262.80
161.31
--------------1037.46 / 10 SqM
0.00
1037.00
--------------SQM

183.39

806.55

--------------989.94 / 10 SqM
0.00
990.00
--------------SQM

153.94
806.55
--------------960.49 / 10 SqM
0.00
960.00
--------------SQM

122.26
806.55
--------------928.81 / 10 SqM
0.00
929.00

--------------SQM

960.49
206.80
51.70
1218.99 / 10 SqM
0.00
1219.00
--------------SQM

51.31
806.55
--------------857.86 / 10 SqM
0.00
858.00
--------------SQM

40.75
806.55

--------------847.30 / 10 SqM
0.00
847.00
--------------SQM

127.60
103.00
206.80
73.00
262.80
161.40
--------------934.60 / 10 SqM
0.00
935.00
--------------SQM

1533.16
942.77

--------------2475.93 / 10 SqM
0.00
2476.00
--------------SQM

848.19
181.16
51.31
645.24
197.76
421.12
321.20
160.60
275.17
--------------3101.75 / 10 SqM
0.00
3102.00
--------------SQM

0.00
261.58
1375.85
51.31
645.24
--------------2333.98 / 10 SqM
0.00
2334.00
--------------SQM

0.00
181.16
66.00
128.28

1375.85
--------------1751.29 / 10 SqM
0.00

1751.00
--------------SQM

0.00
149.48
66.00
128.28
1375.85

--------------1719.61 / 10 SqM
0.00
1720.00
--------------SQM

0.00
244.52
66.00
0.00
128.28

1375.85
77.00

--------------1891.65 / 10 SqM
0.00
1892.00
--------------SQM

0.00
305.64
1375.85
2.57
560.00
--------------2244.06
0.00
--------------2244.00

2017.31
1568.47
36.00
--------------3621.79 / 10 SqM
0.00
3622.00
--------------SQM

1282.82
120.00
1688.00
1800.00
1020.00
--------------5910.82 / 10 SqM
0.00
5911.00

--------------SQM

5910.82
0.00
5911.00
--------------SQM

288.63
14.00
0.00
292.13 / 1
0.00
292.00
--------------CUM

cum

210.00
72.60
135.38
232.08
91.87
--------------741.93 / 10 SqM
0.00
742.00
--------------SQM

210.00
232.08
58.02
____________
500.10 / 10 SqM
0.00
500.00
--------------SQM

122.50
135.38
33.85
____________
291.73 / 10 SqM

0.00
292.00
--------------SQM

133.00
96.70
73.00
146.00
14.24
96.70
103.10
______________
662.74 / 10 SqM
0.00
663.00
--------------SQM

133.00
96.70
73.00
146.00
78.93
__________
527.63 / 10 SqM

0.00
528.00
--------------SQM

76.00
58.02
73.00
146.00
69.26
___________
422.28 / 10 SqM
0.00
422.00
--------------SQM

130.90
232.08
69.00
42.81
68.7225
474.79 / 10 SqM
0.00
475.00
---------------

SQM

130.90
232.08
58.02
__________
421.00 / 10 SqM
0.00
421.00
--------------SQM

77.00
135.38
33.85
__________
246.23 / 10 SqM
0.00
246.00
--------------SQM

40.20

96.70
73.00
116.80
80.98
71.63
__________
479.31 / 10 SqM
0.00
479.00
--------------SQM

479.31
80.98
__________
398.33 / 10 SqM
0.00
398.00
--------------SQM

25.50
58.02
116.80
43.71
__________
244.03 / 10 SqM
0.00

244.00
--------------SQM

14.24
21.27
4.38
27.74
13.35
__________
80.98 / 10 SqM
0.00
81.00
--------------SQM

80.98
20.25
__________
101.23 / 10 SqM
0.00
101.00
--------------SQM

24.92
30.94

7.30
39.42
19.42
__________
122.00 / 10 SqM
0.00
122.00
--------------SQM

122.00
30.50
__________
152.50 / 10 SqM
0.00
153.00
--------------SQM

334.00
33.40
79.20
40.00

__________
486.60 1sqm

0.00
487.00
---------------

486.60
114.00
__________
372.60
0.00
373.00
---------------

3285.98
48.00
9.00

78.25

--------------3421.22
----------------

1507.00
--------------SQM

g 20mm to 6mm size


of 10mm metal,10%
108 with necessory
terials and water to
ur charges such as
ng etc.,complete for
reinforcement steel
by the deparment.

4523.02
1071.00
43.00
--------------5637.02 / CUM
0.00
5637.00
--------------CUM

4523.02
715.00
43.00
--------------5281.02 / CUM
0.00
5281.00
--------------CUM

4523.02
963.00
43.00
--------------5529.02 / CUM
0.00
5529.00
--------------CUM

4523.02
1587.00
43.00
--------------6153.02 / CUM
0.00

6153.00
--------------CUM

4523.02
1509.00
43.00
--------------6075.02 / CUM
0.00
6075.00
--------------CUM

6075.02
55.00
13.75 / CUM
0.00
6143.77
--------------CUM

4523.02

1690.00
43.00
--------------6256.02 / 10 SqM
0.00
6256.00
--------------SQM

6256.02
55.00
13.75 / 10 SqM
0.00
6324.77
--------------SQM

5201.48
1690.00
49.45
--------------6940.93 / 10 SqM
0.00
6941.00
--------------SQM

6940.93
55.00
13.75 / 10 SqM
0.00
7009.68
--------------SQM

5653.78
1690.00
53.75
--------------7397.53 / 10 SqM
0.00
7398.00
SQM

7397.53
55.00
13.75 / 10 SqM
0.00
7466.28
--------------SQM

6784.53
1690.00
64.50
--------------8539.03 / 10 SqM
0.00
8539.00
--------------SQM

2261.51
138.00
2833.08
--------------5232.60 / 10 SqM
0.00
5233.00
--------------SQM

226.15
338.00
142.00
--------------706.15 / 1 SqM
0.00
706.00
--------------SQM