ABSTRACT

Erection of 220KV DC line from Pulichintala Hydro Project to proposed 220/132KV SS Huzurnagar and 2 nos 220KV bays at Huzurnagar in Nalgonda district

Sl. No

Description

Total Cost Rs.

SCHEDULE-A1 SCHEDULE-A2 Total of A SCHEDULE-B1-Electrical SCHEDULE-B1-Civil SCHEDULE-B1(Elec+Civil) SCHEDULE-B2-Electrical SCHEDULE-B2-Civil SCHEDULE-B2(Elec+Civil) Total of B Eestimated Contract Value

147382529.98 11349885.70 158732415.68 12950224.18 22891837.65 35842061.83 3749534.63 2037603.47 5787138.10 41629199.93 200361615.61 2003.62

Signature of the Bidder

SCHEDULE-A1 Name of the work: Erection of 220KV DC line from Pulichintala Hydro Project(4X30MW) to Proposed 220KV Huzurnagar SS(35.5KM) Sl. No 1 2 3 4 5 Description G.I Tower parts including stubs,cleats and stub setting templates G.I Bolts & Nuts including Spring & Flat Washers Step Bolts Supply of Moose ACSR Conductor Supply of Single Suspension Hardware (AGS type) with FAH as per IS conforming to latest issue suitable for Moose conductor Supply of Single Tension Hardware as per IS conforming to latest issue suitable for Moose conductor. Supply of Repair sleeves conductor ie., accessories as per relevant IS of latest issue suitable for ACSR Moose conductor. Supply of Stock bridge Vibration dampers ie., conductor accessories as per relevant IS of latest issue suitable for ACSR Moose conductor. Mid Span Compression Joints for Moose Conductor Supply of 7/3.15mm HTGS Earth wire conforming to IS of latest issue. Supply of HTGS single Tension Hardware Supply of HTGS single suspension Hardware Mid Span Compression Joints for Earthwire 70KN Disc Insulators 120KN Disc Insulators Number Plates Phase Plates Danger Boards P type hangers Bird Gaurds Unit MT MT MT KM Sets Qty. 704 18.5 2.8 215 606 Unit Rate in Rs. 80291.00 79020.10 79020.10 335606.80 5719.09 Amount in Rs. 56524864.00 1461871.85 221256.28 72155462.00 3465768.54

Sets

630

4379.71

2759217.30

Sets

10

377.53

3775.30

Sets

1542

943.83

1455385.86

9 10 11 12 13 14 15 16 17 18 19 20

Sets KMs Nos Nos Sets Nos Nos Nos Nos Nos Nos Nos

20 35.855 105 101 22 7878 8823 126 116 16 100 100

1214.24 39267.72 1065.27 1065.27 162.74 297.30 585.75 171.00 353.40 171.00 813.96 228.00 Total

24284.80 1407944.10 111853.35 107592.27 3580.28 2342129.40 5168072.25 21546.00 40994.40 2736.00 81396.00 22800.00 147382529.98

Signature of the Bidder

Page 3 SCHEDULE A2 NAME OF WORK :-Erection of 2 Nos 220KV Bays at Huzurnagar 220KV SS
Sl. No 1 Description Supply of fabricated GI structures from raw steel such as M.S.Angles, Plates,channels R.S.Joists M.S rounds etc., including cost of steel, fabrication and galvanisation of main and auxiliary structures, booms, stubsetting template and foundation bolts 'U' bolts with suitable galvanised nuts for foundation bolts, transportation to substation site Supply of hot dip galvanised bolts and nuts of various lengths of 16mm dia, 5.6 grade as per IS 1367, required for all structures and booms fabricated including transportation to sustation site and conforming to Standards specified in the relevant Clauses of the specification and Supply of Electro galvanised spring washers of 16mm size with rectangular cross section 5 mmx 3.5 mm of type B (with flat ends) conforming to IS 3063 for use with 16mm dia.G.I.Bolts as per the relevant clause of the specification including transportation to the substation site. Unit MT Qty. 24 Unit Rate in Rs. 72455.00 Amount in Rs. 1738920.00

MT

79020.10

237060.31

3 4 5 6 7 8 9(a) (b) (c) (d) (e) 10 11 12

Supply of following Equipment/material 220KV SF6 Circuit Breakers 220KV Feeder CTs (800-600A /1-1-1-1-1A) 220KV Lightening Arrestors 220KV 800A Isolator without Earth switch 220KV 800A Isolator With Earth Switch ACSR Moose Conductor 2C x 2.5 Sq.mm Copper Control Cable 4C x 2.5 Sq.mm Copper Control Cable 6C x 2.5 Sq.mm Copper Control Cable 10C x 2.5 Sq.mm Copper Control Cable 12C x 2.5 Sq.mm Copper Control Cable 3 1/2X120 Sq.mm Power Cable Supply of 7/3.15mm HTGS Earth wire conforming to IS of latest issue. 220KV Solid Core Insulators

Nos. Nos. Nos. Nos. Nos. KM KM KM KM KM KM KM KM Nos.

2 6 6 4 2 0.448 1 1 1 1.5 1 0.2 0.30 54.00

2133209.08 329413.30 49359.60 129775.11 139111.72 335606.80 43421.68 78776.36 108036.86 190676.69 234570.18 322014.99 39267.72 19632.79 TOTAL

4266418.16 1976479.80 296157.60 519100.44 278223.44 150351.85 43421.68 78776.36 108036.86 286015.04 234570.18 64403.00 11780.32 1060170.66 11349885.70

Signature of the Bidder


\\vboxsrv\conversion_tmp\scratch_2\[186516528.xls.ms_office.xls]ABSTRACT

Schedule B1-Civil Name of work: Erection of 220 KV DC line from Pulichintala Hydro project to proposed 220/132/33 KVSS Huzurnagar in Nalgonda SL. Unit rate of Total of labour DESCRIPTION OF ITEM Qty Unit Unit rate of No labour in Rs. material in in Rs. . Rs. 0.00 2317560.00 1 Earthwork excavation in all types of soils (up to stone 14000.00 Cum 165.54 matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth and consolidation as per standerd specification and constructing of platforms around foundations utilizing the excavated earth etc. complete as directed by Engineer-in-Charge

2 Extra towrds dewatering charges over and above the 5030.00 excavation rate for excavated earth quantity Where water table met at 1.50 m or more below G.L 3 Extra towrds dewatering charges over and above the 4050.00 excavation rate for excavated earth quantity Where water table met between 0.75m and 1.50m below G.L 4 Extra towrds dewatering charges over and above the 2975.00 excavation rate for excavated earth quantity where water table is met with in 0.75m Below G.L 5 Excavation in Ordinary rock (HDR, soft rock ) (not 1800.00 requiring blastingThe rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge 6 Excavation in HDR, Soft rock, F&F requiring blasting 1200.00 where ever necessary.The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material with all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge 7 Hard rock (requiring blasting) The rate includes labour 1200.00 charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge 8 Sand filling below the foundations as per the standard 320.00 specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per directions of the Engineer-in-charge. 9 Laying of concrete (1:4:8) mix using 40mm HBG Machine 320.00 crushed metal conforming to IS 383 for all types of foundations including cost & conveyance of all materials, dewatering arrangements of the pits before and during the process of laying concrete, labour charges, water lead, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-incharge. (IS-456) 10 Providing High Yield Strength Deformed (HYSD)/ Thermo 15 Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

Cum

19.99

0.00

100549.70

Cum

71.04

0.00

287712.00

Cum

137.45

0.00

408913.75

Cum

265.85

0.00

478530.00

Cum

266.32

0.00

319584.00

Cum

631.99

258.13

758388.00

Cum

20.06

481.36

6419.20

Cum

988.69

2813.97

316380.80

MT

3460.52

54214.89

51907.80

SL. DESCRIPTION OF ITEM Qty No . 11 RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm 230.00 size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(cement 400 kg , sand 0.45 cum and metal 0.90 cum)

Unit

Unit rate of labour in Rs. 2966.45

Cum

Unit rate of material in Rs. 4268.79

Total of labour in Rs. 682283.50

12 PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm 2000.00 size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(cement 330 kg , sand 0.45 cum and metal 0.90 cum)

Cum

1946.19

3951.35

3892380.00

13 Filling around the foundations if required where ever 4200.00 necessary with borrowed earth as per the standard specifications of APDSS in uniform horizontal layers (0.15) including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per the directions of the Engineer-in-charge. 14 Providing shoring and strutting either with country 1400.00 wooden planks and scantlings or with steel sheets and props for excavation of pits for tower foundations wherever necessary including cost and conveyance of all materials, labour charges, tools & tackles, all leads & lifts and etc., complete for finished item of work as per directions of the Engineer-in-charge. Total

Cum

19.31

141.59

81102.00

Sqm

15.85

67.59

22190.00

9723900.75
Service tax 12.36% on total of labour Labour Cess @ 1% on total of Labour TOTAL with Taxes 1201874.13 97239.01 11023013.89

TOTAL LABOUR & MATERIAL 22891837.65 Signature of the Bidder

urnagar in Nalgonda Total of material in Rs. 0.00

0.00

0.00

0.00

0.00

0.00

309756.00

154035.20

900470.40

813223.35

Total of material in Rs. 981821.70

7902700.00

594678.00

94626.00

11751310.65
NA 117513.11 11868823.76

ignature of the Bidder

Schedule B1-Electrical Page 8 Name of the work: Erection of 220KV DC line from Pulichintala Hydro Project(4X30MW) to Proposed 220KV Huzurnagar SS(35.5KM) Sno Description QTY 35.50 Unit RKM Unit rate of Labour 4644.00 Unit Rate of material Total of Labour 164862.00 Total of Material

Check survey Setting of stubs with stub-setting template : Erection of stubs, stub template, fixing of jacks for supporting template, alignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., movement of template from one location to other location including transportation.(ABCDTowers)

126.00

Loc.

12214.57

1539035.82

Erection of all types of towers and extentions upto 12 mts. in full towers except JC type towers complete with all accessories such as Number plates, Phase plates, Danger boards etc. and including the step bolts after full tightening and checking tower verticality, and anti climbling devices are also to be fixed wherever necessary under normal conditions. (ABCD Towers)

693.57

MT

5977.09

4145530.31

Earthing of towers including cost of excavation, back filling, including cost of 25 mm dia 2.5 mm thick class 'C' G.I. pipe of 3 Mtrs length with 50 X6 mm G.I flat 4.05 mtrs long , Charcoal, Salt etc., and measuring tower footing resistance

126.00

Loc.

4860.74

612453.24

Counterpoise earthing including clamping devices and terminal lugs, but excluding cost of steel wire. Hoisting of tension insulators and suspension insulators with hardware, paving out the conductor,rough sagging, jointing, tensioning, clamping,jumpering, clipping and fixing of Preformed Armour rods and vibration dampers etc. complete with 6(six) nos. ACSR Moose conductor and measuring ground clearences wherever necessary(Under nomal Conditions)

120.00

RM

42.19

5062.80

35.50

RKM

100612.07

3571728.58

Fixing hardware, paving out earth wire, jointing, tensioning, stringing, jumpering and clamping of 7/3.15mm HTG Steelwire .(Under nomal Conditions) Half round welding of G.I.bolts and nuts of towers in the section between ground level & upto bottom X-arm level including all bolts connecting the bracings at the bottom X-arm level and painting the welded portion with one coat of zinc rich paint

35.50

RKM

7684.68

272806.22

55989.00

Nos.

19.87

1112501.43

TOTAL Service tax 12.36% on total of labour Labour Cess @ 1% on total of Labour TOTAL with Taxes

11423980.40 1412003.98 NA 114239.8 12950224.18 0.00

0.00 0

TOTAL LABOUR & MATERIAL

12950224.18

Signature of the Bidder

Sno Description

QTY

Unit

Pageof 9 Unit rate Labour

Unit Rate of material

Total of Labour

Total of Material

Schedule B2-Civil Name of work: Erection of 2 No. 220 KV bays at 220 KVSS Huzurnagar for Pulichinthala I & II feeders in Nalgonda District. Sl. DESCRIPTION OF ITEM OF WORK Qty Unit Unit Unit rate Total of labour in No rate of of Rs. labour 61.74 material 106986.00 1 Levelling by filling with borrowed gravel by mechanical 600.00 Cum 178.31 means including pre-watering of soil, excavation of soils,conveyance of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per (Payment will be made based on level for finished item of work).

Earthwork excavation in all types of soils (up to stone 550.00 matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work. . Excavation in ordinary rock( HDR,soft rock,F&F) 50.00 requiring blasting where ever necessary.The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineerin-charge Hard rock (requiring blasting) The rate includes labour 50.00 charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge Providing sand cushion for foundations and basement in 100.00 uniform layers, including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of work( APSS No. 309&310) Laying of Cement Concrete (1:4:8) mix using 40mm size 25.00 HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

Cum

124.49

0.00

68469.50

Cum

263.28

0.00

13164.00

Cum

590.51

255.76

29525.50

Cum

17.68

467.97

1768.00

Cum

883.10

2396.59

22077.50

Brick Masonry in CM (1:6) with 2nd class Bricks 5.00 traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . Providing High Yield Strength Deformed (HYSD)/ Thermo 2 Mechanically Treated (TMT) (Fe 415/ Fe 500 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

Cum

973.86

2676.98

4869.30

MT

7934.4

52228.92

15868.80

Sl. DESCRIPTION OF ITEM OF WORK Qty No 9 RCC M- 20 Nominal mix (Cement 400 kgs ) using 80.00 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge.

Unit Cum

Unit Unit rate Total of labour in rate of of Rs. labour 3902.64 material 216674.40 2708.43

10 PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm 50.00 size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(cement 330 kg , sand 0.45 cum and metal 0.90 cum)

Cum

1782.46 3618.93

89123.00

11 Plastering with CM (1:3), 12 mm thick and finishing 110.00 smooth to the required slope and painting two coats of Janatha Cem including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of Janatha Cem paint two coats, complete as per the directions of the Engineer in charge for the finished item of work. 12 Construction of cable duct in the switch yard as per 50.00 drawing no.CE/Civil/Trench/Swy 08 including cost & conveyance of all materials, labour charges, leads, lifts and curing etc, complete as per the directions of the Engineer in charge for the finished item of work 13 Supply and spreading of crusher dust in the switch 60.00 yard(100mm thick) area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..

Sqm

88.75

46.97

9762.50

RM

826.26

1149.90

41313.00

Cum

69.54

703.10

4172.40

14 Supply and laying of 180 GSM LDPE sheet of approved 600.00 make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work..

Sqm

0.00

16.01

0.00

15 Supply and Spreading of 20mm size Hard Broken 60.00 Granite metal in switch yard (100mm thick) including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work 16 Filling around the foundations if required where ever 100.00 necessary with borrowed Gravel as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc, complete for finished item of work as per the directions of the Engineer-in-charge. RETAINING WALL 17 Earthwork excavation in all types of soils (up to stone 35.00 matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work. .

Cum

62.22

1701.21

3733.20

Cum

12.72

241.68

1272.00

Cum

124.49

0.00

4357.15

Sl. DESCRIPTION OF ITEM OF WORK Qty No 18 Hard rock (requiring blasting) The rate includes labour 25.00 charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge 19 Excavation in ordinary rock( HDR,soft rock,F&F) 0.00 requiring blasting where ever necessary.The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineerin-charge 20 Providing sand cushion for foundations and basement in 15.00 uniform layers, including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of work( APSS No. 309&310) 21 Laying of Cement Concrete (1:4:8) mix using 40mm size 8.00 HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

Unit Cum

Unit Unit rate Total of labour in rate of of Rs. labour 255.76 material 14762.75 590.51

Cum

263.28

0.00

0.00

Cum

17.68

467.97

265.20

Cum

883.10

2396.59

7064.80

22

Construction of RR Msaonry in CM (1:6) using hard CR 66.00 Stone , rough granite stone and bond stones (0.16 cum) including cost and conveyance of all matreials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

Cum

1210.55 1466.82

79896.30

23 Providing and fixing 110mm dia (4kg/cm2) PVC pipes of 25.00 prince / sudhakar or any ISI brand make for weep holes in RR masonry walls including cost and conveyance of all materials complete as per the directions of the Engineer in charge for the finished item of work. 24 Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 2.00 20mm HBG metal with necessary form work including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) 25 Flush Pointing with CM (1:3) to RR Masonry including 91.00 cost and conveyance of all materials, all leads and lifts complete as per the directions of the Engineer in charge for the finished item of work. 26 White washing two coats with whiting / Suryacem of 130.00 approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

RM

16.42

167.20

410.50

Cum

1469.59 3026.27

2939.18

Sqm

44.97

10.12

4092.27

Sqm

19.97

3.74

2596.10

Sl. No

DESCRIPTION OF ITEM OF WORK

Qty

Unit

WATER SUPPLY ARRANGEMENT IN EARTH PITS 27 Supplying and fixing G.I. pipes Medium Grade as per IS 1239 of Tata/Zenith make for water supply line to toilets including cost and conveyance of pipe, G.I. specials such as elbows, Tees concealing same in walls and floors by cutting 25/ 20/ 15mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

Unit rate of labour

Unit rate of material

Total of labour in Rs.

a 25mm dia Nominal Bore 50.00 b 15mm dia Nominal Bore 70.00 28 Providing and fixing in position at all levels of the buildings G.M. Gate(GM peet) Valve (Tata/Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including jointing complete as per the directions of the Engineer in charge for the finished item of work. a 20mm dia Nominal Bore 4.00 29 Supply and fixing of 12.5mm/15mm dia N.P bib tap 7.00 indian make 300 grams weight Seiko or equivalent make including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work . 30 Construction of Brick masonry chamber over the cully 4.00 trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges complete for finished item of work as per the directions of the Engineer-in-charge

RM RM

45.14 45.14

213.18 134.52

2257.00 3159.80

No No

49.25 31.46

430.92 223.44

197.00 220.22

No

112.18

346.56

448.72

Service tax 12.36% on total of labour Labour Cess @ 1% on total of Labour TOTAL with Taxes TOTAL LABOUR & MATERIAL

751446.09 92878.74 7514.46 851839.29 2037603.47

Signature of the Bidder

s in Nalgonda District. Total of material in Rs. 37044.00

0.00

0.00

12788.00

46797.00

59914.75

13384.90

104457.84

Total of material in Rs. 312211.20

180946.50

5166.70

57495.00

42186.00

9606.00

102072.60

24168.00

0.00

Total of material in Rs. 6394.00

0.00

7019.55

19172.72

96810.12

4180.00

6052.54

920.92

486.20

Total of material in Rs.

10659.00 9416.40

1723.68 1564.08

1386.24

1174023.94 NA 11740.24 1185764.18

Signature of the Bidder

Schedule -B2 Page 18 Electrical NAME OF WORK :Erection of 2 Nos 220KV Bays atHuzurnagar 220KV SS Sno Description Setting of stubs with stub setting templates for SS structures Erection of stubs, stub setting template, fixing of jacks for supporting template, alignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of C.C., movement of template from one location to other location. 220KV TA Towers 220KV isolators CPL Erection of all types of structures fabricated from RS joists, M.S.Angles, channels, plates,rods etc.(Super structures and Bolts & Nuts) Fixing hardware, stretching the groundwire and stringing of overhead earth bus from pinacle to pinacle including supply of tension clamps 3 Bolted single tension clamps Connecting equipment to bus and/or another equipment with Single Moose conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary Twin moose spacer T clamps 400mm with T-off single Moose T Clamps for single Moose Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with - 100 x 16mm MS Flat Supply and Laying of earth mat including excavation of trenches, welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with 100 x 16mm GI Flat Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with - 50 x 8mm MS Flat Supply and Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with 50 x 8mm GI Flat Excavation of earth pit, putting cast iron pipe with flange on one end ( as per relevant ISS ), of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 1mtr dia and 0.6 mtrs long inside the pit, and backfill the pit in 25mm size granules of BH coke for full depth of the pit with alternate layers of BH Coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke , salt, C.I.Pipe and RCC collars, labour charges for all operational and incidental items of work etc., as directed by the engineer in charge. All earth pits should be connected to the earth mat. 4 6 18 25.5 MT 3747.98 2811.32 672.68 2903.78 14991.92 16867.92 12108.24 74046.39 QTY Unit Unit rate Unit Rate of Total of Labour of Labour material in in Rs. in Rs. Rs.

a b c 2

3 a

20 each 40 Nos

867.65 798.44

17353.00 0.00

44 each

304.18

13383.92

i ii 5

6 18

nos nos

702.30 467.81

0.00 0.00

1000

RM

89.78

635.49

89780.00

1000

RM

89.78

863.44

89780.00

1500

RM

70.75

156.35

106125.00

1500

RM

70.75

212.43

106125.00

10 Nos.

12943.06

129430.60

10

Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 core,2.5 sqmm both copper and aluminium) in cable trenches including cost of suitable metallic glands with rubber lining & dressing. This includes running of cables in control room where cables are run on cable racks in cable duct. Laying of Power Cables above 50Sqmm. Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted for termination of one core of cable at both ends. a) 2.5 sq.mm. copper Supply, installation, testing and commissioning of 80W LED lamps along with fixtures for switch yard lighting.

5500

RM

9.92

54560.00

11

200

18.36

3672.00

12

0.00

a 13

1000 Nos. 6 each

30.82 1161.78 53865.00

30820.00 6970.68

Page 19 Sno Description Supply and erection of lighting pillar box in switchyard on foundation as per drg.no.SET(P) 1/99 cost of all materials & cost of pillar box. Erection of the following equipment at site including insurance etc., and made fit for commissioning 220KV SF6 Circuit Breakers 220KV Feeder CTs (800-600A /1-1-1-1-1A) 220KV CVT 220KV Lightening Arrestors 220KV 800A Isolator without Earth switch with SCI 220KV 800A Isolator With Earth Switch with SCI Erection of control /relaypanels in the control room duly mounting them on channels provided on the cable duct and grouting them with foundation bolts. Supply and erection of 220KV CT marshalling box on the structures of equipment including cost of marshalling boxes Supply and erection of 220KV CVT marshalling box on the structures of equipment including cost of marshalling boxes Writing of names in the control room for identification of rooms, on panels, equipment, marshalling boxes, with CT ratio etc., & on maingates neatly with superior quality paint brushes & labour etc., complete on the main gate with superior quality synthetic enamel paint with two coats including cost of paint, brushes and labour charges etc complete. Supply and fixing of Insulation of Rubber mats of size 2m x 1m x 6mm confirming to IS 5424/96 and laying in front of panels in the Control Room Supply and fixing of 15 lbs CO2 portable fire extinguishers of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. Supply and fixing of 50 lbs CO2 portable fire extinguishers (with Trolley) of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. QTY Unit

Unit rate Unit Rate of Total of Labour of Labour material in in Rs. in Rs. Rs. 1161.24 12000.00 1161.24 0.00

14 15 a b c e f g 16

1 Nos.

2 6 6 6 4 2

Nos. Nos. Nos. Nos. Nos. Nos.

30987.15 6584.97 5878.22 3440.02 8792.47 9418.03 7334.23

61974.29 39509.80 35269.32 20640.11 35169.88 18836.07 14668.47

2 Nos.

17

2 Nos.

421.56

4511.62

843.12

18

2 Nos.

421.56

5730.97

843.12

19

100 Lines

67.00

6700.00

20

2 Nos.

0.00

1277.98

0.00

21

3 Nos.

0.00

5100.00

0.00

22 23 24 25 26 27 28 29 30 31 32

3 Nos.

0.00 0.00 0.00 0.00 5474.28 4146.18 914.28 2261.76 0.00 5734.20 2527.38 13953.60

13900.00 146.56 2500.00

0.00 0.00 0.00 0.00 10948.56 16584.72 1828.56 2261.76 0.00 5734.20 2527.38 13953.60 1055468.87 130455.95 10554.69 1196479.51 3749534.63

Supply & Fixing of GI Flexible earth Bonds 40 Nos. Supply and fixing of Portable Emergency twin tube fittings of 4 Nos. 20Watts capacity make Bajaj/Panasonic Labour - Telecom at 220KV Huzurnagar SS and Pulichintala Hydro Project Digital PLCC 2 Nos 1250A/0.5 mH Wavetraps along with mounting Pedastal and 4 Nos insulator stack. Phase to Phase coupling units 2 Nos EPAX (8/8), 128 universal ports fullly wired. 1 Nos EPB Telephones 10 Nos 48V/250AH SMF VRLA Battery set 1 Nos 48V/50A(1+1) Float cum Boost Charger 1 Nos 125 Ohms Co-axial Cable 1 Km

TOTAL Service tax 12.36% on total of labour Labour Cess @ 1% on total of Labour TOTAL with Taxes TOTAL LABOUR & MATERIAL

Signature of the Bidder

Page 20 2 Nos 220KV Bays atHuzurnagar 220KV SS Total of Material in Rs.

0.00 0.00 0.00 0.00

0.00 31937.60

0.00

4213.80 8420.58

635494.86

863440.00

234527.87

318649.16

0.00

0.00

0.00

0.00

0.00 323190.00

Page 21 Total of Material in Rs. 12000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9023.24

11461.94

0.00

2555.96

15300.00

41700.00 5862.34 10000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2527777.35 NA 25277.77 2553055.12

Signature of the Bidder

PRICE BID-SCHEDULE-C (These Price Schedules shall be filled up by the Bidder ) SPECIFICATION NO : e- 54/CE/Construction-I/ APT-e-54 /2013 NAMES OF THE WORKS : Schedule A1&B1:Supply, Erection,Testing and Commissioning of 220KV DC line from Pulichintala Hydro Project to proposed 220/132KV SS Huzurnagar Schedule A2&B2:Supply, Erection,Testing and Commissioning of Erection of 2 nos 220KV bays at Huzurnagar in Nalgonda district A (Material Portion)=A1+A2 Sl. No. 1 Item Total Value of Schedule A+B Rs. B(Labour Portion)= B1+B2 Amount 200361616.00

Percentage Rate quoted below / at par / above the total value vide SCHEDULE A + B i. In Figures% ii. In Words Grand Total value of SCHEDULE A+B after loading the percentage rate quoted against Sl No. 2 above

Unconditional Rebate if any on amount against SL.NO.3 above i. In Figures% ii. In Words

5 Amount of discount after loading the percentage rate quoted against Sl No.4 above 6 Total value of contract after allowing the discount offered(Sl.No.3-Sl No 5) Very Important Note to Bidders for evaluation purpose 1. In case of discrepancy between the amount calculated by adopting the percentage rate quoted for Sl. No. 2 and amount quoted in Sl. No. 3 the percentage rate quoted in words in Sl. No. 2, shall govern. 2.DIFFERENCE IN e-Procurement LUMPSUM AMOUNT AND TOTAL OF THE SCHEDULES: 1. Where there is a discrepancy between the total lumpsum rate quoted in the e-procurement platform web page and the total of schedule submitted, the total lumpsum rate quoted in the e-procurement platform will govern for deciding L1 2.After evaluating the schedules of L1 by taking into consideration the words and figures and multiplication and totaling mistakes(i) If the amount arrived is less than tha e-procurement lumpum amount, the lesser amount shall be taken forward of contract. (i) If the amount arrived is more than tha e-procurement lumpum amount, the lumpsum amount shall be taken forward of contract. 3.. The Quantities of Equipment/material indicated in Schedule-A1 and Schedule-A2 and the Quantities indicated in Schedule-B1 and Schedule-B2 are tentative only. They are likely to vary slightly during execution. The Quantities of Equipment will be finalized and confirmed immediately after placing purchase order. 4. Discount offered if any shall be indicated in the schedule 'C' only. Discount offered any where else will not be considered.

Signature of the Bidder with seal