Sie sind auf Seite 1von 9

Zone Control Chart File

User Instructions (Reference CPI Useful Methods No. 210) This file can be used to generate various sizes of Zone Control Charts. To use: 1 Copy/Paste your data into columns A & B of the Data Page. 2 Enter Target and 1 sigma limit into the red input boxes. 3 Press the "Update Zone Charts" button (below). 4 View the desired Zone Chart. Make any formatting changes necessary. 5 To generate a blank zone chart for hand entry, go to "Zone Chart" tab. 6 Press the Printer icon in the Menu bar on any page, to print chart.

Warning: This file is still under development!!!!!!

Zone Chart Rules


1 Plot points by drawing a circle in the appropriate zone rather than by plotting points at an exact location on the chart. 2 Assign each circle with the appropriate zone box score. 3 With consecutive points that fall on the same side of the centerline, enter the cumulative score inside the circle. 4 Continue the cumulative procedure until a result falls on the opposite side of the line. At that point, the score accumulation ends and a new score begins. 5 If a value falls exactly on the centerline, its score is zero and the previous cumulative score is recorded and maintained. Plot this point directly on the centerline. 6 If a value falls exactly on one of the other zone lines, use the lowest zone score. 7 A cumulative score of 8 or more is a signal that the process average has shifted and is "out of control". A special cause exists. Action should be taken. 8 Record action taken below chart. Following corrective action, the scoring process begins anew. Scoring also begins anew if the process is restarted after a shutdown.

184617179.xls.ms_office

10/30/2013

Red = user input cells. Target = 1 Sigma = Date

Above the line Result


Result-Target Z Score ZoneScore LineCross? Totals > 1 Sigma > 2 Sigma >3 Sigma

Below the line


> 1 Sigma #DIV/0! #DIV/0!

0.00 0.00

#### ###### #### ######

#DIV/0!

#### ####

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

Below the line


> 2 Sigma >3 Sigma #DIV/0! #DIV/0! #DIV/0! #DIV/0! Target 0.00 0.00 +1Sigma +2Sigma +3Sigma -1Sigma -2Sigma -3Sigma 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Test Set Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Jan-01 Feb-01 Mar-01 Apr-01 May-01 Jun-01 Jul-01 Aug-01 Sep-01 Oct-01 Nov-01 Dec-01 Jan-02 Feb-02 Mar-02 Apr-02 May-02 Jun-02 Jul-02

Target = 1 Sigma = 1.00 1.85 1.90 1.70 1.80 1.65 1.55 1.45 1.38 0.99 1.24 1.45 1.55 1.76 1.58 1.47 1.35 1.48 0.99 0.88 1.49 1.52 1.44 1.5 1.51 1.55 1.6 1.48 1.51 1.44 1.35

1.50 0.25 Zone Score 2 2 4 4 6 6 6 0 0 4 6 6 0 2 2 0 0 0 4 8 8 0 0 0 0 0 0 0 0 0 0

Zone Control Chart 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10

0.00

Value Zone Score Comments:

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

##### #####

10 Pt Chart184617179.xls.ms_office

10/30/2013

Zone Control Chart


1.00 0.90
0.80 0.70

0.60 0.50
0.40 0.30

0.20 0.10
0.00

Value Zone Score Comments:

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

### ###

15 Pt Chart184617179.xls.ms_office

10/30/2013

Zone Control Chart 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00
Value Zone Score Comments:
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

## ## 0

31 Pt Chart184617179.xls.ms_office

10/30/2013

Property
Z=

Zone Control Chart of:

0.0 0.0 0.0 0.0 0.0 0.0 0.0

8 4 2 0 0 2 4 8

Current Process Values

Date

Comments

184617179.xls.ms_office

Zone Chart

10/30/2013

Property
Z=

Zone Control Chart of:

0.0 0.0 0.0 0.0 0.0 0.0 0.0

8 4 2 0 0 2 4 8

Difference from STD (Result - Std)

Date

Comments

184617179.xls.ms_office

Zone Chart (2)

10/30/2013

Das könnte Ihnen auch gefallen