Project Design Documentation Check List Instructions

This is a draft document for use on Design-Build projects. As WSDOT works through Design-Build projects areas will be completed or revised as needed. Project team input on the development and use of this document is critical for it to be a useful tool on projects. The check list includes all the documentation required by the Design Manual for Design-Build Projects for both the Design Documentation Package (DDP) and the Project File (PF). The DDP is a permanent record of the design documents and decisions. It is submitted to the region for approval and archived for 75+ years. The Project File is kept in the Project Office and contains all documentation and data (such as quantity calcs, reports, correspondence) required for the project. The check list is based on the Design Manual for Design_Build Projects documentation requirements. The purpose of the checklist is to ensure that all applicable design elements are properly addessed in the project. It will also assist reviewers or other designers in locating information and determining what design decisions have been made. This check list will be used for Process and Stewardship reviews. Some chapters have supplemental check lists either for documentation requirements (3) or design parameters (3). Each supplemental chapter checklist can be accessed by clicking on the notation provided. Chapters with supplemental documentation requirement check lists are 210, 240, and 1300. Regions have developed the supplemental design parameter check lists for the specialty projects covered in Chapters 915, 1020, and 1060. Description - The Project Design Check List is organized to match the Design Manual for Design-Build Projects Chapters. Reference - This column gives the Design Manual for Design-Build Projects chapter or resources to refer to for criteria or requirements. Status - Review all items, referring to the appropriate matrix to determine whether the item is applicable for the project. Enter date, "completed" or "NA" for each item. If all the items in a chapter or division are not applicable, it can be hidden by pressing the "-" button on the left side-and then enter NA in the heading. When and By Whom - Identifies at what phase and who is responsible for documentation Remarks - List where the information can be found in the Design Documentation Package (DDP) or Project File (PF).

The shaded chapters are areas that the check list can be used as the documentation, when using this option include the checklist in the DDP
DESIGN ELEMENT - Items that relate to the matrix columns DESIGN MANUAL Reference - The chapter or figure in the Design Manual that establishes the criteria for this design element. MATRIX REQUIREMENT - Enter the design level from the appropriate matrix (F, M, B, EU/M, etc.) EXISTING/STANDARD/DETERMINATION - List the design criteria/describe the existing condition/list what the project will provide.
To use this file, download it to your PC or local server. Prepare and print an applicable set of documentation for each project in progress.

Revised May, 2004

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

Div. 2 - Hearings, Environ., & Permits


Public Involvement and Hearings
PF Public and/or other agency input for Plans, affidavits, and access report go to Public Involvement Plan Study Plan Notice of Opportunity for a hearing Affidavit of Publication of access hearing notice Access Hearing plans Hearing Summary Environmental hearing summary Justification to abandon an existing corridor Corridor hearing summary Design hearing summary Access Hearing Plan Affidavit of Service by Mailing Findings and Order Plan

210
210 Pre-RFP Contract Pre-RFP 210 Contract Pre-RFP Contract WSDOT DB WSDOT DB WSDOT DB/WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT WSDOT DB responsible for any changes to configuration DB responsible for any changes to configuration

PF

PF PF PF PF DDP DDP DDP DDP DDP DDP DDP PF DDP

210.04 210.04(1) & 220.04(5) 210.05(4) 210.05(4) 210.05(5) 210.05(6) 210.06 210.07 210.07 210.08(1) 210.09(3) 210.09(3) 210.09(11)

Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP Pre-RFP

Project Environmental Documentation


PF Commitment file

220
220.10 Environmental Procedures Manual Environmental Procedures Manual 220.07 & Environmental Procedures Manual Environmental Procedures Manual Pre-RFP Contract WSDOT DB DB responsible to update file for any modifications

DDP

NEPA Documentation

DDP

SEPA Documentation

DDP

Categorical Exclusion Documentation

DDP

Environmental Assessment Documentation

Permits and Approvals from Other Governmental Agencies


for permits and approvals go to

240
Pre-RFP Contract WSDOT DB DB responsible to update file for any modifications

240 Figures 240-1a & 240-7a Figure 240-1a Figure 240-1a Figure 240-1a Figure 240-1a Figure 240-1a Figure 240-1a

PF PF PF DDP PF PF PF DDP DDP DDP DDP DDP PF PF DDP PF DDP August 2006

SEPA Approval Corps of Engineers - Section 404 Individual Permits Corps of Engineers Section 404 Nationwide Permit Water Quality 401 Certification Coastal Zone Management (CZM) Certification Coast Guard Section 9 Bridge Permit Corps of Engineers Section 10 Permit

Threatened and Endangered Species - Figures 240-1a & USFWS/NMFS 240-7a Historic Preservations Act - Section Figures 240-1b & 106 240-7c Land and Water Conservations Act Figure 240-1b Section 6(f) U.S. Dept of Transportation Act Figure 240-1b Section 4(f) Only if water quality permits are necessary Wild and Scenic Rivers Figure 240-1b Farmland Conversion Figure 240-1b Airport/Highway Clearance Figure 240-1b NPDES Municipal Stormwater Figures 240-1b & Discharge General Permit 240-7b NPDES Stormwater Construction Figure 240-1b Permit Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard NPDES Sand and Gravel General Figure 240-1b Permit Page 2 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP PF PF DDP

Div. 2 Stormwater - Hearings, Environ., NPDES Industrial Permit


Underground Injection Control Hazardous Waste Tracking Form Water Quality Permit. Use of Herbicides to control Noxious Weed on WSDOT Properties and Projects. Administrative Order # DE99WQ-003. WSDOT. Use of Herbicides to Control Non-noxious Weeds on WSDOT Properties and Projects. Water Right Permit State Waste Discharge (SWD) Permit Water System Project Approvals Hydraulic Project Approval (HPA) Fish Habitat Enhancement Project Application Aquatic Resource Use Authorization Easements Monument Removal Operating Permit for Surface Mining Forest Practices Application Shoreline Substantial Development Permit Flood Plain Development Permit Critical Areas Ordinance Clearing, Grading and Building Permits Temporary Air Pollution New Source Construction Noise Variance Archaeological Resources Protection Permit Bridge Scour Countermeasures

& Permits Figure 240-1b


Figure 240-1b Figure 240-1c Figure 240-1c

DDP PF DDP DDP PF PF PF DDP PF DDP PF DDP DDP DDP PF PF PF PF DDP

Figure 240-1c Figure 240-1c Figures 240-1c & 240-7b Figure 240-1c Figure 240-1c Figure 240-1d Figures 240-1d & 240-7b Figures 240-1d & 240-7b Figure 240-1d Figure 240-1d Figure 240-1d Figure 240-1d Figure 240-1d Figure 240-1d Figure 240-1e Figure 240-1e Figure 240-1e Figure 240-1e Figure 240-1e

DDP

240.03

Div. 3 - Project Documentation


Value Engineering
PF PF Value Engineering Study Final Report and Workbook Value Engineering Decision Document

315
315 315.04(2) Contract Contract DB DB

Design Matrix Procedures


DDP Use of a design element not covered in the Design Manual

325
325.03(2) & Figs. 325-3 through 325-7 Pre-RFP Contract Pre-RFP WSDOT DB WSDOT DB WSDOT DB WSDOT DB DB WSDOT WSDOT WSDOT P/F and then technical score Include in RFP Approved deviations included in proposal Would require contract change P/F and then technical score Guidance to be included in the RFP

DDP

Design Exceptions

325.03(4) Proposal Pre-RFP

DDP

Evaluate Upgrade documentation

325.03(4) Proposal Pre-RFP

DDP

Approved deviations

325.03(4)

Proposal Contract

DDP DDP PF

Corridor or project analysis for change in design level Risk project solutions based on B/C ratios - analyses, design decisions and program funding decisions Address Sidewalk Ramps for ADA compliance

325.03(5) & Figs. 325-5 through 325-7 325.03(5) & Figs. 325-5 through 325-7 Figure 325-7

RFP RFP RFP

Design Documentation, Approval, and Process Review


DDP/PF All Projects including operational changes and developer projects. All participants must provide appropriate documentation for their decisions.

330
RFP 330.01 Contract DB 40% - Complete balance of Design File WSDOT 60% - Design File done to an acceptable stage for completing R/W and Access processes

DDP
August 2006

330.03, Project Summary: Project Definition, RFP WSDOT Design Decisions Summary, 330.06(1)(a),(b), Environmental Review Summary Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard (c)& Fig. 330-5 Contract DB Page 3 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN
RFP Contract RFP Contract RFP

BY WHOM
WSDOT DB WSDOT

Status

REMARKS

DDP

Div. 2Exception - Hearings, Environ., Design (DE), Evaluate Upgrade (EU), Design Variance, DVI, Deviation, Project Control Form
Blank cell in design matrix which may be included in the project in special cases, if identified in the Project Summary or Project Control Form Cell entry F, M, or B with no DE or EU qualifiers and project does not correct design element/s to specified design level Deviation requests & approval Change in design level resulting from an approved Route Development Plan or corridor or project analysis documented as an EU or a deviation SEPA and NEPA Documentation

&

330.03, Permits 330.04,330.06, Figures 330-5 through 330-7

DDP

330.04(4) & Figure 330-1

No blank cells in Interstate matrix DB WSDOT DB WSDOT DB 90%

DDP

Figure 330-1 Contract 330.04(4) & Figure 330-2a & b RFP Contract

DDP

DDP

330.04(4)

DDP

330.05, & Figure 330-5 Figure 330-5

RFP RFP

WSDOT WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT WSDOT DB WSDOT WSDOT DB WSDOT DB WSDOT WSDOT WSDOT DB WSDOT DB DB

Final 90%

DDP

Accident Analysis

Contract DDP Traffic Projections & Analysis Work Zone Transportation Management Plan / Traffic Control Plan Work Zone Traffic Control Strategy Figure 330-5 Figure 330-3b, Chapter 810 Figure 330-5, Chapter 810 RFP Contract RFP Contract RFP Contract RFP DDP Design Clear Zone Inventory Figure 330-5 Contract DDP Cost Estimate to complete project Interchange Plans, profiles, roadway sections R/W Plans Record of Survey or Monumentation Map Corridor or project analysis Intersection Plans FHWA determination for any new or revised access point (including interchanges, temp access breaks, and locked gate access) on interstate system Cultural & Historical Review Interchange Justification Report Decisions to differ from WSDOT design guidance Decisions for project components for which there is no WSDOT design guidance. Items on Figure 330-4 Design Criteria Worksheets Design Approval Final Design Documentation Acceptance 330.08 & Figure 330-5 Figure 330-5, 940.09 Figure 330-5 Figure 330-5 Figure 330-5 Figure 330-3a & 910.13(2) RFP Contract RFP Contract RFP RFP Contract RFP RFP Contract RFP 330.07 & Chapter 1425 Contract RFP RFP RFP Contract RFP Figure 330-5 Contract Figure 330-4 Specifying Note 4 330.08 330.08 330.09 Contract

90%

PF

Draft

PF

90% - Early notification to utilities is necessary

15% - 30%

30%

DDP DDP DDP DDP DDP

Final Done with R/W Plans

Final 30% - To level needed to determine R/W footprint

90%

DDP

DDP DDP DDP

Environmental Figure 330-5 & Chapter 1425 Figure 330-5

Final Final 15% - 30% 90% 10% - Temporary access breaks for construction PS&E items

DDP

PF DDP DDP DDP

Div. 4 - Project Design Criteria


Full Design Level 440
DESIGN CLASS: DESIGN MANUAL REFERENCE 440.05

DESIGN ELEMENT DDP August 2006 Terrain Classification

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

Design Level

EXISTING

STANDARD

Page 4 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE
Figure & 440.07, Permits 440-1 and Figures 440-4 through 440-8 440.08 & Figures 440-4 though 4408

WHEN

BY WHOM

Status

REMARKS

DDP

Div. 2 Speed - Hearings, Design selectionEnviron., - Corridor Analysis required for use of minimum design speed
Lane width

DDP

RFP

WSDOT

DDP

Shoulder width

440.09, Figs 4402, 440-3 and 4404 through 440-8 440.10 and Figures 440-4 through 440-8 440.13 & Figures 440-4 through 440-8 440.14 & Figures 440-4 through 440-8 440.15 & Figures 440-4 through 7b 440.16 & Figures 440-4 through 7b 440.09

RFP

WSDOT

DDP

Median width

RFP

WSDOT

DDP

Pavement Type Determination

DDP

Structure lane & shoulder widths

RFP

WSDOT

DDP

Right of Way

DDP

Grades Maintenance office requests a shoulder width different than for the design class - justification for At existing bridge piers and abutments, shoulders less than full width to a minimum of 2 ft may be used with design exception Evaluation of curb grinding to maintain curb height Maintenance Superintendent's approval for use of curbing in areas of heavy snowfall Justification for use of curb when posted speed is greater than 40 mph Angle Parking on state route, requires an engineering study approved by the Region Traffic Engineer with final approval by the State Traffic Engineer Design Exception Documentation existing 6 lane roadway for existing 6 ft shoulders remaining when they are not being reconstructed or no other widening is required. Justify the selection of a P-6 design class on limited access highway When considering truck climbing lanes on a design class highway, perform an investigation to determine if a higher class highway is justified or vice versa Justification for Railroad Grade Separations Justification for Design Speeds greater than shown figures Justification for 11 ft lanes on Urban Managed Access Highways

DDP

DDP

440.09

PF PF

440.11(1) 440.11(1)

DDP

440.11(2)

DDP

440.12

DDP

Figures 440-4 through 440-6b

DDP

Figures 440-5a & 5b

DDP

Figures 440-5a through 7b Figures 440-5a through 8 Figures 440-5a through 7b Figure 440-8

DDP DDP DDP

Div. 5 - Soils and Paving


Soils, Rock, & Surfacing Materials
PF PF PF PF DDP Materials Source Report & Approvals Permits and agreements Plan sheets Right of Entry to start investigation Surfacing Report Final Geotechnical Report with boring logs and summary of geotechnical conditions Pavement Determination/Life Cycle Cost Analysis

510
510.03 & Materials Lab 510.04(4) 510.04(4)(b) 510.04(4)(d) Materials Lab & 510.07 HQ Materials Lab & 510.08(2) Materials Lab and HQ Pavement Type Contract RFP Contract Contract RFP Contract RFP Contract RFP Contract DB WSDOT DB DB WSDOT DB WSDOT DB WSDOT DB Draft Draft Only necessary when State supplies source

Draft

DDP/PF

PF

Geosynthetics
PF August 2006

530

Characteristics of chosen geosynthetic (AOS, permittivity, load-strain, 530.04 Contract DB Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard survivability)

Page 5 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
Soil Information (Geotechnical Report & Div. 2 - Hearings, Environ., will satisfy this documentation requirement.) Erosion Control/Silt Fence Plan

REFERENCE

WHEN
Contract Contract

BY WHOM
DB DB

Status

REMARKS

PF PF

Permits
530.05 530.05(6)

Div. 6 - Geometrics
Traffic Analysis
DDP/PF DDP DDP Capacity analysis Traffic Analysis TIA Report

610
610, Highway Capacity Manual 610.06 610.12 Final - Needed for Chan. Plan to determine R/W footprint Final - Needed for Chan. Plan to determine R/W footprint

Geometric Plan Elements


DESIGN ELEMENT

620
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP DDP DDP DDP DDP DDP DDP

Horizontal curve radii Lane transitions (tapers) Median width transitions Horizontal alignment justification Frontage road justification Number of lanes justification Realignment

620.04(2) 620.07(1) 620.07(2) 620.04(1) 630.07 620.05(2) 620.08 620.06(1)&(2) 620.08 620.08

RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract

WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB

15% 15% 15% 15% 15% 15% 15%

Geometric Profile Elements


DESIGN ELEMENT

630
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP DDP DDP DDP DDP DDP DDP DDP

Minimum length of vertical curves Maximum grade Minimum grade Length of grade Sag vertical curve having a length less than required for stopping sight distance Alignment on structures analysis Vertical alignment modification Procedures

630.03(2) 630.03(3) 630.03(4) 630.03(5) 630.03(2) 630.03(6) 630.07 & 620.04(1) 630.07

RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract

WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB

15% 15% 15% 15% 15%

15% 15% 15%

Geometric Cross Section


DESIGN ELEMENT

640
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Justification for cross slopes other than 2% on tangents Justification for shoulder cross slopes different than the adjacent lane Cut slope selection Fill slope selection Economic comparison of wide to narrow median where land is expensive Justification for using steeper fill slopes than shown in the tables when traffic barrier is installed. Documentation of the reasons for modifying an existing cut slope Engineering study and recommendations for rock cuts Materials Engineer recommendation for stepped slopes Materials Engineer recommendation for ditch location at the toe of fill. Bridge end slopes

640.04(1)

RFP Contract RFP

WSDOT DB WSDOT DB

15%

15%

DDP DDP DDP PF

640.04(3) Contract 640.07(1) 640.07(1) 640.05(2)

PF PF PF PF

640.06(1) 640.06(1) 640.06(2) 640.06(3)

PF PF

640.06(4) HQ Bridge and Structures

Turning Roadways 641 Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard
DDP August 2006 Use of minimum width on two-lane twoway turning roadways 641.04(1)

Page 6 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
Use of2 minimum width onEnviron., two-lane oneDiv. - Hearings, & way turning roadways Use of minimum width on one-lane turning roadways

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP DDP

Permits 641.04(2)
641.04(3)

Superelevation
DESIGN ELEMENT

642
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Documentation of superelevation maximum rate being used and justification for a rate other than 10% maximum Low-Speed Urban Managed Access Highway Superelevation Superelevation on existing curves

RFP 642.04 Contract 642.05 and Figure 642-4 642.06 RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract

WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB

DDP DDP DDP

Superelevation for Turning Movements 642.07 & Figure at Intersections 642-4 Superelevation Runoff for Highway Curves Superelevation Runoff for Ramp Curves Justification for superelevation of ramps in urban area with design speed of 40 mph or less as an urban managed access highway 642.08 & Figures 642-5a through 642-5d 642.09 & Figs. 6425a through 642-6b

DDP

DDP

DDP

642.04

Sight Distance
DESIGN ELEMENT

650
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Stopping sight distance

650.04, Figures: 650-1 thru 5, & 650-11 &12 650.04(5), Figures 650-6, 650-7, and 650-13a 650.07, Figures 650-4, 650-5, 6507, 650-8, and 65013b, Chapter 630 650.05, Figure 6507, 650-9, and 65014 650.04(1), 650.04(3) and 650.04(5) 650.06, Figures 650-4, 650-5, 6507, and 650-10 RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB 15% 15% 15%

DDP

Horizontal stopping sight distance

DDP

Existing Stopping Sight Distance

DDP

Passing sight distance Justification for increase in object height to 2.00 ft. in urban design areas (vertical and horizontal curves) Decision sight distance

DDP

DDP

Div. 7 - Roadside Safety Elements


Roadside Safety
DESIGN ELEMENT

700
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Design Clear Zone inventory, evaluation documents and justification for design decision. Evaluation of medians and roadside clear zones in an urban environment but outside of an incorporated city Design Clear Zone establish by city managed access state highways Median accident evaluation and barrier warrant determination Median width deviation for barrier placement Evaluation of potential hazards beyond the Design Clear Zone Formalized agreement on responsibility with city/county in urbanized areas adjacent to incorporated cities and towns Justification for the design decision to be included as part of the project or Justification for barrier use not meeting criteria in 700.05 Evaluation of slopes

700.04(1)

RFP Contract

WSDOT DB WSDOT DB WSDOT DB WSDOT WSDOT WSDOT DB WSDOT

Draft

DDP

700.04(1) & Figure 700-1

RFP Contract RFP

Draft

DDP

700.04(2) Contract 700.06 700.06 700.04(1) RFP RFP RFP Contract RFP 700.04(1), 700.04(2) Contract RFP Contract RFP Contract RFP Contract RFP Contract DB WSDOT DB WSDOT DB WSDOT DB Draft Draft

DDP DDP DDP

Final Final Draft

DDP

DDP

700.05 700.05(1), Figure 700-5 and Chapters 430 and 700.05(2)(a) through (h) 700.05(2)c

DDP

DDP

Evaluation of Fixed Objects

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

DDP August 2006

Hydraulic evaluation for culvert bars

WSDOT DB

Draft

Page 7 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN
RFP Contract RFP Contract Contract RFP Contract

BY WHOM
WSDOT DB WSDOT DB DB WSDOT DB

Status
Draft

REMARKS

DDP DDP DDP DDP

Div. 2 - Hearings, Environ., Evaluation of Water Depth


Median evaluation for potential errant crossover movements Rumble Strips Glare screen justification

& Permits 700.05(3)


700.06 700.07 700.07(2)

Draft

Traffic Barriers
DESIGN ELEMENT

710
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Barrier terminal selection

DDP DDP DDP DDP PF PF DDP DDP DDP PF DDP

Transition & Connection selection Standard Run of Barrier - height Bridge rail evaluation and upgrade method Shy distance requirements Barrier Deflection Flare Rate Barrier length of need calculation Long guardrail post justification or approved deviation Remove barrier not needed Barrier selection Justification for median barrier placement closer than 15' in medians wider than 30' Assessment of concrete barrier placement impact to wildlife Approved public interest finding for use of a sole source proprietary traffic barrier Retrofitting with new concrete bridge rail when no widening is proposed

710.04(1), 710.06(2), 710.08(2) 710.04(1), 710.06(3) & Figs. 710-6 & 710-10 710.04(2) 710.04(4) 710.05(1) 710.05(2) & Figure 710-2 710.05(3) & Figure 710-3 710.05(4) & Figs. 710-11(a)-(c) 710.06(1) & Figure 710-12 710.04 710.05 710.05(5) 710.08(3) & Figure 710-8 710.09 710.10(1)

Contract

DB

Contract RFP Contract RFP Contract RFP Contract Contract Contract RFP Contract Contract Contract RFP RFP Contract RFP Contract Contract Contract

DB WSDOT DB WSDOT DB WSDOT DB DB DB WSDOT DB DB DB WSDOT WSDOT DB WSDOT DB DB DB 15% 15% 15% 15% 15% 15%

PF PF PF

Impact Attenuator Systems


DDP PF DDP Approvals for use of older systems Approved public interest finding for use of a sole source proprietary impact attenuator Documentation of reasons for eliminating attenuator options

720
720.01(3) 720.03 720.03 Contract Contract Contract DB DB DB

Div. 8 - Traffic Safety Elements


Work Zone Traffic Control
PF Description of and the basis for the CWZTC strategy developed during the project design Work Zone Traffic Control Checklist

810
RFP 810 Contract 810.01, 810.19, Figure 810-4 810.14, Figure 810-4 810.13, Figure 810-4 810.06(1) 810.18, Figure 810-4 810.07(5)(e) Contract 810.13(8) 810, 810.17 810, 810.18 RFP Contract RFP Contract RFP Contract DB WSDOT DB WSDOT DB WSDOT DB RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT Draft Draft WSDOT Draft

PF

PF

Work Zone Traffic Analysis Documents Contact with local & WSP enforcement officials Time Restrictions Road Closures, detours and agreements Notification to maintenance regarding oversized vehicle restrictions Speed Limit reduction approval Transportation Management Plan Traffic Control Plans

PF PF PF

PF

PF PF PF

Signing
DESIGN ELEMENT

820
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

PF PF PF August 2006

Replacing/modifying signs 820.01 Contract DB Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Approval of non-standard signs 820.01 Contract DB Approval of proposed guide signs 820.01 & 820.06 Contract DB

Page 8 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE
820.03(1) through Environ., & Permits (6) 820.03(5) 820.04(2) Traffic Office 820.07

WHEN
RFP Contract Contract Contract Contract

BY WHOM
WSDOT DB DB DB DB

Status

REMARKS
To level needed to determine easements for R/W Plan

DDP PF PF PF

Div. 2Components - Hearings, Design

Soils investigations for all sign bridge and cantilever sign supports Sign bridge vertical clearance Inventory of all existing signing within the project limits

Delineation
PF PF PF PF PF Decision to omit delineation work Approval of Region Traffic Engineer for use of barrier centerline Supplemental Right Edge line markings Use of Type 3 Raised Pavement Markers Justification to use guideposts on tangent sections due to snow, fog, or other reduced visibility conditions

830
830.01 830.04 830.04(4) 830.03 830.04 & Figure 830-2 Contract Contract Contract DB DB DB RFP Contract WSDOT DB Draft

Illumination
DESIGN ELEMENT

840
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP

Identify facilities where the required illumination is proposed Major parking lots - illumination design providing appropriate light levels, circuitry design for security lighting

840.04

RFP Contract

WSDOT DB

Draft

DDP

840.04(7)

DDP

DDP

Justification and approval for any 840.05(1) through proposal to install additional (11) illumination at other highway facilities Justification for using nonstandard luminaries and light standards on state 840.06(4) highways

Contract

DB

Contract

DB

Traffic Control Signals


PF All traffic study information used in the signal analysis A copy of the approved traffic signal permit Third Party Agreement Signals Alternative analysis for traffic signals on high speed highways Explanation for using normally uncorrectable accidents to justify a traffic signal Signal Warrants Explanation of why the desired level of service cannot be obtained Railroad preemption phasing Emergency vehicle preemption Transit priority preemption A copy of the preliminary signal plan

850
Planning Traffic Office 850.04 850.04(2) 850.05 RFP Contract RFP Contract RFP Contract RFP Contract RFP 850.05 Contract 850.05 850.06(2)(a) 850.06(2)(f) 850.06(7)(a) 850.06(7)(c) Traffic Office 850.06(10) RFP Contract RFP Contract Contract Contract Contract Contract DB WSDOT DB WSDOT DB DB DB DB DB Final Final WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT Final Final Draft

DDP DDP PF

PF

PF PF PF PF PF PF

Intelligent Transportation Systems


PF PF DDP PF Justification for the installation of ramp meters Designs for the ultimate system when staged implementation is used Approved traffic signal permit for ramp meters All correspondence and coordination with local agencies

860
860 860.01 860.04 860.04(5) RFP Contract RFP RFP Contract WSDOT DB WSDOT WSDOT DB Final Contributions from both teams Final

Div. 9 - Intersections & Interchanges


Intersections At Grade
DESIGN ELEMENT

910
DESIGN MANUAL REFERENCE DESIGN LEVEL

Most of these Items may be included in the Intersection Plan for Approval
EXISTING STANDARD

DDP DDP DDP DDP August 2006

Intersection angle Intersection turning radii Sight distance at intersection Traffic analysis

910.04(2)(a) 910.06, Figures 910-8 & 910-11a 910.1

RFP Contract RFP Contract RFP RFP

WSDOT DB WSDOT DB WSDOT WSDOT

15% - designed to level of footprint determination for R/W 15% 15% 15%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Contract DB

910.04(1)

Page 9 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
Traffic analysis

REFERENCE
910.04(1) 910.04(1) 910.04(2)(b) 910.04(2)( c )

WHEN
Contract RFP Contract RFP Contract RFP Contract RFP

BY WHOM
DB WSDOT DB WSDOT DB WSDOT DB WSDOT

Status
15% 15% 15%

REMARKS

DDP DDP DDP DDP

Div. 2 - Hearings, Environ., & Permits

Accident analysis Lane alignment Split Tee intersection evaluation / justification Justification and approval from Region Traffic Engineer to retain existing intersection with substandard configuration when accident analysis shows no history as a result of the configuration Crossroad design Traffic analysis for justification to use smaller design vehicle for any particular intersection leg Design Vehicle selection and justifications with regard to encroachments Justification for modifying right-turn corner designs as shown in Figure 9107 Plot showing design vehicle turning path template - right turn corner

DDP

910.04(2)(d) Contract 910.04(3) 910.05 RFP Contract RFP Contract RFP 910.05 Contract DB WSDOT DB WSDOT DB WSDOT DB 15%

DDP DDP

DDP

DDP

910.06

DDP

910.06 910.07(1)(a) & Figs 910-4, 910-8b & 910-9a through 9c 910.07(1)(a) & Figs 910-8a & 8b

RFP Contract RFP Contract RFP

WSDOT DB WSDOT DB WSDOT DB WSDOT

15%

DDP

Left-turn lane storage length Left-turn lane justification including traffic and accident analysis signalized and unsignalized intersections, HCM analysis if performed Evaluate upgrade when existing opposing left turn lanes do not meet the 4 ft minimum clearance and have split phasing Justify modifications made to left-turn designs given in Figures 910-10a 10d. Document benefits and impacts, include a plot of the design showing the design vehicle turning template Two-way left-turn lane justification Right-turn lanes and drop lanes justification including accident study, traffic signal analysis and capacity analysis Speed Change Lanes justification Shoulder width reduction within channelized intersection areas Traffic island design U-turn justification and design Document the right of way width and provide a brief analysis of the intersection sight distance clarifying the reduction in setback distance. Document there is no accident problem and as a design exception Interchange ramp terminals sight distance and design (capacity determination and analysis) Traffic Control at intersection analysis Intersection plans and supporting information Local Agency or Developer Initiated Intersections Median lane reduction justification

15%

DDP

DDP

910.07(1)(a) Contract RFP 910.07(1)(a)(3) Contract 910.07(1)(b) RFP Contract RFP 910.07(2) Contract RFP Contract DB WSDOT DB WSDOT DB WSDOT DB 15% 15% 15%

DDP

DDP

DDP

DDP DDP DDP DDP

910.07(3) 910.07(4) 910.07(5) 910.09

Contract Contract

DB DB

DDP

910.1

RFP 910.10 & 910.12 Contract Contract RFP Contract RFP Contract RFP Contract

WSDOT DB DB WSDOT DB WSDOT DB WSDOT DB

15%

DDP

DDP DDP DDP DDP

910.11 910.13(1) & (2) 910.13(3) Fig 910-10d

15% 15%

Roundabouts
DDP DDP Locations where roundabouts need additional evaluation Capacity analysis for determining roundabout capacity

915
915.01(2) 915.05 RFP Contract RFP Contract WSDOT DB WSDOT DB

Chapter 915 Supplement


15% 15%

DDP August 2006

Determination - MS: radii Meets RFP Fix ENF: Existing WSDOT Nonstandard, Will Fix PN: Proposed Nonstandard Evaluation of turning RStandards 4 and R5 ENNF: Existing Nonstandard, No to ensure maximum speed differential 915.06(9) between entering and circulating traffic is no more than 12 mph

Page 10 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DDP

Evaluation of turning radii R4 and R5 DESCRIPTION REFERENCE to ensure maximum speed differential 915.06(9) between entering and circulating traffic & Permits Div. 2 Hearings, Environ., is no more than 12 mph Right-Turn Slip Lane justification Striping plan Roundabout justification Approving authorities concurrence (other than WSDOT) HQ Design Office approval
DESIGN ELEMENT

WHEN
Contract RFP Contract Contract RFP RFP RFP
DESIGN LEVEL

BY WHOM
DB WSDOT DB DB WSDOT WSDOT WSDOT

Status

REMARKS

DDP PF DDP DDP DDP

915.06(13) 915.09 915.12(1), (2) & (3) 915.12(1) 915.12(1) & (3)
DESIGN MANUAL REFERENCE

15%

Final Final Final


EXISTING STANDARD

DDP DDP DDP DDP

Access Control Signing Pavement Markings Illumination


DESIGN ELEMENT DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP DDP DDP DDP DDP DDP DDP DDP DDP

Circulating Roadway Inscribed Diameter or ICD Central Island/Truck Apron Truck Apron Design Vehicle Number of Circulating Lanes Circulating Speed Circulating Width Deflection Radius Circulating Cross Slope Deflection Clearance Approach From Approach Speed (Posted Speed) Approach Design Vehicle Number of Entry Legs Entry Leg Spacing Angles Entry Speed Entry Width Approach Half Width Entry Angle Entry Deflection Radius Entry Deflection Curve Number of Exit Lanes Exit Speed Exit Width Exit Deflection Radius
DESIGN ELEMENT DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

(Must include a section for each approach)

DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP

DDP DDP DDP

Stopping Sight Distance Approach Roadway Circulating Roadway Departure Roadway Intersection Sight Distance Approach Roadway - to left Approach Roadway - forward Circulatory Approach From... Islands (Must include a section for each approach)

DDP DDP DDP

DDP DDP DDP

Splitter Island Length Splitter Island Width @ Crosswalk Splitter Island Taper Pedestrian and Bicycles Crosswalk Location Barrier Free Passage Way Width Grade/Superelevation Approach Roadway Grade Right-Turn Slip Lane Radius Lane Width

DDP DDP

DDP

DDP DDP

Road Approaches 920 Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard
August 2006

Page 11 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
Evaluation of existing road Div. 2 - Hearings, Environ., approaches that do not comply with access control requirements Utility and Special Use - Managed Access Facility when an agreement has been reached for the special purpose Plan or list of the road approaches

REFERENCE

WHEN
RFP

BY WHOM
WSDOT

Status
Final

REMARKS

DDP

& Permits
920.04

DDF

920.05(3)(b)

RFP RFP Contract

WSDOT WSDOT DB

Final Draft

PF

920.09

Railroad Grade Crossing


DDP PF DDP DDP Easements or permits with railroad/s Notice to Proceed authorizing railroad to commence work Petition to WUTC and WUTC issued Order Sight distance evaluation and documentation Evauate need for median separator when lights and gate might not be providing adequate safety to motorists. Any engineering studies or sight distance measurements. Traffic control systems passive and active including any signal preemption timing or calculations Evaluation of railroad signal supports and gate mechanisms as roadside hazards

930
930.01 930.01 930.01 & 930.09 930.03 RFP Contract WSDOT DB Draft

DDP

930.03

DDP PF

930.03 930.04(a) & (b)

DDP

930.04(b)

Traffic Interchanges
DESIGN ELEMENT

940
DESIGN MANUAL REFERENCE

Most of these items may be included for the I/C plan


EXISTING STANDARD

DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP

Ramp Design Speed Ramp vertical stopping sight distance Ramp horizontal stopping sight distance Ramp maximum grade Ramp lane width Ramp shoulder width Accel lane number of lanes, length Decel lane number of lanes, length Left side on-off connections Spacing Justification to use midrange design speed values for portion of freeway-tofreeway ramps in lieu of upper range values Ramp lane increases Justification for ramp metering main line speed reduction Justification for mountable curb at interchange - speed of adjacent traffic exceeds 40 mph Lane balance - Not required, but desirable Accel lane length based on a speed less than design speed On-connection type justification, existing (with possible design exception) and new Decel lane length based on a speed less than design speed Off-connection type justification, existing (with a possible design exception) , and new Gores - Not required, but desirable

940.05(1) & Figure 940-1 940.05(2) & 650.05 940.05(2) & 650.05(5) 940.05(3) 940.05(4) & Figure 940-3 940.05(4) & Figure 940-3 940.06(4) & Figure 940-8 940.06(5) & Figure 940-10 940.04(1) 940.04(3) & Figure 940-5

RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP Contract RFP

WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB DB DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB

15% 15% 15% 15% 15% 15% 15% 15% 15% 15%

DDP

940.05(1) Contract 940.05(5) 940.05(6) 940.06, Figs. 94013a,b, & c 940.06(1) & Figs. 940-6a & 6b 940.06(4) 940.06(4) (a),(c),(d) & Figs, 940-9a through 9d 940.06(5) 940.06(5)(a),(c) and Figs. 940-12a through 940-12e RFP Contract RFP Contract Contract Contract RFP Contract RFP Contract RFP Contract RFP Contract

DDP DDP

15% 15%

DDP DDP DDP

15% 15%

DDP

DDP

15%

15%

DDP

DDP DDP August 2006 DDP

940.06(5)(b) & Figs. 940-11a & Contract DB 11b 940.06(8), & Weaving analysis and design Contract DB Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Figure 940-5 15% RFP WSDOT Interchange Plan, contour grading 940.09 plan

Page 12 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DDP DDP/PF

DESCRIPTION Interchange Plan, contour grading plan Div. 2 - Hearings, Environ.,


Interchange Justification Report

REFERENCE

WHEN
Contract RFP

BY WHOM
DB WSDOT

Status
Final

REMARKS

& Permits
1425

940.09

Median Crossovers
Median crossover may be provided based on an analysis demonstrating that access through interchanges or intersections is not practical Operational Analysis Right of Way or Limited Access Plan approval, need, and design data showing a opening

960

DDP

960.01

Contract

DB

DDP

960.02

RFP

WSDOT

Final

PF

960.04

RFP

WSDOT

Final

Div. 10 - Auxiliary Facilities


Auxiliary Lanes
DDP Documentation that climbing lane Warrant has been met Justification for waiving climbing lane Warrant 1 or 2 Justification of shoulder width reduction on Two-Way Two-Lane climbing lane section. Justification for passing lanes Justification of shoulder width reduction on passing lane sections Slow moving vehicle turnout documentation (need, location, and why selected) Shoulder Driving for Slow Vehicles Emergency escape ramp documentation Chain-up Areas

1010
1010.04(1)(2)(3) & Figs. 1010-2a, 1010-2b and 1010-3 1010.04(1) 1010.04(4) 1010.05(1),(2) & Figures 1010-5 and 1010-6 1010.05(2) 1010.06(2) 1010.07(2) 1010.08(2) 1010.09 & Figure 1010-9 RFP WSDOT Final

DDP DDP DDP DDP DDP DDP DDP DDP

RFP

WSDOT

Final

DDP DDP

Bicycle Facilities Coordination with Region Bicycle Coordinator


Facility Selection
DESIGN ELEMENT

1020 1020.01
1020.04
DESIGN MANUAL REFERENCE

Chapter 1020 Supplement


RFP Contract RFP Contract WSDOT DB WSDOT DB
EXISTING STANDARD

15%

Width DDP DDP DDP Shared-Use Path or Bike Lane Separation to Obstructions Graded Area Clearance to Obstructions DDP DDP Horizontal Clearance Vertical Clearance Intersections with Highways DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP DDP August 2006 Intersection Crossing Angle Approach Treatment Ramp Widths Refuge Islands At-Grade Railroad Crossings Separation, Barrier, Fencing Design Speed Horizontal Alignment and Cross Section Stopping Sight Distance Sight Distance - Crest Vertical Curves Lateral Clearance - Horizontal Curves Grades Pavement Structural Section Structures Drainage Signing and Pavement Markings Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Illumination

Page 13 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

Div. 2 - Hearings, Environ., & Permits


Pedestrian Design Considerations
DDP Investigate and document options to modify the scope of pedestrian improvements on a project or separate into another project Exceptions to adopted design standards require a deviation approved by the designated authority Agreements with cities to install pedestrian sidewalks or walkways along state highways within their jurisdiction Shoulder Width Justification for sidewalks

1025
RFP 1025.04(1) Contract DB WSDOT 15%

RFP 1025.04(1) Contract 1025.04(2)(a), 1025.07(2)(a) RFP Contract RFP Contract RFP Contract RFP Contract Contract Contract Contract

WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB DB DB DB 15% 15% 15% 15%

DDP

DDP

PF DDP

1025.07(2)(b) 1025.07(2)(e) & Figure 1025-3 1025.07(2)(e) & Figs. 1025-2a & 2b 1025.07(3) 1025.07(3) 1025.07(3)

PF DDP DDP PF

Side slopes adjacent to sidewalks Decisions to prohibit a pedestrian crossing at an intersection Approval of the installation of a midblock pedestrian crossing Approval of the installation of a bulb out on a state highway

High Occupancy Vehicle Facilities


DESIGN ELEMENT

1050
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

PF DDP DDP DDP

Operations Analysis of Need for HOV Lanes Freeway Operational Alternatives Conversion of existing freeway lane to an HOV lane requires a deviation request. Conversion of existing shoulder to an HOV lane requires a deviation request. Agreement with transit agency when shoulder is converted to HOV use

1050.05(1) through (3) 1050.01 & 1050.04 1050.04(3) 1050.04(3)(b)

RFP RFP RFP RFP Contract

WSDOT WSDOT WSDOT WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT DB WSDOT 15% Final

DDP

1050.04(3)(c)

RFP Contract

DDP

1050.04(3)(c)

RFP Contract RFP Contract RFP Contract RFP

DDP DDP

Arterial Street Operational Alternatives Design Criteria Deviation required when any proposed element or existing design element does not meet the applicable design level for the project.

1050.04(4) 1050.06(1) through (8)

15%

DDP

1050.06(2) Contract RFP Contract RFP 1050.06(4)(e) Contract DB DB WSDOT DB WSDOT

DDP

Shoulder reduction to 2 feet on an arterial street with a proposed HOV lane requires justification. Location of an observation point/enforcement area other than that shown in figures 1050-4a and 4b

1050.06(4)(c) & Fig 1050-2

DDP

HOV Direct Access


DDP PF DDP DDP PF PF PF

1055

DDP PF August 2006

Access Point Decision Report 1055.01(2) (Interchange Justification Report) Operational Analysis portion of the IJR 1055.01(2) & for flyer stop approval. 1055.05(9) Site Evaluation 1055.04 Evaluation of ramp connection spacing 1055.04(1)(a) Traffic analysis to determine 1055.04(1)(a) degradation of traffic operations Deviation for on-ramp or off-ramp grades increased by 1% and 2% 1055.05(4) respectively Justification for use of tapered off1055.05(7)(b),(d) connection Deviation for 14.5 foot minimum vertical clearance for a new HOV 1055.05(8) direct access ramp under an existing bridge. Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard ADA accessibility compliance 1055.06

Page 14 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION Transit Benefit Facilities Park & Ride Lots:

REFERENCE 1060
1060.03(1) 1060.03(2) 1060.03(3)

WHEN

BY WHOM

Status

REMARKS Chapter 1060 Supplement

Div. 2 - Hearings, Environ., & Permits


DDP DDP DDP MOU Public Meetings & Environmental Processes Document design decisions RFP RFP RFP Contract WSDOT WSDOT WSDOT DB

Final Final 15%

Bus Stops & Pullouts:


DDP Consent of jurisdiction having authority over R/W and transit authority for bus stop placement 1060.05(2) RFP WSDOT Final

Div. 11 - Structures
Site Data for Structures
PF

1110
Contract DB

PF

PF PF

1110.03(2), DOT Form 235-002, "Bridge Site Data - Figure 1110-1 & General" Bridge Design Manual 1110.04, DOT Form 235-001, "Bridge Site Data Figure 1110-1 & for Stream Crossings" Bridge Design Manual 240.03, & United States Coast Guard permit 1110.04 Coast Guard permit exemption Environmental Classification Summary DOT Form 235-002a, "Supplemental Bridge Site Data Rehabilitation/Modification" 1110.04 1110.06, Figure 1110-1 & Bridge Design Manual

Contract

DB

RFP RFP

WSDOT WSDOT

Final Final

PF

Contract

DB

Bridges
DESIGN ELEMENT

1120
DESIGN MANUAL REFERENCE DESIGN LEVEL EXISTING STANDARD

DDP DDP DDP DDP

Vertical Clearance Final Geotechnical Foundation Report Structural Capacity Report Horizontal Clearance Evaluation of need and approval for enclosing the median area between bridges Agreement between railroad company and approval of WUTC for reduced clearance for closed or dedicated rail corridors that do not intermix with general rail freight rail traffic, new and existing

1120.04(5) 510.04(13) 1120.04(1)(b) 1120.04(3) & The Bridge Design Manual 1120.04(4)

RFP Contract Contract Contract RFP Contract Contract

WSDOT DB DB DB WSDOT DB DB

15%

15%

DDP

DDP

1120-04(5)(a)(2), (b)(4), Figs 11201, 1120-2a & 2b

DDP

On existing structures being widened with a vertical clearance less than 16 ft on Interstate or other freeways and 1120.04(5)(b)(1) & less than 15.5 ft on non freeway Fig 1120-1 routes an approved deviation is required Resurfacing under an existing structure reducing vertical clearance to less than 16 ft on the interstate or 1120.04(5)(b)(2) & other freeways or less than 15.5 ft on Fig 1120-1 nonfreeway routes evaluate options an approved deviation is required Justification for eliminating an overlay in the vicinity of a bridge Contact Materials Lab and/or Bridge Office 1120.04(5)(b)(2)

DDP

DDP

PF

DDP DDP PF PF DDP

Materials Engineer approval to mill an 1120.04(5)(b)(2) existing surface Project with existing bridge and no widening on or under bridge but 1120.04(5)(b)(3) & already has a vertical clearance under Fig 1120-1 14.5 ft, an approved deviation is Railroad agreement allowing less than 1120.04(5)(b)(4) 22.5 ft. vertical clearance Correspondence involving the 1120.04(5)(d) MTMCTEA Justification and HQ concurrence for 1120.04(6) omitting bridge approach slabs Analysis of need and approval for protective screening on highway 1120.04(11) structures

RFP

WSDOT

Final

Contract Contract

DB DB

Retaining Walls and Steep 1130 Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Reinforced Slopes
August 2006

Page 15 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
Traffic Barrier Shape in front of wall Div. 2 - Hearings, Environ., deviation Geotechnical/Soils Report Drainage detail deletions Bridge & Structures Principal Architect approval of aesthetic features Consideration of site constraints on constructibility Impact of other interfering design elements Consideration of Fall Protection for walls 10 ft or greater in height Approved work plan for an experimental proprietary retaining wall Approved public interest finding for use of a sole source proprietary retaining wall HQ Approval of Consultant designs Wall Site Data Check List, DOT351-009EF, and attachments

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP DDP PF PF DDP PF DDP PF

& Permits 1130.04(1)


1130.04(2) 1130.04(4) 1130.04(5) 1130.04(6) 1130.04(7)(a) 1130.04(7)(b) 1130.06(1) RFP Contract Contract Contract Contract Contract Contract WSDOT DB DB DB DB DB DB Draft

PF PF PF

1130.06(1) 1130.06(2) 1130.06(3)(b) Check with Bridge Office Contract RFP Contract DB WSDOT DB 15%

Noise Barriers

1140
1140.01 - See Noise Policies on HQ Environmental Affairs Office homepage 1140.03(2) 1140.03(2) 1140.03(2)(f) 1140.04 1140.04 1140.04 1140.04

DDP

Noise Report

RFP

WSDOT

DDP PF DDP DDP DDP DDP PF

Geotechnical/Soils Report List of design options considered and summary of evaluations Traffic Barrier Shape in front of wall deviation Openings approvals Wall attachments approval Report on impact due to change Final Selection approval

RFP Contract RFP Contract Contract Contract Contract Contract Contract

WSDOT DB WSDOT DB DB DB DB DB DB

Draft 15%

Div. 12 - Hydraulics
Hydraulic Design
DDP DDP PF PF Hydraulics Report Hydraulics Summary Temporary Erosion & Sediment Control (TESC) Plans Stormwater Site Plans (SSP)

1210
Hydraulics Manual Hydraulics Manual Highway Runoff Manual Highway Runoff Manual RFP Contract RFP Contract RFP Contract RFP Contract WSDOT DB WSDOT DB WSDOT DB WSDOT DB Draft Draft - 15% Draft - 15% Draft

Div. 13 - Roadside Development


Roadside Development 1300
Roadside Classification Plan & Roadside Manual DDP VisualDiscipline Reports/Visual Impact Assessment 1300.06 DB

Chapter 1300 Supplement

Contour Grading
PF Contour Grading Plan

1310
1310.01 & Roadside Manual Contract DB

Vegetation
PF Mature characteristics of plant species evaluation

1320
1320.04(1) DB

Irrigation
PF PF Irrigation Plan Approved public interest finding for use of a sole source proprietary products

1330
1330.01 1330.03(c) listed under the design phase Contract Contract DB DB

Soil Bioengineering
PF PF August 2006

1350

For streambank/shoreline as part of the recommendations of the Hydraulic 1350.04 Contract DB Report As part of the recommendations in the 1350.04 Contract DB Stormwater Site -Plan (SSP)Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard Determination MS: Meets

Page 16 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION
For slope as Environ., part of the & Div. 2 - stabilization Hearings, recommendations in the Geotechnical Report As part of the recommendations in the Environmental Documents Summary of site analysis Roadside Restoration Plan

REFERENCE

WHEN
Contract Contract Contract Contract

BY WHOM
DB DB DB DB

Status

REMARKS

PF PF PF PF

Permits

1350.04 1350.04

Roadside Manual Roadside Manual

Div. 14 - Right of Way & Access Control


Right of Way Considerations
PF DDP PF PF DDP PF PF PF PF Approval of any approach on Limited Access Highways New Approach - Permits Cattle pass studies and approvals Detour and Haul Road Agreements International Boundary Commission approval Construction permit and map Approved Easements & Permits FHWA authorization for federal participation in right of way costs Condemnations for emergency projects of immediate need for a sundry site Approvals of Access Report Plan, Access Hearing Plan, R/W Plans and L/A Plans

1410
1410.03(1) 1410.03(1) 1410.03(2) 1410.03(3) 1410.03(4) 1410.04(4) 1410.04, 1410.07(3), 1410.07(4) 1410.05 1410.05(6) RFP RFP Contract N/A Contract N/A RFP Contract Contract WSDOT DB DB 15% WSDOT WSDOT DB DB Final 15%

PF

Figure 1410-1

Access Control
DDP DDP PF DDP DDP DDP DDP Access connection permit Access deviation approval - State Design Engineer Application for an access connection Easement Findings and order Findings and order plan USFS request to obtain a road approach permit for a new access to a state highway that is crossing Forest Service Land

1420
1420.03 1420.03 1420.03 1420.03 1420.03 1420.03 1420.03 & MOU Highways Over National Forest Lands RFP RFP RFP Contract RFP Contract Contract Contract N/A WSDOT WSDOT WSDOT DB WSDOT DB DB DB

Interchange Justification Report


Request for acceptance and approval and the associated Interchange Justification Report and supporting records Transportation Systems study (study area and/or area of influence), traffic analyses, operational/safety analyses Acceptance and approval documents Justification for omitting a request and IJR

1425
1425.01, 1425.05(1) thru (8) and Figures 14251 and 1425-4 1425.04(1), (2) and (3) 1425.04(3) Figure 1425-3 RFP RFP WSDOT WSDOT Final Final

PF

RFP

WSDOT

Final - This must be completed prior to the Access Report and Plan process

DDP

DDP DDP

Limited Access
Evaluation of access control type (F, P, or M) when ROW is being acquired on an existing highway if shown on the ACTS list as either established or planned for access control Cost evaluation of acquiring limited access Findings and Order Access Report and Plan

1430

DDP

1430.01

RFP

WSDOT

Final

PF DDP DDP

1430.01 1430.02(1)(d) & 210 1430.02(2)(f) & (g) 1430.02(3) & Plans Preparation Manual

RFP RFP RFP

WSDOT WSDOT WSDOT

Initial cost estimate Final - WSDOT/GEC Lead - Risk Item Final - WSDOT/GEC Lead - Risk Item

DDP

Access Hearing Plan

RFP

WSDOT

Final - WSDOT/GEC Lead - Risk Item

DDP DDP DDP August 2006

Request and approval of gated 1430.03(1) RFP WSDOT approaches Staged access acquisition - access 1430.03(1) RFP WSDOT deviation approval Decision to defer acquisition of limitedENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix Determination - MS: Meets Standards control of access - access deviation 1430.03(1) RFP WSDOT approval

Final Final
PN: Proposed Nonstandard

Final

Page 17 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP

Div. 2 - Hearings, Environ., & Permits The evaluation of full control for principal arterial highways requiring four or more through traffic lanes within a 20-year design period unless 1430.03(2)(b) approved for partial or modified control on existing highways by the Transportation Commission.
Limited access falls short of 300 ft or any access that has been allowed to remain within the first 130 ft. - Access deviation Headquarters approval of trails within the limits of full control limited access highways State Design Engineer approval of altering right of access by abutting property owner - partial limited access control State Design Engineer approval of shorter interval spacing for public road intersections State Design Engineer approval of excess approaches allowed as stage construction on partial control limited access highways. Department approval of designated school bus loading zone on traveled lane or adjacent thereto on two or fourlane highways with partial limited access control Bicycle or pedestrian prohibition on partial control limited access facilities due to unusual safety conditions. Headquarters approval of trails within the limits of partial control limited access highways State Design Engineer approval of altering right of access by abutting property owner - modified limited access control Design analysis of highways on which modified access control may be applied Access deviation approval where modified control is to be established and commercial areas may be excepted from control when all or most of the abutting properties have been developed Access deviation for any access that has been allowed to remain within the first 130 ft of an intersection - modified access control Department approval of designated school bus loading zone on traveled lane or adjacent thereto on rural two or four-lane highways with modified control Bicycle or pedestrian prohibition on modified control facilities due to unusual safety conditions. When trails are allowed on modified control limited access highways Negotiated width for approach type Local agency approval for any planned frontage road, county road, city street or cul de sac. Local agency written agreement to accept and maintain the new section as a county road or city street Request of local agency, private agency or private individual for state to build frontage road not the responsibility of the state upon reimbursement for all costs Turnback Agreement 1430.03(3)(d), 1430.04(3)(a)

N/A

DDP

RFP

WSDOT

Final

DDP

1430.03(6)

RFP

WSDOT

Final

DDP

1430.04(1)

N/A

DDP

1430.04(3)(b)

RFP

WSDOT

Final

DDP

1430.04(4)(b)

N/A

DDP

1430.04(5)(b)

N/A

DDP

1430.04(6) & Traffic Engineering Branch of Operations and Maintenance 1430.04(7)

N/A

DDP

N/A

DDP

1430.05(1)

N/A

DDP

1430.05(2)(b)

N/A

DDP

1430.05(2)(c)

N/A

DDP

1430.05(3)

N/A

DDP

1430.05(5)(b) & 1430.04(5)(b)

N/A

DDP

1430.05(6) & Traffic Engineering Branch of Operations and Maintenance 1430.05(7) 1430.06(2) 1430.07

N/A

DDP DDP DDP

N/A RFP Contract RFP RFP WSDOT DB WSDOT WSDOT DB WSDOT DB WSDOT DB 15% 15% 15%

Final Draft

DDP

1430.07 Contract RFP 1430.07(1) Contract 1430.08 & Agreements Manual RFP Contract

DDP

DDP

DDP August 2006

Special Provisions for use of a direct 15% RFP WSDOT Determination - MS: Meets Standards approach by a railroad company for ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard other than those shown on the right of 1430.09(3) way and limited use plan and included in the right of way negotiations

Page 18 of 41

Proj. No.
Special Provisions for use of a direct approach by a railroad company for DESCRIPTION other than those shown on the right of way and limited use plan Environ., and included Div. 2Hearings, in the right of way negotiations Approval of modification to limited access highways by the E&EP Director or FHWA including right of way and limited access plan. New deeds if private approaches involved. Engineering review and recommendations, appraisals Modifications for Public At-Grade Intersections - request by or through local agency, intersection plan

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


REFERENCE
1430.09(3)

Location

DDP

WHEN
Contract

BY WHOM
DB

Status

REMARKS

& Permits

DDP

1430.10(1) & (2)

RFP

WSDOT

Final

DDP

1430.10(1),(2) & (3)

RFP

WSDOT

15%

Managed Access

1435
I-405 is a full control access highway. All connecting state highways are either full control or are within city limits so managed access does not apply.

DDP

1435.01, 1435.05, Access connection permits for all state 1435.06, managed access highways outside 1435.06(1), (2), (3) incorporated towns and cities & (4) Conforming Access Connection Permit Median Openings Nonconforming access connection permit Class 1 Justification through traffic analysis signed and sealed by a qualified professional engineer for exception to right turn only access connection to multilane facility - Class 1 1435.01, 1435.06, & 1435.06(1) 1435.01, 1435.06 & 1435.06(4) 1435.02(1)(b)(2) & 1435.06(2)

N/A

DDP DDP DDP

N/A N/A N/A

DDP

1435.02(1)(b)(2)

N/A

DDP

DDP

DDP

Addition of new access points, public or private, that might require signalization need engineering 1435.02(2)(b)(1) analysis signed and sealed by a qualified professional engineer - Class 2 Nonconforming access connection 1435.02(2)(b)(2) & permit - Class 2 1435.06(2) Variance permit based on special conditions and the exception is justified through traffic analysis signed 1435.02(2)(b)(2) and sealed by a qualified professional engineer - Class 2 For private access connections justification through traffic analysis signed and sealed by a qualified professional engineer for exception to 1435.02(2)(b)(2) right turn only access connection to multilane facility, only if left turn channelization is provided - Class 2 Special conditions justify TWLTL and main line volumes are below 25,000 1435.02(3)(a) ADT - Class 3 Addition of new access points, public or private, that might require signalization need engineering 1435.02(3)(b)(1) analysis signed and sealed by a qualified professional engineer - Class 3 Nonconforming access connection 1435.02(3)(b)(2) permit - Class 3 Variance permit based on special conditions and the exception is 1435.02(3)(b)(2) & justified through traffic analysis signed 1435.06(3) and sealed by a qualified professional engineer - Class 3 Addition of new access points, public or private, that might require signalization need engineering 1435.02(4)(b)(1) analysis signed and sealed by a qualified professional engineer - Class 4 Nonconforming access connection 1435.02(4)(b)(2) & permit - Class 4 1435.06(2) Variance permit based on special conditions and the exception is 1435.02(4)(b)(2) & justified through traffic analysis signed 1435.06(3) and sealed by a qualified professional engineer - Class 4 Addition of new access points, public or private, that might require signalization need engineering 1435.02(5)(b)(1) analysis signed and sealed by a qualified professional engineer - Class 5 Nonconforming access connection 1435.02(5)(b)(2) & permit - Class 5 1435.06(2)

N/A

N/A

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

DDP

N/A

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 19 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP

DDP

Variance based on special Div. 2 -permit Hearings, Environ., & Permits conditions and the exception is 1435.02(5)(b)(2) & justified through traffic analysis signed 1435.06(3) and sealed by a qualified professional engineer - Class 5 Corner Clearance - Single access 1435.03, connection closer than minimum 1435.03(c) & WAC access point spacing requirements 468-51 conforming clearance permit Backup data justifying a significant change in use causing a change in the category of the access connection permit or one that causes an operational, safety or maintenance problem on the state highway requiring a new permit

N/A

N/A

PF

1435.08(1) & (2)(a)

N/A

DDP

DDP

PF DDP

Department construction projects notification to affected property 1435.08(2)(b) owners, permit holders, business owners and emergency services Variance permit if a business cannot function properly with only one access 1435.08(2)(b) connection as a result of a department construction project Surety Bond when owner's contractor 1435.08(3) & WAC performs construction work to 468-51-070 complete access connection Adjudicative proceedings 1435.10 correspondence, exhibits

N/A

N/A

N/A N/A

Surveying and Mapping


PF Notification of impact to geodetic monuments to HQ Geographic Services Office Document the procedure and combined factor for converting between datums DNR Permit application for monuments to be disturbed or removed Record of Survey or Monumentation Map Post Construction Survey DNR Completion Report (copy) Original to DNR Report of Survey Marks Summary of Legal Research Primary and secondary survey control data to WSDOT Monument Data Base

1440
1440.03(2)(c) DB

PF

1440.03(2)(d)

PF PF DDP DDP PF PF

1440.03(2)(e) 1440.03(2)(h) 1440.03(3)(a) 1440.03(3)(b) 1440.06 1440.03(1)(b) 1440.09

DB WSDOT Submitted with Right of Way Plan

DB DB DB

Monumentation
PF PF PF PF PF PF PF PF PF PF PF General statement about project's impacts on existing monuments General statement concerning new monuments DNR Permit for disturbing monuments Variance for omitting monumentation Record of Survey Mark Monumentation Map Record of Survey Land Corner Record DNR Permit for any monumentation work Field notes DNR Completion Report

1450
1450.01, & Figure. 1450-1 1450.01, & Figure. 1450-1 1450.01, & Figure. 1450-1 1450.04 1450.04 1450.04, .05, .07, 1450.09(2) 1450.06 1450.07, & 1450.09(3) 1450.09(1) Hwy Surveying Manual 1450.09(1) Contract Contract DB DB

RFP Contract RFP RFP Contract Contract RFP Contract Contract

WSDOT DB WSDOT WSDOT DB DB WSDOT DB DB

Final

Final Final

30%

Fencing
DDP Reasons for providing fencing and for the type and configuration selected Justification for deferring or not providing fencing on a highway with limited access control or as otherwise recommended Evaluation of need to provide fencing around stormwater detention facilities

1460
1460.03(1) through (4) and 1460.04(1) through (3) 1460.03(2) Contract DB

DDP

Contract

DB

DDP

1460.03(4)

DDP August 2006

Evaluation on need to provide fencing 1460.03(4) - MS: Meets for Determination wetland mitigation sites Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

Page 20 of 41

Proj. No.

Project Title:

Draft - DESIGN-BUILD PROJECT DESIGN DOCUMENTATION CHECK LIST


Location

DESCRIPTION

REFERENCE

WHEN

BY WHOM

Status

REMARKS

DDP

Div. 2 - Hearings, Environ., Justification for why corrective action & is not taken when existing fencing with a rigid top rail will be left in place within the limits of a proposed project.
Approval for gates on limited access highways

Permits
1460.04 Contract DB

DDP

1460.05

Contract

DB

Maintenance
PF Maintenance concerns addressed Area Maintenance Supervisor RFP Contract WSDOT DB 30%

Utilities
PF PF PF PF PF PF PF PF PF Preliminary Engineering Agreement Construction Agreement Railroad agreements Railroad insurance and flagging Detour or Haul Road Agreement Service Agreements Local Agency Agreements Transit Agreement Turnback Agreements Utilities Manual, 2-4 Utilities Manual, 2-5 Utilities Manual, 3-5 Utilities Manual, 3-9 Utilities Manual, 4-2 Utilities Manual, 4-3 Utilities Manual, 4-5 Utilities Manual, 4-7 Utilities Manual, 6-1 RFP RFP RFP Contract Contract Contract RFP RFP RFP Contract WSDOT WSDOT WSDOT DB DB DB WSDOT WSDOT WSDOT DB Final Final Areas determined to included on Right of Way Plans Agreement completed Final Final Final

Post Project Development


DDP DDP Construction changes that affect design As - Built Plans Contract Contract DB DB

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 21 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

DB responsible for any changes to configuration

DB responsible for any changes to configuration

DB responsible to update file for any modifications

DB responsible to update file for any modifications

Only if water quality permits are necessary

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 22 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Guidance to be included in the RFP

P/F and then technical score

P/F and then technical score Include in RFP Approved deviations included in proposal Would require contract change

60% - Design File done to an acceptable stage for completing R/W and Access processes 40% - Complete balance of Design File

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 23 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

No blank cells in Interstate matrix

90%

Final 90%

90%

Draft

90% - Early notification to utilities is necessary

15% - 30%

30%

Final Done with R/W Plans

Final 30% - To level needed to determine R/W footprint

90%

Final Final 15% - 30% 90% 10% - Temporary access breaks for construction PS&E items

DETERMINATION
Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 24 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Only necessary when State supplies source

Draft Draft

Draft

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 25 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Final - Needed for Chan. Plan to determine R/W footprint

Final - Needed for Chan. Plan to determine R/W footprint

DETERMINATION

15% 15% 15% 15%

DETERMINATION

15%

15% 15% 15%

DETERMINATION

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 26 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

DETERMINATION

DETERMINATION

15%

15%

DETERMINATION

Draft

Draft

Draft
Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

Draft August 2006

Page 27 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS
Draft

Draft

DETERMINATION

15%

15%

Draft

Draft Draft

DETERMINATION

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 28 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS
To level needed to determine easements for R/W Plan

Draft

DETERMINATION

Draft Final

Final

Final Final

Final

Final Contributions from both teams

Most of these Items may be included in the Intersection Plan for Approval
DETERMINATION

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

15% August 2006

Page 29 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS
15% 15% 15%

15%

15%

15%

15% 15%

15%

15%

15% 15%

Chapter 915 Supplement


15% 15%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 30 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

15%

Final Final Final


DETERMINATION

DETERMINATION

DETERMINATION

(Must include a section for each approach)

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 31 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS
Final

Final Draft

Draft

Most of these items may be included for the I/C plan


DETERMINATION

15% 15%

15% 15%

15% 15%

15%

15%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

15%

Page 32 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS
Final

Final

Final

Final

Final

Chapter 1020 Supplement

15%

DETERMINATION

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 33 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

15%

15%

15% 15%

15%

DETERMINATION

Final

15% 15%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 34 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS Chapter 1060 Supplement
Final Final 15%

Final

Final Final

DETERMINATION

15%

Final

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 35 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Draft

15%

Draft 15%

Draft Draft Draft - 15% Draft - 15%

Chapter 1300 Supplement

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 36 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Final 15%

15%

Final - This must be completed prior to the Access Report and Plan process

Final Final

Final

Initial cost estimate Final - WSDOT/GEC Lead - Risk Item Final - WSDOT/GEC Lead - Risk Item

Final - WSDOT/GEC Lead - Risk Item

Final Final
Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

Final August 2006

Page 37 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Final

Final

Final

15%

Final Draft

15%

15%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

15%

August 2006

Page 38 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Final

15%

I-405 is a full control access highway. All connecting state highways are either full control or are within city limits so managed access does not apply.

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 39 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

Submitted with Right of Way Plan

Final

Final Final

30%

Determination - MS: Meets Standards ENNF: Existing Nonstandard, No Fix ENF: Existing Nonstandard, Will Fix PN: Proposed Nonstandard

August 2006

Page 40 of 41

IGN DOCUMENTATION CHECK LIST


REMARKS

30%

Final Final Final

Final Final Areas determined to included on Right of Way Plans