Slab Type=
Dimensions: Beam :
28 MPa 415 MPa 270 MPa 1 (Ribed=1 , Solid=0) h= 27 cm Avg. Beam Width = Hordis Width = Supported Width = Ln = 2.55 m Tiling Th = 0 cm 2 KN/m2
cc=
30 mm 8 mm 12 mm
Str = Bar =
14 cm 40 cm 54 cm Flange Th =
7 cm
Loads:
SLL =
0.765 0 KN/m2
Wu = Step 2: Check a
0.003373 0.003188
2 106.7373 mm
12 mm
2 113.04 mm 2
0.944244
Ast =
113.04 mm
7- Check a
a=
3.65014
It Can Be Designed As Rectangular Section Step 3: Design For Shear 1- Vu = 10.06 KN Vu = 0.5*Wu*Ln If Regular Beam Vu = Wu*Ln If Cantiliever
23.4811 KN 11.74055 KN mm 6 mm
2 28.26 mm 2
Use
Step 4: Temperature & Shrinkage Steel In direction Perpendicular to the ribs Flange Thickness = 70 mm Ast =
2 126 mm
Adequate
Since this 1 10 is already provided on top of every rib this means that a 10 is sufficient but then the spacing between each two 10 will > 30 cm, so we must provide a 6 bar on top of each Hordis block
28 MPa 415 MPa 270 MPa 1 (Ribed=1 , Solid=0) h= 27 cm Avg. Beam Width = Hordis Width = Supported Width = Ln = 2.55 m Tiling Th = 0 cm 2 KN/m2
cc=
30 mm 8 mm 12 mm
Str = Bar =
14 cm 40 cm 54 cm Flange Th =
7 cm
Loads:
SLL =
0.765 0 KN/m2
Wu = Step 2: Check a
0.003373 0.003188
2 106.7373 mm
12 mm
2 113.04 mm 2
0.944244
Ast =
113.04 mm
7- Check a
a=
3.65014
It Can Be Designed As Rectangular Section Step 3: Design For Shear 1- Vu = 10.06 KN Vu = 0.5*Wu*Ln If Regular Beam Vu = Wu*Ln If Cantiliever
23.4811 KN 11.74055 KN mm 6 mm
2 28.26 mm 2
Use
Step 4: Temperature & Shrinkage Steel In direction Perpendicular to the ribs Flange Thickness = 70 mm Ast =
2 126 mm
Adequate
Since this 1 10 is already provided on top of every rib this means that a 10 is sufficient but then the spacing between each two 10 will > 30 cm, so we must provide a 6 bar on top of each Hordis block
28 MPa 415 MPa 270 MPa 1 (Ribed=1 , Solid=0) h= 27 cm Avg. Beam Width = Hordis Width = Supported Width = Ln = 2.55 m Tiling Th = 0 cm 2 KN/m2
cc=
30 mm 8 mm 12 mm
Str = Bar =
14 cm 40 cm 54 cm Flange Th =
7 cm
Loads:
SLL =
0.765 0 KN/m2
Wu = Step 2: Check a
0.003373 0.003188
2 106.7373 mm
12 mm
2 113.04 mm 2
0.944244
Ast =
113.04 mm
7- Check a
a=
3.65014
It Can Be Designed As Rectangular Section Step 3: Design For Shear 1- Vu = 10.06 KN Vu = 0.5*Wu*Ln If Regular Beam Vu = Wu*Ln If Cantiliever
23.4811 KN 11.74055 KN mm 6 mm
2 28.26 mm 2
Use
Step 4: Temperature & Shrinkage Steel In direction Perpendicular to the ribs Flange Thickness = 70 mm Ast =
2 126 mm
Adequate
Since this 1 10 is already provided on top of every rib this means that a 10 is sufficient but then the spacing between each two 10 will > 30 cm, so we must provide a 6 bar on top of each Hordis block