Beruflich Dokumente
Kultur Dokumente
AUDIT PLAN
Prepared by
Head Tech Centre/PHQS/Lab-Incharge Month of Audit/ Auditor Implementation Electrical Pressure Thermal Lab Lab Lab
ISO17025 : 1999 Documenta Mechanical clause tion Lab 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10
Quality Sys
Customer Support
ISONumber of NCRs 17025 : Audit Check 1999 List Implementation clause Reference Docume Mechanic Electrical Pressure Thermal number number ntation al Lab Lab Lab Lab 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 5.1 5.20 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 Total NCs Remarks ( observation brief)
Quality Sys
Customer Support
Total NCs
Format number : FR-QM-01-0 AUDIT PLAN - PUNE LAB. ANP Period (mmyy to mmyy) : 04/03 to 03/04 Prepared by Distrubution: Head Tech Centre/PHQS/Lab-Incharge ISOMonth of Audit/ Auditor 17025 : Implementation Pressure Thermal Customer 1999 Documentat Mechanical Electrical Lab Lab Lab Lab Quality Sys Support clause ion 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 ANP ALA SSD AAK PGY
Archana Pradhan Anand Alloli Surendra Dhumal Akshay Kattur Praful Yelve
Audit plan for Pune Calibration Laboratory (April 2003 to May 2004)
Audit Date and Time 01/09/2003, 9.00 to 12.00 AM 01/10/2003, 9.00 to 12.00 AM 01/10/2003, 1.00 to 3.00 PM 01/11/2003, 9.00 to 12.00 AM 01/11/2003, 1.00 to 3.00 PM 01/12/2003, 9.00 to 12.00 AM 05/01/2004, Complete Day 02/02/2004, 9.00 to 12.00 AM 01/03/2004, 9.00 to 12.00 AM 02/02/2004, 1.00 to 3.00 PM 02/04/2004, 9.00 to 12.00 AM 01/03/2004, 1.00 to 3.00 PM 02/04/2004, 1.00 to 3.00 PM 5/3/2004 Complete Day
5.1 to 5.10
Swapnil Dhudwadake
Akshay Kottur
Electrical
4.1 to 4.12
Swapnil Dhudwadake
Nitin Thakur
5.1 to 5.10
PG Yelve
Nitin Thakur
Thermal
4.1 to 4.12
PG Yelve
Surendra Dhumal
5.1 to 5.10
Surendra Dhumal
Anand Alloli
All fields
All
Archana Pradhan
Anand Alloli
4.1 to 4.12
PG Yelve
Akshay Kottur
5.1 to 5.10
PG Yelve
Anand Alloli
Electrical
4.1 to 4.12
Anand Alloli
Surendra Dhumal
5.1 to 5.10
Akshay Kottur
Nitin Thakur
Thermal
4.1 to 4.12
Anand Alloli
Akshay Kottur
5.1 to 5.10
Akshay Kottur
Surendra Dhumal
All fields
All
Archana Pradhan
Anand Alloli
Note - This audit schedule is to be strictily followed, It is auditees responsibility to get him audited, hence concern person must keep the track of it.
Audit plan for Mulund Calibration Laboratory (April 2003 to May 2004)
Audit Date and Time 25/08/2003, 9.00 to 12.00 AM 15/09/2003, 9.00 to 12.00 AM 15/09/2003, 1.00 to 3.00 AM 15/10/2003, 9.00 to 12.00 AM 15/10/2003, 1.00 to 3.00 AM 15/11/2003, 9.00 to 12.00 AM 24/12/2003, Complete Day 25/01/2004, 9.00 to 12.00 AM 15/02/2004, 9.00 to 12.00 AM 25/01/2004, 1.00 to 3.00 AM 15/02/2004, 1.00 to 3.00 AM 25/03/2004, 9.00 to 12.00 AM 15/11/2003, 9.00 to 12.00 AM 25/05/2004, Complete Day
5.1 to 5.10
Anand Alloli
Baburao Kumbhar
Electrical
4.1 to 4.12
Anand Alloli
Madhukar Wale
5.1 to 5.10
Surendra Dhumal
Pratiksha Dhumal
Thermal
4.1 to 4.12
Surendra Dhumal
Madhukar Wale
5.1 to 5.10
PG Yelve
Pratiksha Dhumal
All fields
All
Archana Pradhan
Praful Yelve
4.1 to 4.12
Akshay Kottur
Swapnil Dhudwadake
5.1 to 5.10
Anand Alloli
Baburao Kumbhar
Electrical
4.1 to 4.12
Akshay Kottur
Madhukar Wale
5.1 to 5.10
Anand Alloli
Pratiksha Dhumal
Thermal
4.1 to 4.12
Swapnil Dhudwadake
Madhukar Wale
5.1 to 5.10
PG Yelve
Pratiksha Dhumal
All fields
All
Archana Pradhan
Praful Yelve
Note - This audit schedule is to be strictily followed, It is auditees responsibility to get him audited, hence concern person must keep the track of it.
Name & Signature of Internal Auditor Applicable ISO-17025:1999 clause: Ref procudure/document Corrective Action Planned
Name & Signature of Auditee Target Deate of completion Actual Date of completion Follow up audit comment (by PHQS/Quality Manager/ Internal Auditor)
Date