Sie sind auf Seite 1von 66

Priority No.

Name & Address of the Unit

Category Product

Gopal Global Developers (P) Ltd., Krishna Vatika Ballabgarh, Sec-1, Faridabad, Ballabgarh Gold Field Hospital & Research Centre, VillChainsa, Ballabgarh, Faridabad

Group Housing Colony Hospital & Research Centre

3 4

Hyderabad Industries Ltd., Aerated Hysil Sec-25, Ballabgarh, Faridabad Defence Land Systems India Fabrication & Pvt. Ltd., Prithla, Palwal, Production of upHaryana Armound, Armound vehicles and other defense related products for defense & security Orient Fans Propritors Orient Electric Fans, Paper & Industries Ltd., Plot Compact No. 11, Sec-6, Faridabad Florucent Lamps Cosmic Consumer Goods Pvt. Ltd., Plot No. 206, Sec-58, Faridabad Trinity Touch Pvt. Ltd., Prithla, Dathir Road, Dudhola, Palwal Faridabad. Era Land Marks, Sec-78, Village- Faridpur, Faridabad. PVC Flooring / Films/ leather Plastic manufacturing Group Housing Project

6 7 8

National Institute of Immunology, Khasra No. 3/2, Village Bhankri, Faridabad.

10

Project is construction of Education, Training and Research Nutech Print Services, Plot Printing of Book, No. 344, Sec-51, Phase-II, Catalogues, Industrial Area, Faridabad. Calandars, Diaries Gupta Exim (India) Pvt. Ltd., Chhaprola Road, Village Prithla, Palwal SKH Properties Pvt. Ltd., 49 KM, Mathura Road, Village Prithla, Distt & Tehsil, Palwal. National Highway Authority of India, 6 Laining of DelhiAgra Section of NH-2, Faridabad and Palwal S.S. Waste Management Co., Village - Chaprola, Distt.Palwal L.P. Hospitality Pvt. Ltd., 12/7, Hatura Road, Faridabad Star Wire India Ltd., Plant-II Chhainsa, Mohana Road, Chhainsa, Ballabgarh, Distt.Faridabad Century NF Castings, 1KM Stone Mundkati Seoli Road, Village-Seoli, Tehsil - Hodal, Distt.- Palwal Deepak Industries Ltd., Village Baghola, Palwal. Vikas Buildmart Pvt. Ltd., VillageMatana, Sec-7A, Fatehabad Mitra Industries Pvt. Ltd., 14/4, Mathura Road, Faridabad Ready made knitted Garments Painting of cabs

11 12

13

Six Laning

14 15 16

Bio-Medical Waste Service Provider Residential Hotel & Restaurant Rolling Mill

17

Aluminium Alloy Ingot zinc alloy ingot Automotive gears Residential Plots Blood Collecting bags. CAPD Bags

18 19 20

21

Escorts Constructions Equpment Ltd., Plot No. 219, Sec-58, Ballabgarh (Expension Case)

Crane, Loader & Compactor

22 23

Gail (India) Ltd., Chainsa, Installation of Distt.- Faridabad Compressors Alchem Internatioanl Ltd., Solvent Extraction 25/2, Mathura Road, of Herbs, Leaves Ballabgarh barks & Roots etc. Pranav Vikas (India) Ltd., PAF Cooling Coil 73/8 Main Delhi-Mathura Road, Hodel, Distt.-Palwal. DEE Development Engineers Pipe Fabrications Ltd., Village - Tatarpur, & Pipe Fittings Tehsil Palwal, Distt. Palwal. (Post Facto Case) Era Land Marks, Sec-76, Group Housing Village - Fajjupur Majra Nimka, Distt.Faridabad, Tehsil - Faridabad. Showa India Pvt. Ltd., Plot Electric power No. 23-32, Sec-58, steering, Shock Ballabgarh, Faridabad. absorber JBM Industries Ltd., Plot No. Sheet Metal 269, Sec-24, Faridabad. Component, LPG Cylinder and nut bolts Vatika IT Park at Sec-27B, IT Park VillSarai Khawaja, Faridabad

24 25

26

27 28

29

30 31

Vipul Ltd., Vipul Plaza, Sec81, Bhatola, Faridabad. Metro Speciality Hospitals Pvt. Ltd., Sec-16A, Faridabad. GEPIL, Faridabad- Gurgaon Road, Pali, Faridabad.

32

Commercial Colony Hospital for Medical Treatments (250 beds) E-Waste Management Facility

33

34 35

P.R. Packagings Ltd., SehrolaDuplex Mono Chhaprola Road, Prithla, Cartons, Folded Tehsil-Palwal, Distt.-Palwal Cartons, (Haryana) Corrugated Boxes & Allied product of paper & Paper Board with printing Craftsman Automation Pvt. Head & Block and Ltd., Plot No. 214, Sec-58, Transmission part Faridabad. for Tractor Shivani Locks Pvt. Ltd., Sheet Metal 49/4, Mathura Road, Prithla Automobile (Haryana). Component, Door Latch Locks mfg. Andritz Hydro Pvt. Ltd., 49/5, Village Prithla, Distt. Palwal. (Haryana). Turbine, Valve, Switchyard, Turbine Accessories Pooja Forge Ltd., (Unit III), Wire Rods/Wire , 14/4, Mathura Road, Bults/Nots/Screw Faridabad (Haryana). s

36

37

38

39 40

41

42

Kanhaiya Coils & Tubes Pvt. Steel Tube with Ltd., Prithla-Tatarpur Road, Phosphating VillagePrithla, Palwal Process (Haryana). Countrywide Promoters Pvt. Housing Project Ltd., Village Budena, Sec86, Faridabad. Countrywide Promoters Pvt. Housing Project Ltd., Village Kherikalan, Sec - 82 - 88 & 89, Faridabad. Hindustan Syringes & Disposable Plastic Medical Devices Ltd., Jajru Syringes Road, Sec. 59 - II, Jharsently, Ballabgarh, Faridabad (Haryana). Ecocat India Pvt. Ltd., Plot Catalytic No. 4, 20th Mile Stone, Convertor Mathura Road, Faridabad.

43

44

The Printers House Pvt. Ltd., Web-offset 22/1, Mathura Road, Printing Machines Ballabgarh, Distt. Faridabad (Haryana). Psychotropics India Ltd., Tablets, Capsules, Plot No. 141, DLF, Industrial Liquid Area, Mathura Road, Faridabad. (Through RO)

45

Saffron India Hotels & Resorts (P) Ltd., 12/6, Mathura Road, Sec-35, Village Sarai Khawaja, Distt. Faridabad

Food service accomdation

46

Era Landmarks Ltd., Sec-8, Palwal, Faridabad. (Expansion Case)

Construction Project

Total Number of NOCs Granted Total Number of Observations Issued (SCN) under Process SCN for Deemed NOC Transfer to R.O. Total Number of cases rejected/delisted Exemption from getting NOC from the Board Cannot Considered Total NOC Applied

Construction of 765 KV Single Circuit Agra

Investment Cost

Date on which case Marked to TAC 01.04.2011

Date on which case decided by TAC 07.04.2011

23.27 Cr.

2754.30 Lac

20.04.2011

05.03.2012

3020 Lac 3700 Lac

20.04.2011 28.04.2011

11.04.2012 21.10.2011

29 Cr.

27.05.2011

20.12.2011

10.03 Cr. 24.98 97 Cr.

30.05.2011 27.06.2011 28.06.2011

10.06.2011 8.7.11 08.07.2011

136 Cr.

12.07.2011

17.10.2011

17.30 Cr.

12.07.2011

21.09.2011

26.81 Cr. 48 Cr.

19.07.2011 10.08.2011

17.10.2011 04.05.2012

971.89 Cr.

01.09.2011

14.11.2011

42 Lac 2941.00 Lac 47 Cr.

07.09.2011 07.09.2011 09.09.2011

12.09.2011 05.03.2012 21.09.2011

3623 Lac

16.09.2011

05.10.2011

10.22 Cr. 97.89 Cr. 11.96 Cr.

07.10.2011 10.10.2011 10.10.2011

20.12.2011 08.11.2011 05.03.2012

10.45 Cr.

12.10.2011

21.12.2012

590 Cr. 29.16 Cr.

13.10.2011 15.11.2011

04.11.2011 05.03.2012

30 Cr. 98 Cr.

15.11.2011 15.11.2011

05.03.2012 15.02.2012

240.23 Cr.

15.11.2011

20.12.2011

147 Cr. 66.49 Cr.

01.12.2011 01.12.2011

30.03.2012 20.12.2011

161 Cr.

20.12.2011

05.03.2012

60 Cr. 106.07 Cr.

30.01.2012 24.02.2012

05.03.2012 25.07.2012

20.25 Cr.

24.02.2012

16.05.2012

45 Cr.

05.03.2012

19.03.2012

18.75 Cr. 49.14 Lac

18.01.2012 28.03.2012

05.03.2012 04.05.2012

46.67 Cr.

29.03.2012

09.04.2012

1729 Lac

29.03.2012

10.04.2012

1510.15 Lacs

19.04.2012

04.05.2012

200 Cr. 112.47 Cr.

19.04.2012 19.04.2012

04.05.2012 04.05.2012

39.14 Cr.

11.06.2012

07.01.2013

14.49 Cr.

25.06.2012

10.12.2012

5275.48 Lacs

25.06.2012

17.07.2012

17.94 Lac

The NOC case is shifted Sub Committee to TAC in compliance of order No. 64706500 dt. 27.06.2012

06.08.2012

10.64 Cr.

49 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 64706500 dt. 27.06.2012 The NOC case is shifted Sub Committee to TAC in compliance of order No. 64706500 dt. 27.06.2012

07.01.2013

06.11.2012

ed (SCN)

listed the Board

38 4 2 0 0
1

1 0 46

on of 765 KV Single Circuit Agra-Jhatikra transmission line.

Decision taken by Committee

Decision No. & Date

Remarks

Granted

No. 1014 dt. 13.04.2011 No. 7103 dt. 12.03.2012

Granted

Rejected due to non submission of Environmental Clearance

Rejected

Granted Granted

No. 234 dt. 24.04.2012 No. 3049-54 dt. 24.10.2011

Granted Granted

Granted

No. 6331-36 dt. 22.12.2011 No.1746 dt.14.06.2011 No. 2063-68 dated 8.7.11 No. 2053-58 dt. 08.07.2011

Granted

Granted Extension granted upto 12.2.2013 Estension granted upto 30.04.2013

Granted granted Granted

Granted

No. 2982 -87 dt. 18.10.2011

Granted

Granted

No. 2784-89 dt. 26.09.2011 No. 2976-81 dt. 18.10.2011 No. 341-346 dt. 09.05.2012 No. 5069-71 and No. 5072-89 dt. 16.11.2011 No. 2655-60 dt. 13.09.2011 No. 6965-6970 dt. 06.03.2012 No. 2798-2803 dt. 26.09.2011 No. 2847-52 dt. 05.10.2011 No. 6373-78 dt. 22.12.2011 No. 4079-84 dt. 09.11.2011 No. 7050-55 dt. 09.03.2012

Granted

Granted Granted

Granted Granted

Minutes of the public hearing sent to MoEF Extension Granted upto 31.12.2011 Granted Extension Granted upto 16.08.2012 Granted

SCN

Granted Granted Granted

Granted

Granted Granted Granted

Granted Granted Granted

1. To submit EIA clearance. No. 2508 -09 dt. 2. To submit proper design scheme 31.12.2012 of ETP/ STP. And RO asked to submit the report / recommendation as already asked vide this office letter No. 1749 dt. 05.11.2012 and also explain his position, as to why he has not replied to this office letter No. 1749 dt. 05.11.2012 even after expiry of more than one month period. It will be Final Opportunity to comply within 3 days Extension Granted up 30.04.2012 No. 4025-30 dt. 09.11.2011 Granted No. 7014-19 dt. 09.03.2012

SCN

Granted Granted

Granted Granted

No. 7013-7017 dt. 06.03.2012 No. 448-53 dt. 24.02.2012

Granted Granted

Extension granted upto 15.06.2013 Granted Granted

No. 6307-12 dt. 22.12.2011 No. 46-51 dt. 04.04.2012 No. 6385-90 dt. 22.12.2011 NO. 7086-91 dt. 09.03.2012

Ex-Granted

Granted Granted

Extension Granted upto 16.06.2015

Granted

Granted Applicant asked to apply for EIA clearance from Competent Authority Granted

No. 7056-61 dt. 09.03.2012 No. 1085 dt. 30.07.2012 No. 513-518 dt. 21.05.2012 Corrigendum issued in the name of "M/s Gujarat Enviro Protection & Infrastructure (Haryana) Pvt. Ltd.," vide No. 1396-1401 dt. 10.09.2012 No. 7264-69 dt. 21.03.2012

Granted SCN

Granted

Granted

Granted

Exemption Granted Granted

No. 7032-37 dt. 09.03.2012 No. 368-373 dt. 09.05.2012

Exemption Granted Granted

Granted

No. 228-233 dt. 24.04.2012 No. 119-124 dt. 10.04.2012

Granted

Granted

Granted

Granted

No. 296-301 dt. 04.05.2012 No. 581-86 dt. 23.05.2012 No. 476-481 dt. 18.05.2012 No. 2600-2605 dt. 09.01.2013

Granted

Extended upto 19.07.2014 Extension Granted upto 19.07.2014 Granted

Extension Granted Extension Granted Granted

1. Not deposited balance fee of Rs. 24,000/-. 2. Not intimated total builtup area. 3. Decision regarding requirement of Environment Clearance can be taken after the information of built up area of the unit. And RO Ballabgarh asked to submit latest status of the unit and applicability of EIA clearance RO asked to submit report and recommendation alongwith his explanation for delay RO asked to provide the information about Environmental Clearance

No. 2309-2310 dt. 17.12.2012

SCN

No. 1027 dt. 25.07.2012 No. 1252 dt. 28.08.2012

UNDER PROCESS
The case be marked to the incharge of Concerned Consent Branch for preparing the

Extension Granted upto 07.04.2013

No. 2626-31 dt. 10.01.2013

Granted

Extension Granted upto 30.11.2013

No. 2015-20 dt. 16.11.2012

Granted

mission line.

Up-to-date Status of NOC (Gurga


SCN Rejected Exemption from getting NOC
Priority No. Name & Address of the Unit Category Product

Under P

NOC GR

1 2

Orris Flower Tower, NH-48, Old NH8, Kheri Daula, Manesar, Gurgaon

Construction Project

3 4 5 6 7

DLF New Gurgaon Home Develpers Group Housing Pvt. Ltd., DLF" Group Housing Project Project, Sec- 79, Vill- Naurangpur, Gurgaon S.S. Breweries Pvt.Ltd., at Bhondsi, Beer Tehsil-Sohna, Distt- Gurgaon Magnum International Trading Co. Group Housing Pvt. Ltd., Village - Sihi, Sec- 84, Project Distt- Gurgaon Bestech Motels & Resorts Pvt. Ltd., Construction Revenue Estate, Town-Bohra Project Khurd, Distt- Gurgaon Ilabs info Technology Center Pvt. IT& ITES, Media Ltd., Plot no. 404 & 405, Udyog Services Vihar, Phase-III, Gurgaon. Mapsko Builders Pvt. Ltd., Sector- Group Housing 82 & 83 Shikohpur & Sihi, Gurgaon, Project Haryana

Suzuki Powertrain India Ltd., Plot Four / Two No.1, Phase-3A, IMT Manesar, Vehicle Engines Developed by HSIIDC. and Transmission and spare parts Unitech Commercial Centre, Sec-71, Commercial Village - Fazilpur, Jharsa, Gurgaon. Complex Project Raheja Developers Pvt. Ltd., Sec92/95, Distt. - Gurgaon Ansal Institute of Technology, Sec55, Gurgaon Well Worth Project Developers Pvt. Ltd., Sec-65, Village -Badshahpur, Distt- Gurgaon 3R-Recycler, Plot No. 266, Sec-8, IMT, Manesar, Gurgaon Housing Complex Educational Building Construction Project

9 10 11 12 13

14 15 16 17

E-Waste Dismantling Segregation of Electronic Components Jassum Propcon Projects Pvt. Ltd., Construction Sec-25, M.G. Road, NH-8, VillProject Sukhrauli, Gurgaon Emmar MGF Land Ltd., Vill- Group Housing Shikhopur, Sec-77, Gurgaon. Honda Motorcycle and Scooter Technical India Pvt. Ltd., Plot No. 1 & 2, SecCentre 3, IMT, Manesar, Distt Gurgaon Varun Beverages Ltd., Village Carbonated / Tejpur, Nuh, Distt. Mewat non carbonated Beverages / juice / perform & water Uniworld Resorts Infospace SEZ, IT SEZ Project Sector-48, Village Tikri, Gurgaon Land Base India Ltd., Village- Five Star Resort Gangani, P.O. Hasanpur, Tauru, Gurgaon. A.N. Buildwell Pvt. Ltd., Plot No. CP- IT Park Project 4, Sec-8, IMT, Manesar, Gurgaon

18 19 20

21

22

Mars Industries Pvt. Ltd., (Unit-I), Lever Handles, Binola Industrial Area, Bhora Kalan, Locks, Builders, Farukh Nagar, Gurgaon Hardware, Sanitary Fittings& Automotive Parts Ramada Gurgaon Central (A unit of Hotel Industry Greenland Hospitality Pvt.Ltd.,) Plot No. 2, Sec-44, Gurgaon Subros Ltd., Sec-M-ID, VillageResidential Laknaula Manesar, Gurgaon Colony Bestech India Pvt. Ltd., Sec-81, Group Housing Village - Nakhnaula, Distt- Gurgaon Project Shyam Communication Village - Narsinghpur, Gurgaon Systems, Sec-74A, Construction Commercial Complex Project

23 24 25

26 27

Conscient Infrastructure Pvt. Ltd., Group Housing Village -Ullawas, Sec-62, Gurgaon Project Pioneer Urban Land & Infrastructure Ltd., Vill- Ghata, Sec62, Gurgaon (3.953 acres) Krishna Ishizaki Auto Ltd., 58 Mile Stone, Delhi-Jaipur Highway, Village - Binola, Gurgaon Mitsubishi Electric Automotive India Pvt. Ltd., Plot No. 167-170, Sec-5, IMT, Manesar, Gurgaon Maruti Suzuki India Ltd., Palem Gurgaon Road, Gurgaon Mayar Infrastructure Development Pvt. Ltd., Vill- Rahaka & Nimoth, Tehsil-Sohna, Distt- Gurgaon Commercial Complex Plastic Parts, Automotive, Rear View Mirror Distributor, EPS, EPS Motor, ECU, Starter, GMR Sensor, Audio Power Generation SEZ

28

29

30 31

32

ITC Ltd., Plot No. 3, Sec-5, IMT, Construction of Manesar, Distt. Gurgaon Industrial office Building project Countrywide Promoters Pvt. Ltd., Residential Sec-102 & 102A, Village - Kherki Township Majra & Dhankot, Gurgaon Project Countrywide Promoters Pvt. Ltd., Group Housing Village - Ghata, Sec-61, Gurgaon Project Suzuki Powertrain India Ltd.,, Plot Casting No. 26-B, Sec-3, IMT, Manesar. components four/two wheeler Engine and Transmissions Soni Infratech Pvt. Ltd., Village - Group Housing Badshahpur, Sec - 68, Gurgaon. Project Genuine Promoters, Sohna Road, University for Sohna, Gurgaon Engineering & Technology, Professional & Management College CHD Developers Ltd., Sec-71, Tehsil- Group Housing Gurgaon, Distt.- Gurgaon Project Skyhigh Hospitality Pvt. Ltd., Hotel 463/8, Krishna Colony, Opp.Restaurant Taneja Hospital, Gurgaon Vatika Ltd., Sector 82A, Construction Shikohpur, Gurgaon Project Indo Autotech Ltd., Plot No. 132- Motor Vehicles, 133 IMT Manesar, Gurgaon parts with phosphating & powder coating Endurance Technologies Ltd., UnitII, IMT Manesar, Gurgaon Pressure die casting components for automobile Industries Ltd., Hotel -cum Commercial Complex

33 34 35

36 37

38 39 40 41

42

43

Uppal Hospitality Pvt. Shikohpur, Sohna, Gurgaon

44 45

Countrywide Promoters Pvt. Ltd., Group Housing Village - Medhawas, Sec - 66 & 67, Project Gurgaon Dr. Fresh Health Care Pvt. Ltd., IT/ITES SEZ Village Ghamroj, Tehsil- Sohna, Project Gurgaon Sohna Road, Gurgaon Toucan Real Estates Pvt. Ltd., Hotel Cum Village-Ullahwas, Manesar Urban Commercial Complex, Sec-60, Gurgaon. Project Wellworth Construction Pvt.Ltd., Construction Sec-49, Gurgaon-Sohna Road, Project Gurgaon. DLF New Gurgaon Homes Group Housing Developers Pvt. Ltd., DLF New Project Town Heights, Group Housing Project, Sector 90, village Hayatpur & Wazirpur Distt. Gurgaon (Haryana) DLF New Gurgaon Homes Group Housing Developers Pvt. Ltd., DLF New Project Town Heights, Group Housing Project, Sector-86, Village Nawada Fatehpur Distt. Gurgaon (Haryana) DLF New Gurgaon Homes Group Housing Developers Pvt. Ltd., DLF New Project Town Heights, Group Housing Project, Sector-91, Village Meoka, Distt. Gurgaon (Haryana) Suzuki motorcycle India Pvt. Ltd., Motor Cycles & Village Kherki Dhaula, scooters Badshahapur, Sohna, Gurgaon Dhoot Infrastructure Projects Ltd., Construction Sec-37C, Village - Basai, Gurgaon. Project Dhoot Infrastructure Projects Ltd., Construction Sec-62 & 63, Gurgaon. Project High Responsible Realtors Pvt. Ltd., Construction of Sec-60, Village - Ullawas, Distt. - Group Housing Gurgaon Enkotel Hotels, Village - Construction Badshahpur, Distt.- Gurgaon Project

46 47 48

49

50

51 52 53 54 55

56 57 58

DLF Cyber City Developers Ltd., "Retail Hub in DLF Cyber City", Phase-II, Sec-25, Gurgaon S.S. Breweries Pvt.Ltd., at Bhondsi, Tehsil-Sohna, Distt- Gurgaon A 2 Z E Waste Management Ltd., Plot no. 14 & 15, Rozaka MEO Industrial Area, NHU Mewat.

Retail Hub Beer

59 60

Plastic, Glass, Iron scrap, Aluminum Scrap, Copper. AB Multiplex Pvt. Ltd., Sec-25, M.G. Corporate Road, NH-8, Gurgaon Suites G.S. Lighting Pvt. Ltd., Narsingpur, Ballasts, Gurgaon Electrical Light Fittings PCI Ltd., Udyog Vihar, Phase-II, Gurgaon 3R-Recycler, Plot No. 266, Sec-8, IMT, Manesar, Gurgaon IT Unit E-Waste Dismantling Segregation of Electronic Components Establishment of IT & IT unabled services software development Health Care Services(Hospit al) Tyers & Tubes and other Rubber products Commercial Complex Project

61 62

63

Modlama Exports, Plot No. 184, P-I, Udyog Vihar, Gurgaon (Through RO Gurgaon)

64 65

Alchemist Institute of Medical Services, Sec-53, Sarswati Kunj, Gurgaon Ralsons Communication Technology Pvt. Ltd., Village- Pathreri, Gurgaon Afresh Builders Pvt. Ltd., Sushant Lok-I, Gurgaon C-13,

66 67

Unitech Ltd., Nirvana Country-II, Plotted-cumSec-71-72, Gurgaon. Group Housing Project

68

Mangalam Edu Gate, Revenue Estate, Village- Sohna, Gurgaon

69 70

Ajay Enterprises Pvt. Village Ghasola, Gurgaon Jubiliant Malls Pvt. Ltd., ILD Trade Development & Centre, Sec-47, Sohna Road, Construction of Gurgaon Group Housing Project ILD SPIRE GREENS

Proposed Institutional College (Engineering College, Higher Education-cumManagement Institute) Project Ltd., Near Construction Sec-49-50, Project

71

Pioneer Urban Land & Construction Infrastructure Ltd., Village - Ghata, Project Sec-62, Gurgaon (Extension Case) (3.03725 Acres) Pioneer Urban Land & Construction Infrastructure Ltd., Village - Ghata, Project (24.606 Sec-62, Gurgaon (Extension Case) Acres) Pioneer Urban Land & Construction Infrastructure Ltd., Village - Ghata, Project Sec-62, Gurgaon (Extension Case) (17.4875 Acres) Pioneer Urban Land & Infrastructure Ltd., Village - Ghata, Sec-61, Gurgaon (Extension Case) Construction Project (24.59375 Acres) DLF "Magnolias" In DLF City Phase- Group Housing V, Sec-42, Gurgaon (Extension Project Case)

72

73

74

75

76 77 78 79 80

DLF "Belaire" In DLF City Phase-V, Group Housing Sec-54, Gurgaon (Extension Case) Project DLF "Park Place" In DLF City Phase- Group Housing V, Sec-54, Gurgaon (Extension Project Case) Alicon Cast Alloy Ltd., Binola Die Casting of Industrial Area, Binola, Gurgaon. Cylinder Head Vatika Ltd., NH-8, Village - Sihi, Construction Manesar, Sec-83, Manesar, Project Gurgaon. Sidhartha Buildhome Pvt. Ltd., Old Development & Name (Pashupati Buildwell Pvt. Construction of Ltd.), Group Housing, Ncrone, Sec- Group Housing 95, Wazirpur, Gurgaon. Project NCR One ITC Ltd., Plot No. 3, Sec-5, IMT Construction of Manesar, Gurgaon. Industrial Office Building Nifco India Pvt. Ltd., Plot No. 122, Plastic Sec-8, Industrial Estate, Gurgaon. Fasteners, Cup Holders, Functional Parts Dampers / Latches G.L.S. Industries Pvt. Ltd., Pataudi Road, Bhora Kalan, Bilaspur, Gurgaon. (Post Facto) Mark Exhaust Systems Ltd., Binola, Tehsil Bhora Kalan, Gurgaon. Flexible Packaging Material Door Sash for Automobile

81 82

83

84

85 86

Unitech Ltd., Sec-69, Village Group Housing Fazilpur Jharsa, Gurgaon. Project Ansal Integrated Industrial Estate, Industrial Patheredi, Pataudi, Gurgaon Estate Complex

87 88 89

Umkal Medical Institute Pvt. Ltd., Hospital 3201, DLF, Phase-III, Gurgaon. DLF Alameda, Plotted Colony Group Housing Project, Sec-73, Village Project Begumpur Khatola, Gurgaon. SKH Sheet Metals Components Ltd., Tubular Frame Village- Binola, Near- Bilaspur, for Automotive Manesar, Gurgaon Sheets, Sheet Metal Components for Sutomotives, Exhaust Muffler Ansal API (Ansal Properties and Infrastructure Ltd.) at Palam Vihar, Gurgaon. Construction Project

90

91 92

Energetic Construction Pvt. Ltd., Commercial Sec- 33, Islampur, Gurgaon. building project DSS Infrastructure Pvt. Ltd., Sector- Group Housing 67, Near Badshahpur, Gurgaon Project

93

PMC Buildwell Pvt. Ltd., Spaze Residential Privy, Sector-72 Fazilpur Jharsa, Complex Spaze Gurgaon. Privy New Construction Project DLF Garden City, Plotted Colony, Plotted Colony Sec-91 & 92, Village Bhangrola, Mewka, Dhorka, Gurgaon.

94

95 96

International Recreation and Amusement Ltd., Sec-29, Gurgaon. Creative Buildwell Pvt. Ltd., Sohna Alwar Road, Village Ghamroj, Tehsil Sohna, District Gurgaon.

Construction Project 5 Star Hotel & Suits

97 98

Rico Auto Industries Ltd., Plot No. Automotive 84, Sector 8, IMT Manesar, Components Gurgaon. Emmar MGF Land Ltd., Village Construction of Maidawas, Sector 65 & 66, Residential Gurgaon. Plotted Colony

99

Emmar MGF Land Ltd., (for Emerald Construction of Plaza) Village Badshahpur, Sector commercial 65, Gurgaon. complex Johnson Matthey India Pvt. Ltd., Plot No. 12, Sector-3, IMT, Manesar, Gurgaon. A 2 Z E Waste Management Ltd., Plot no. 14 & 15, Rozaka MEO Industrial Area, NHU Mewat ASK Automotive Pvt. Ltd., (Unit VII), Plot No. 155 & 156, Sec-5, IMT, Manesar, Gurgaon. Auto Catalyst Glass Enamel Products (30,000 bags) Plastic, Glass, Iron scrap, Aluminum Scrap, Copper. Brake Shoe, Brake Pad, Clutch Plate & Automotive components with Pressure die casting Construction Project

100

101

102

103

D.A.V. Public School at VillageFazilpur, Jharsa, Ghasola, Badshahpur, Sec-49, Sohna Road, Gurgaon.

104 105 106

Choice Clothing Co. Pvt. Ltd., Plot Readymade No. 30, Sec-4, IMT, Manesar, Garments Gurgaon (Haryana) Alpha UM Autocomp Ltd., Plot No. Wheel Covers of 402, Sec-8, IMT, Manesar, Gurgaon. Cars Hero Moto Corp Ltd., NH-8, Sec Two Wheelers & 33, Gurgaon. Its Parts installation of 2.01 MW Generator Sebros Auto Pvt. Ltd., Plot No. 181, Sec-5, IMT, Manesar, Gurgaon (Haryana). Krishna Maruti Ltd., P.No. 17-20, Sec-3A, IMT, Manesar, Gurgaon. Reach Promoters Pvt. Ltd., Sec-68, Village Badshahpur, Gurgaon (Haryana). Aluminium Automotive Parts Automotive Seats Commercial Project

107 108 109

110 111

Unitech Realty Pvt. Ltd., Sector-47 Residential Village Fatehpur, Gurgaon. Group Housing Project Unitech Ltd., Sector-15, Part-II, Commercial Vilage - Silokhera, Gurgaon. (Office) Complex Project Gurgaon City Centre Tower-A at Construction DLF City, Phase-V, Sector-43, Project Gurgoan (Haryana). Manglam Multiplex Pvt. Ltd., Sector Group Housing - 65, Medhawas, Gurgaon Project Dr. Fresh Health Care Pvt. Ltd., IT/SEZ Village Ghamroj, Sohna Road, Construction Gurgaon. Project Countrywide Promoters Private Ltd. Construction For Group Housing Project (Park Project Secene) Village-Basai at Sector 37D, Gurgaon (Haryana)

112 113 114 115

116

Ajay Enterprises Pvt. Village Ghasola, Gurgaon

Ltd., Near Sec-49-50,

Commercial Complex

117

Napino Auto and Electronics Ltd., Plot No. 131, Sec-8, IMT Manesar, Gurgaon.

Main wiring harness, Moulding Components, Die casting

118

KML Mouldings (Aunit of Krishana Plastic Moulded Maruti Ltd., Plot No. 18-19, SectorDoor Trims 3A, MSIL Supplier JV Park, IMT, Manesar, Gurgaon.

119

Park Medicenters & Instituations Pvt. Ltd., Block-Q-1, Sec-47, South City-II, Phase-I, Main Sohna Road, Gurgaon (Haryana).

Hospital

120

Gupta Promoters Pvt. Ltd., Eden Group Housing Heights, Sec-70, Gurgaon.

121

Ganpect India, DLF City Phase-V, Sector-53, Gurgaon.

Business process out sourcing (IT/ITES)

122

Malibue Estate Pvt. Ltd., Malibue Town, Sohna Road, Gurgaon.

Residential Colony and Shopping/Office Spaces in IT

123

Aggarwal Developers Pvt. Ltd., Sec- Group Housing 90, Near Village Hayatpur, Project District-Gurgaon (Haryana).

124

Power Grid Corporation of India Construction of Ltd., 765/400 KV Sub Station, 765 KV Single Passing through District Gurgaon. Circuit AgraJhatikra transmission line.

125

Power Grid Corporation of India Construction of Ltd., 765/400 KV Sub Station, 765 KV Single Passing through Nuh (Mewat). Circuit AgraJhatikra transmission line.

126

Power Grid Corporation of India There is no Ltd., 400 KV D/C Manesarproduction Neemrana line (Passing through involved Electric Gurgaon District (Haryana) power in bulk will be Transmitted through Transmission Line

127

Milestone Landbase Estates Pvt. Ltd., Khasra No. 22/1/2/1/1, 2/1/1,3,4/1, Revenue Estate of Village Mollahera, Gurgaon (Haryana).

Hotel Project

Total Number of NOCs Granted Total Number of Observations Issued (SCN) under Process SCN for Deemed NOC Transfer to R.O. Total Number of cases refused/delisted Exemption from getting NOC from the Board Cannot Considered Total NOC Applied

of NOC (Gurgaon (South & North Region)) (2011-12)


Under Process NOC GRANT

Investment Date on which Date on which Cost case Marked case decided to TAC by TAC

215 Cr. 96.75 Cr.

01.04.2011 01.04.2011

07.04.2011 04.11.2011

14.3 Cr. 175 Cr. 48 Cr. 58.50 Cr. 165.49 Cr.

06.04.2011 19.04.2011 20.04.2011 10.05.2011 10.05.2011

28.07.2011 20.09.2011 12.09.2011 23.05.2011 23.05.2011

100 Cr.

10.05.2011

02.09.2011

204.12 Cr. 24.5 Cr. 56.62 Cr. 104.43 Cr. 14.00 Lac.

12.05.2011 12.05.2011 12.05.2011 19.05.2011 19.05.2011

23.05.2011 08.11.2011 05.10.2011 02.09.2011 12.09.2011

32.01 Cr. 300 Cr. 14.66 Cr. 25.07 Cr.

19.05.2011 27.05.2011 01.06.2011 02.06.2011

05.03.2012 04.11.2011 27.06.2011 01.12.2011

499 Cr. 228 Cr. 250 Cr.

08.06.2011 17.06.2011 17.06.2011

24.06.2011 03.10.2011 24.06.2011

13.63 Cr.

17.06.2011

29.08.2011

74.47 Cr.

21.06.2011

26.08.2011

95 Cr. 250 Cr. 500 Cr.

28.06.2011 28.06.2011 29.06.2011

21.10.2011 14.11.2011 21.07.2011

90 Cr. 45.20 Cr.

01.07.2011 01.07.2011

03.10.2011 29.11.2012

26 Cr.

12.07.2011

08.11.2011

220.85 Cr.

12.07.2011

03.10.2011

30 Cr. 40.20 Cr.

12.07.2011 18.07.2011

05.10.2011 18.09.2012

80 Cr.

21.07.2011

29.08.2011

300 Cr. 95 Cr. 285 Cr.

25.07.2011 25.07.2011 26.07.2011

20.12.2011 26.08.2011 03.10.2011

125 Cr. 33.24 Cr.

03.08.2011 08.08.2011

20.12.2011 06.11.2012

150 Cr. 1370.75 Cr. 46 Cr. 14.465 Cr.

08.08.2011 10.08.2011 11.08.2011 18.08.2011

14.11.2011 02.09.2011 12.09.2011 12.09.2011

2954 Lac

18.08.2011

02.09.2011

262.63 Cr.

18.08.2011

10.04.2012

300 Cr. 8.4 Cr.

18.08.2011 19.08.2011

02.09.2011 20.12.2011

120 Cr. 175 Cr. 371.73 Cr.

26.08.2011 07.09.2011 07.09.2011

06.06.2012 12.09.2011 12.09.2011

369.03 Cr

07.09.2011

12.09.2011

179.80 Cr

07.09.2011

12.09.2011

280 Cr. 54.80 Cr. 63 Cr. 505.66 Cr. 60 Cr.

07.09.2011 07.09.2011 07.09.2011 16.09.2011 16.09.2011

21.10.2011 14.11.2011 18.09.2012 & 21.09.2012 05.03.2012 18.09.2012

43 Cr. 14.3 Cr. 4.25 Cr.

16.09.2011 26.09.2011 07.10.2011

06.06.2012 05.10.2011 17.11.2011

34.68 Cr. 12.15 Cr.

10.10.2011 10.10.2011

18.09.2012 04.05.2012

26 Cr. 14.00 Lac.

10.10.2011 12.10.2011

08.11.2011 17.10.2011

36.39 Cr.

12.10.2011

08.11..2011

35 Cr. 49.62 Cr.

12.10.2011 12.10.2011

20.12.2011 08.11.2011

45 Cr. 162.08 Cr.

13.10.2011 13.10.2011

05.03.2012 20.12.2011

150 Cr.

13.10.2011

19.12.2012

25.07 Cr. 252 Cr.

18.10.2011 25.10.2011

04.05.2012 18.12.2012

34.73 Cr.

02.11.2011

01.12.2011

281.36 Cr.

02.11.2011

01.12.2011

199.96 Cr.

02.11.2011

01.12.2011

39.99 Cr.

02.11.2011

01.12.2011

452.32 Cr.

15.11.2011

20.12.2011

231.58 Cr. 232.46 Cr. 23.52 Cr. 63 Cr. 15.86 Lac

15.11.2011 15.11.2011 18.11.2011 15.11.2011 01.12.2011

20.12.2011 20.12.2011 29.03.2012 06.06.2012 20.09.2012

93.23 Cr. 16.20 Cr.

01.12.2011 01.12.2011

05.03.2012 20.12.2011

20 Cr.

01.12.2011

19.03.2012

94.83 Cr.

01.12.2011

19.03.2012

273.78 Cr. 40 Cr.

01.12.2011 01.12.2011

06.04.2012 19.12.2012

60.84 Cr. 420.22 Cr. 55 Cr.

01.12.2011 01.12.2011 01.12.2011

20.12.2011 11.04.2012 17.01.2013

90 Cr.

20.12.2011

20.09.2012

47.11 Cr. 90 Cr.

20.12.2011 10.01.2012

16.01.2012 18.09.2012

120 Cr.

10.01.2012

05.03.2012

425 Cr.

17.01.2012

26.09.2012

168.7 Cr. 20 Cr.

10.01.2012 27.01.2012

17.05.2012 07.11.2012

10.10 Cr. 125 Cr.

24.02.2012 24.02.2012

19.03.2012 03.09.2012

65 Cr.

24.02.2012

17.05.2012

63.86 Cr.

24.02.2012

04.05.2012

4.25 Cr.

24.02.2012

09.03.2012

49 Cr.

24.02.2012

19.03.2012

39.67 Cr.

05.03.2012

18.09.2012

23.90 Cr. 2418 Lac 4.4 Cr.

05.03.2012 14.03.2012 14.03.2012

19.03.2012 29.03.2012 20.09.2012

1100.20 Lac 31 Cr. 100 Cr.

22.03.2012 29.03.2012 04.04.2012

06.04.2012 04.05.2012 07.11.2012

147.94 Lac. 81.67 Lac

04.04.2012 04.04.2012

04.05.2012 11.04.2012

1,036 Cr. 780 Cr. 100.84 Cr. 110 Cr.

04.04.2012 04.04.2012 04.04.2012 04.04.2012

04.05.2012 04.05.2012 11.04.2012 30.11.2012

8.42 Cr.

26.04.2012

21.12.2012

24.57 Cr.

26.04.2012

18.12.2012

28.77 Cr.

26.04.2012

26.09.2012

18 Cr.

26.04.2012

17.05.2012

150.72 Cr.

25.06.2012

19.09.2012

191.58 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012 The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

19.12.2012

149.69 Cr.

22.10.2012

68.25 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

26.09.2012

250 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

07.11.2012

250 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

22.10.2012

23.43 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

07.11.2012

48.30 Cr.

The NOC case is shifted Sub Committee to TAC in compliance of order No. 6470-6500 dt. 27.06.2012

06.11.2012

SCN)

d Board

95 18 3 0 0
11

0 0 127

& North Region)) (2011-12)


SCN for Deemed NOC TRANSFER to R.O. Cannot Considered
Decision taken by Committee Decision No. & Date Remarks

Extension Granted Upto 31.12.2012 Granted

No. 1052 dt. 15.04.2011 No. 4043-48 dt. 09.11.2011 No. 2269 dt. 29.07.2011 No. 2738-43 dt. 21.09.2011 No. 2615 dt. 13.09.2011 No. 1470 dt. 27.05.2011 No. 1498 dt. 27.05.2011

Granted Granted

Delisted due to non submission of NOC from DFO Granted Delisted due to nonsubmission of NOC from DFO NOC extended upto 28.01.2012 Granted

Delisted Granted Delisted Granted Granted

Granted

No. 2560 dt. 05.09.2011

Granted

Granted Granted Granted Granted Delisted due to non submission of permission from HSIIDC for operating E-Waste Plant Granted Granted Granted Granted

No. 1504 dt. 27.05.2011 No. 4061-66 dt. 09.11.2011 No. 2905-2910 dt. 10.10.2011 No. 2554 dt. 05.09.2011 No. 2714 dt. 14.09.2011

Granted Granted Granted Granted Delisted

No. 7044-49 dt. 09.03.2012 No.3080 dt. 08.11.2011 No. 1885-90 dt. 28.06.2011 No 6179 -84 dt. 07.12.2011

Granted Granted Granted Granted

Extension Granted upto 31.08.2013 Granted Extension Granted upto 26.05.2013

No. 1846-51 dt. 27.06.2011 No. 2873-78 dt. 07.10.2011 No. 1858 dt. 27.06.2011

Granted Granted Granted

Granted

No.2375 dt. 29.08.2011

Granted

Granted

No. 2387 dt. 29.08.2011 No. 3031 -36 dt. 24.10.2011 No. 6035-6040 dt. 17.11.2011 No. 2140 dt. 22.07.2011 No. 2897-2902 dt. 07.10.2011 No. 2187-88 dt. 07.12.2012 No. 4085 dt. 09.11.2011 No. 2857-62 dt. 05.10.2011

Granted

Granted Granted Granted

Granted Granted Granted

Granted 1. Not submitted report of Aravali from Deputy Commissioner Gurgaon. Delisted due to non submission of NOC from DFO and NOC from DTP Granted

Granted SCN

Delisted

Granted

No. 2879-84 dt. 07.10.2011 1. The unit has not submitted No. 1506 dt. the Report of Aravali from 24.09.2012 Deputy Commissioner, Gurgaon

Granted

Granted SCN

Extension Granted upto 25.02.2012 Granted Extension Granted upto 26.06.2013 Granted

No. 2405 dt. 29.08.2011 No. 6301-06 dt. 22.12.2011 No. 2411 dt. 29.08.2011 No. 2911-2916 dt. 10.10.2011

Granted

Granted Granted Granted

Granted Granted

No. 6289-94 dt. 22.12.2011 No. 1846-51 dt. 08.11.2012

Granted Granted

Granted Extension Granted upto 28.03.2012 Granted Granted

No. 6029-34 dt. 17.11.2011 No. 2540 dt. 05.09.2011 No. 2679-84 dt. 13.09.2011 No. 2673-78 dt. 13.09.2011

Granted Granted Granted Granted

Granted

No. 2526 dt. 05.09.2011

Granted

Granted

No. 125-130 dt. 11.04.2012

Granted

Extension Granted upto 26.06.2013 Granted

No. 2566 dt. 05.09.2011 No. 6283-88 dt. 22.12.2011 No. 759-64 dt. 11.06.2012 No. 2625-30 dt. 13.09.2011 No. 2661-66 dt. 13.09.2011

Granted Granted

Granted Granted Extension Granted upto 28 .02.2013

Granted Granted Granted

Extension Granted upto 31.03.2013

No. 2639-44 dt. 13.09.2011

Granted

Extension Granted upto 31.03.2013

No. 2667 -72 dt. 13.09.2011

Granted

Granted Granted Reply recevied from unit. Rejected due to non submission of Environmental Clearance The unit has not submitted the Aravali report from Deputy Commissioner

No. 3043-48 dt. 24.10.2011 No. 6041-6046 dt. 17.11.2011 No. 1508 dt. 24.09.2012 No. 7105 dt. 12.03.2012 No. 1471 dt. 24.09.2012

Granted Granted grant noting Rejected SCN

Granted Granted Delisted due to non submission of compliance of the observation

No. 783-788 dt. 11.06.2012 No. 2885-90 dt. 07.10.2011 NO. 6105 dt. 22.11.2011

Granted Granted Delisted

Applicant asked to submit the No. 1486 dt. report of Aravali from DC, 24.09.2012 Gurgaon Applicant request consider for No. 622-28 dt. withdrawing the Consent to 28.05.2012 Establish application and return the BG of Rs. 3,05,000/to the applicant Granted No. 4049-54 dt.09.11.2011 Granted No. 2959 -64 dt. 18.10.2011

SCN Rejected

Granted Granted

Granted

No. 4073-78 dt. 09.11.2011

Granted

Granted Granted

No. 6397-6402 dt. 22.12.2011 No. 4055 -60 dt. 09.11.2011 No. 6989-6994 dt. 06.03.2012 No. 6295-6300 dt. 22.12.2011

Granted Granted

Granted Granted

Granted Granted

Refused due to 1. Not submitted permission from Forest Deptt. 2. Not submitted report of Aravali from Deputy Commissioner Gurgaon.

No. 2544 dt. 03.01.2013

Refused

Granted NOC refused due to non submission of 1. Not submitted Report of Tehsildar through Deputy Commissioner under Aravali Notification. 2. Not submitted permission from Forest Department. 3. License issued by Town and Country Planning Department valid as on date not submitted.

No. 411-416 dt. 14.05.2012 No. 2548 dt. 03.01.2013

Granted Refused

Extension Granted upto 24.06.2012 Extension Granted upto 24.06.2012 Extension Granted upto 24.06.2012 Extension Granted upto 24.06.2012 Extension granted upto 30.08.2012

No. 6210-6215 dt. 07.12.2011 No.6195-6200 dt. 07.12.2011 No.6222-6227 dt. 07.12.2011 No. 6216-21 dt. 07.12.2011

Extension Granted Extension Granted Extension Granted Extension Granted

No. 6325-30 dt. Ex-Granted 22.12.2011

Extension granted upto 30.08.2012 Extension granted upto 29.01.2013 Granted Granted 1. Not submitted the report of Aravali from Deputy Commissioner. 2. Not submitted permission from Forest Department. Granted Granted

No. 6313-18 dt. Ex-Granted 22.12.2011 No. 6319-24 dt. Ex-Granted 22.12.2011 No. 07-12 dt. 02.04.2012 No. 777-782 dt. 11.06.2012 No. 1613 dt. 05.10.2012 Granted Granted SCN

No. 6995-7000 dt. 06.03.2012 No. 6361-66 dt. 22.12.2011

Granted Granted

Granted

No. 7270-75 dt. 21.03.2012 No. 7246-51 dt. 21.03.2012 and Corrigendum issued vide No. 1195 dt. 14.08.2012 No. 79-84 dt. 09.04.2012 No. 2444-49 dt. 21.12.2012

Granted

Granted

Granted

Granted Granted

Granted Granted

Granted Granted Refused

No.6379-84 dt. 22.12.2011 No. 149-154 dt. 11.04.2012 No. 2658 dt. 22.01.2013

Granted Granted Refused

1. Not submitted report of No. 1609 dt. Aravali through Deputy 05.10.2012 Commissioner. 2. Not submitted permission from Forest Deptt. Extension granted upto No. 6552-57 dt. 27.05.2013 17.01.2012 1. The unit has not submitted No. 1500 dt. permission from Forest Deptt. 24.09.2012 2. The unit has not submitted the Report of Aravali from Deputy Commissioner. Granted No. 7062-67 dt. 09.03.2012

SCN

Granted SCN

Granted

Applicant asked to submit report of Tehsildar through DC regarding Aravali as the case is still incomplete for want of said report at your end even after expiry of 45 days time, as already asked vide your letter dt. 04.08.2012

No. 1601 dt. 05.10.2012

SCN

Granted Granted

No. 507-512 dt. 21.05.2012 No. 1840-45 dt. 08.11.2012

Granted Granted

Granted
1. The unit has not submitted the builtup area. 2. The unit has not submitted the permission from Forest Department. 3. The unit has not submitted Aravalli Report from Deputy Commissioner, Gurgaon.

No. 7201-06 dt. 20.03.2012

Granted
SCN

No. 1408 dt. 10.09.2012

Granted

No. 555-560 dt. 21.05.2012 No. 356-361 dt. 09.05.2012 No. 7026-31 dt. 09.03.2012 No. 7222-27 dt. 21.03.2012

Granted

Granted

Granted

Granted

Granted

Granted

Granted

1. Not submitted the report of Aravali from Deputy Commissioner. 2. Not submitted permission from Forest Deptt.

No. 1603 dt. 05.10.2012

SCN

Granted Granted RO asked to explain the reason as to why you failed to submit report and also directed to submit your report already asked vide letter No. 1030 dt. 25.07.2012 Granted Granted

No. 7234-39 dt. 21.03.2012 No. 1-6 dt. 02.04.2012 No. 1624 dt. 05.10.2012

Granted Granted UNDER PROCESS

No. 91-96 dt. 09.04.2012

Granted Granted SCN

No. 398-403 dt. 09.05.2012 1. The unit has not submitted No. 2009 dt. the permission from forest 16.11.2012 Deptt. 2. The unit has not submitted the Aravalli Report from Deputy Commissioner. Extension Granted upto 30.04.2014 Extension granted upto 30.04.2014 Extension Granted upto 05.03.2014 Extension granted upto 05.03.2014 Extension Granted upto 30.03.2013 Granted No. 470-475 dt. 18.05.2012 No. 131-136 dt. 11.04.2012 No. 458-463 dt. 18.05.2012 No. 464-469 dt. 18.05.2012 No. 143-148 dt. 11.04.2012 No. 2149-54 dt. 06.12.2012

Extension Granted Granted

Extension Granted Extension Granted Granted Granted

1. The unit has not submitted the Report of Aravali from Deputy Commissioner. 2. The unit has not submitted the permission from Forest Department of the land mentioned in the Tehsildar Report. RO asked to submit the actual position of the site by conducting the inspection whether the site is fall under Aravali area or not because of the information supplied by you vide letter referred above is not acceptable as it is based upon existence of land in approved industrial area. RO asked to explain the reason as to why you failed to submit report and also directed to submit your report already asked vide letter No. 1014 dt. 24.07.2012 Granted

No. 2514 dt. 31.12.2012

SCN

No. 2554 dt. 03.01.2013

UNDER PROCESS

No. 1622 dt. 05.10.2012

UNDER PROCESS

No. 543 -548 dt. 21.05.2012

Granted

Extension Granted upto 05.03.2012

No. 1457-62 dt. 24.09.2012

Granted

Refused due to 1. Not submitted report of Aravali through Deputy Commissioner. 2. Not submitted Project report. 3. Not submitted balance NOC fees of Rs. 35,000/-. 1. Not submitted NOC from Forest Deptt. 2. Not submitted report Aravali from Deputy Commissioner. And RO asked to submit the latest compliance report of the unit about all Environmental Laws as applicable to the unit being an Ex-Post-Facto Case as per policy. 1. Not submitted Performance security of Rs. 2,50,000/-. 2. Not submitted Land Papers. 3. Not submitted Undertaking. 4. Not submitted report of Aravali from Deputy Commissioner Gurgaon. 5. Not submitted NOC from Forest Deptt.

No. 2546 dt. 03.01.2013

Refused

No. 1742 dt. 05.11.2012

SCN

No. 1577 dt. 05.10.2012

SCN

1. Not submitted the performance security. 2. Not submitted the permission from Forest Department. 3. Not submitted the permission from Town and Country Planning Department. 4. Not submitted the report of Aravali from DC, Gurgaon. 5. Not submitted the report of RO, Gurgaon regarding the applicability of Environmental Clearance. 1. Not submitted Permission from Forest Deptt. 2. Not submitted Site clearance. 3. Not submitted report of Aravali from Deputy Commissioner, Gurgaon. 4. Not submitted report of R.O. Gurgaon (North) regarding applicability of Environmental Clearance. 1. Clearance from Town & Country Planning Deptt. Haryana, Chandigarh not submitted. 2. Report of RO Gurgaon may be taken w.r.t. the applicability of Environmental Clearance under EIA notification dated 14.09.2006.

No. 1989 dt. 16.11.2012

SCN

No. 1711 dt. 05.11.2012

SCN

No. 2005 dt. 16.11.2012

SCN

Granted

No. 1810-15 dt. 08.11.2012

Granted

Das könnte Ihnen auch gefallen