Beruflich Dokumente
Kultur Dokumente
Project Title:
Project No.
Checked By:
Date:
Date:
Nov/08/13
hc
42 in.
42 in.
Pipe Size =
O.D. =
8 in.
Conc. Thick. hc =
wd = Cd w Bd^2 =
where:
Bd
H
Bc
Cd = 1 - e^ (-2 ku'(H/Bd))
2 ku'
=
0.439
2.33 ft.
0.13 lb / in^3
H=
ku' =
Table 13 to 28
5
1.42
1.75
2.5
3
3.42
4.25
4.83
5.42
5.92
6.5
7.08
7.67
6
1.5
1.83
2.58
3.08
3.5
4.33
5.17
5.75
6.33
6.92
7.42
8
7
1.58
1.92
2.75
3.17
3.58
4.5
5.33
6.17
6.67
7.25
7.83
8.42
8
1.67
2
2.83
3.25
3.75
4.58
5.42
6.25
7.08
7.67
8.17
8.75
9
1.75
2
2.92
3.33
3.83
4.67
5.58
6.42
7.25
8.08
8.58
9.08
10
1.75
2.08
3
3.42
3.92
4.83
5.67
6.58
7.42
8.17
9
9.5
15
2.08
2.42
3.33
3.83
4.33
5.25
6.17
7.08
7.92
8.83
9.67
10.5
20
2.33
2.75
3.67
4.25
4.75
5.67
6.67
7.58
8.42
9.33
10.25
11.08
+ wt. of concrete =
(1 of 3)
N:\civil\spreadsh\UGPipes\u-g pipe.xls
X
P4
P1
Sum loads
at this point
Wheel Loading
X
P4
P1
Wheel
#
1
2
3
4
5
6
P
( lbs. )
17500
17500
17500
17500
X
( ft. )
0.00
7.00
21.20
20.00
0.00
0.00
A contact
( ft. ^2 )
1.92
1.92
1.92
1.92
0.00
0.00
L
( ft. )
2.45
2.45
2.45
2.45
2.45
2.45
X
Ref. 2 , 4.7.2.2.2
Sum loads
at this point
P3
H/L
X/L
P2
Lr
Ref. 4
80 psi.
1.267 1.5 at surface
1.0 @ H = 5 ft.
200 lb / in^3
k mod. of subgrade reaction =
3400000 psi
Ec conc. =
Tire Pressure =
Impact Factor = Fi =
Press. Coef.
Pressure
Top Pipe (lb./ft^2)
Ref 4
1204.2
Table 1
189.7
0.0
0.0
0.0
0.0
Total: = 1393.9
( C from below)
0.95
0.95
0.95
0.95
0.95
0.95
0.00
2.86
8.67
8.18
0.00
0.00
1.6
0.048
0.047
0.045
0.043
0.039
0.035
0.030
0.027
0.024
0.021
0.019
0.017
0.015
0.013
0.011
0.010
2.0
0.032
0.033
0.033
0.032
0.030
0.028
0.026
0.023
0.021
0.019
0.018
0.015
0.013
0.012
0.010
0.009
0.0825
0.013
0
0
Pressure Coeficient C
C
H/L
0.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
4.4
4.8
5.2
5.6
6.0
0.0
0.113
0.101
0.089
0.076
0.062
0.051
0.043
0.037
0.032
0.027
0.024
0.020
0.018
0.015
0.014
0.012
0.4
0.105
0.095
0.084
0.072
0.059
0.049
0.041
0.036
0.030
0.026
0.023
0.020
0.017
0.015
0.013
0.012
0.8
0.089
0.082
0.074
0.065
0.054
0.046
0.039
0.033
0.029
0.025
0.022
0.019
0.017
0.014
0.013
0.011
X/L
1.2
0.068
0.065
0.061
0.054
0.047
0.042
0.036
0.031
0.026
0.023
0.020
0.018
0.016
0.014
0.012
0.011
2.4
0.020
0.021
0.022
0.022
0.022
0.022
0.021
0.019
0.018
0.016
0.015
0.014
0.012
0.011
0.010
0.009
2.8
0.011
0.011
0.012
0.014
0.016
0.016
0.016
0.015
0.014
0.014
0.013
0.012
0.011
0.010
0.009
0.008
3.2
0.006
0.004
0.005
0.008
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.010
0.009
0.008
0.008
0.007
3.6
0.002
0.001
0.002
0.005
0.007
0.008
0.008
0.009
0.009
0.009
0.009
0.009
0.008
0.007
0.007
0.007
4
0.000
0.000
0.001
0.003
0.005
0.006
0.006
0.006
0.007
0.007
0.007
0.007
0.007
0.006
0.006
0.006
1393.9 lb / ft.^2
Pipe Stresses
Pipe Dia. O.D. =
42
0.50
Wall thickness t =
X65
Pipe Grade =
SMYS = 65000
Pipe Operating Pres. = 1000.0
0.8
SMYS design factor F =
in.
in.
psi.
psi.
10
170
deg. F
deg. F
2756.3 psi.
978.6 psi.
2756.3 psi.
2756.9 psi.
where:
(2 of 3)
where:
Cyclic Circumferential Stress
SHh = KHh GHh R L Fi w
=
86.10 psi.
Fig. 14
3-4
1.45
1.28
1.08
1.12
1.07
1.01
0.96
0.92
0.87
0.85
R = pavement factor =
L = Axle configuration =
0.96
Set Er = 10
from Fig. 15
Fig. 15
10
0.7
0.67
0.63
0.58
0.54
0.5
0.46
0.43
0.41
0.38
Ref. 2
0.90
0.65
==>
Table 2
SHi (Barlow) =
<=
<=
0.8
1.0
1.0
42000 psi
52000 (nat. gas)
52000 (liquids)
Ref. 3
Ref. 2
OK
OK
Fig. 16
10
where t / d = 0.011905
GLh
Pipe dia.
6
10
12
18
24
30
36
42
48
54
60
3-4
1.55
1.23
1.15
1.1
1.02
0.94
0.86
0.78
0.7
0.62
0.54
0.78
Set Er = 10
from Fig. 17
H, soil cover
6
1.45
1.1
1.02
0.93
0.87
0.8
0.73
0.65
0.58
0.51
0.44
( ft. )
8
1.35
1
0.88
0.83
0.75
0.69
0.63
0.58
0.52
0.46
0.41
Fig. 17
10
1.25
0.9
0.8
0.7
0.57
0.53
0.48
0.44
0.4
0.36
0.32
32130 psi
< or =
52000 psi
44533 psi
References:
1. )
2. )
API Recommended Practice 1102 Steel Pipelines Crossing Railroads and Highways 6th Editition 1993
3. )
4. )
PCA Vertical Pressure on Culverts Under W heel Loads on Concrete Pavement Slabs
5. )
(3 of 3)
Design Calculation
Project Title:
Project No.
014173
Date:
Checked By:
Date:
Nov/08/13
Earth Loading
42 in.
42 in.
Pipe Size =
O.D. =
Bd
Ref. 1
1666.6 lb / lin ft.
120 lb/ft^3 soil unit wt.
w=
5 ft. (actual width)
Bd =
Bd =
5.0 ft. (effective width)
Bc = O.D. =
3.50 ft
wd = Cd w Bd^2 =
where:
Bc
Cd = 1 - e^ (-2 ku'(H/Bd))
2 ku'
=
0.556
H=
ku' =
3 ft.
0.13 lb / in^3
ku' = modulus of subgrade reaction
Saturated clay = 0.110
Ordinary clay = 0.130
Saturated topsoil = 0.150
Sand and gravel = 0.165
Ref. 1
Table 13 to 28
5
1.42
1.75
2.5
3
3.42
4.25
4.83
5.42
5.92
6.5
7.08
7.67
6
1.5
1.83
2.58
3.08
3.5
4.33
5.17
5.75
6.33
6.92
7.42
8
7
1.58
1.92
2.75
3.17
3.58
4.5
5.33
6.17
6.67
7.25
7.83
8.42
8
1.67
2
2.83
3.25
3.75
4.58
5.42
6.25
7.08
7.67
8.17
8.75
9
1.75
2
2.92
3.33
3.83
4.67
5.58
6.42
7.25
8.08
8.58
9.08
10
1.75
2.08
3
3.42
3.92
4.83
5.67
6.58
7.42
8.17
9
9.5
15
2.08
2.42
3.33
3.83
4.33
5.25
6.17
7.08
7.92
8.83
9.67
10.5
20
2.33
2.75
3.67
4.25
4.75
5.67
6.67
7.58
8.42
9.33
10.25
11.08
(1 of 3)
N:\civil\spreadsh\UGPipes\u-g pipe.xls
Wheel Loading
P4
P1
Sum loads
at this point
X
P4
80 psi.
1.2
1.5 at surface
1.0 @ H = 5 ft.
Ref. 2 , 4.7.2.2.2
P
( lbs. )
17500
17500
17500
17500
X
( ft. )
0.00
7.00
21.20
20.00
0.00
0.00
A contact
( ft. ^2 )
1.82
1.82
1.82
1.82
0.00
0.00
r
( ft. )
0.76
0.76
0.76
0.76
0.00
0.00
H/r
P2
P3
Ref. 4
Wheel
#
1
2
3
4
5
6
Sum loads
at this point
Tire Pressure =
Impact Factor = Fi =
P1
X/r
Press. Coef.
Pressure
Top Pipe (lb./ft^2)
1202.7
27.6
13.8
13.8
0.0
0.0
Total: = 1258.0
( C from below)
3.94
3.94
3.94
3.94
#DIV/0!
#DIV/0!
0.087
0.002
0.001
0.001
0.00
9.19
27.83
26.26
#DIV/0!
#DIV/0!
Pressure Coeficient C
C
H/r
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.0
1.000
0.911
0.646
0.424
0.284
0.200
0.146
0.110
0.087
0.057
0.040
0.030
0.023
0.018
0.015
1.0
1.000
0.425
0.350
0.250
0.198
0.145
0.110
0.101
0.081
0.054
0.039
0.029
0.023
0.018
0.015
2.0
0.000
0.010
0.500
0.075
0.075
0.070
0.066
0.060
0.054
0.041
0.032
0.025
0.020
0.016
0.014
X/r
3.0
0.000
0.001
0.005
0.012
0.020
0.026
0.029
0.031
0.031
0.028
0.024
0.020
0.017
0.014
0.012
4.0
0.000
0.000
0.001
0.004
0.007
0.010
0.013
0.015
0.017
0.017
0.017
0.015
0.013
0.012
0.010
5.0
0.000
0.000
0.000
0.001
0.003
0.004
0.006
0.008
0.009
0.011
0.010
0.011
0.010
0.009
0.009
6.0
0.000
0.000
0.000
0.000
0.001
0.002
0.003
0.004
0.005
0.006
0.007
0.008
0.008
0.007
0.007
7.0
0.000
0.000
0.000
0.000
0.001
0.001
0.002
0.002
0.003
0.004
0.005
0.005
0.006
0.006
0.006
1258.0 lb / ft.^2
Pipe Stresses
Pipe Dia. O.D. =
Wall thickness t =
Pipe Grade =
SMYS =
Pipe Operating Pres. =
SMYS design factor F =
42
0.50
X65
65000
1000.0
0.8
in.
in.
psi.
psi.
10
170
deg. F
deg. F
3675.0 psi.
1260.0 psi.
3675.0 psi.
where:
12.5
0.0119
Fig. 14
Set Er = 10
3-4
1.45
1.28
1.08
1.12
1.07
1.01
0.96
0.92
0.87
0.85
R = pavement factor =
L = Axle configuration =
0.96
from Fig. 15
H, soil cover
6
1.15
1.05
0.95
0.85
0.8
0.76
0.72
0.69
0.66
0.63
Fig. 15
( ft. )
8
0.9
0.85
0.77
0.73
0.68
0.64
0.6
0.55
0.51
0.47
10
0.7
0.67
0.63
0.58
0.54
0.5
0.46
0.43
0.41
0.38
Ref. 2
Table 2
1.10
0.65
==>
SHi (Barlow) =
<=
<=
0.8
1.0
1.0
42000 psi
52000 (nat. gas)
52000 (liquids)
Ref. 3
Ref. 2
OK
OK
GLh
Pipe dia.
6
10
12
18
24
30
36
42
48
54
60
3-4
1.55
1.23
1.15
1.1
1.02
0.94
0.86
0.78
0.7
0.62
0.54
0.78
Fig. 16
10
H, soil cover
6
1.45
1.1
1.02
0.93
0.87
0.8
0.73
0.65
0.58
0.51
0.44
( ft. )
8
1.35
1
0.88
0.83
0.75
0.69
0.63
0.58
0.52
0.46
0.41
Fig. 17
10
1.25
0.9
0.8
0.7
0.57
0.53
0.48
0.44
0.4
0.36
0.32
32555 psi
< or =
52000 psi
44811 psi
References:
1. )
2. )
3. )
4. )