Ground floor
Description
Rooms (28N0s)
1
Painting area internal
Rate
Amount
1323.84
600
794304
m2
m2
m2
m2
469.60
469.60
469.60
532.00
5500
1500
600
600
2582811
704403
281761.2
319200
Nos
m2
m2
m2
84.00
55.44
20.16
91.00
9000
5000
2000
4500
756000
277200
40320
409500
Removing fan
m2
Nos
301.56
16.00
700
500
211092
8000
Nos
16.00
80000
1280000
Nos
28.00
75000
2100000
Painting
Plastering
Ceiling repair (205,206,207)
Painting
Floor tile(remove and replace)
wall tile(remove and replace)
pedestal wash basing remove and replace
WC remove and replace
Shower
shop tray
Towel rail
Paper holder
Mirror (1800x1200)
Bide shower
m2
m2
m2
m2
m2
m2
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
554.40
112.00
133.77
131.04
133.77
369.60
28.00
28.00
28.00
28.00
28.00
28.00
28.00
28.00
700
600
1500
700
4500
4500
40000
40000
4000
700
700
600
15000
1000
388080
67200
200655
91728
601965
1663200
1120000
1120000
112000
19600
19600
16800
420000
28000
Plastering
Painting wether sheild
Painting sofit
Brick work (4 1/2")
Plastering
Painting wether sheild
Tiling remove and replace
Sub Total
m2
m2
m2
m2
m2
m2
m2
252.00
504.00
189.00
71.28
221.76
221.76
190.40
600
760
500
2300
600
760
4500
151200
383040
94500
163944
133056
168537.6
856800
17584496.8
m2
Nos
94.09
1.00
6000
50000
564540
50000
m2
m2
m2
m2
m2
m2
Nos
m2
24.17
2.70
86.57
86.57
2.00
1.00
1.00
38.71
10000
1500
3000
10000
6000
50000
50000
4000
241650
4046.25
259695
865650
12000
50000
50000
154830
m2
239.36
700
167552
5
6
7
8
9
10
11
12
13
Bath Room
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Qty
m2
2
Unit
Balcony
1
2
3
4
5
6
7
Front
1
2
3
4
5
6
7
8
9
10
11
Dining Area
floor tiling
1
2
3
m2
125.00
4500
562477.5
m2
329.57
700
230699
m2
22.69
4500
102093.75
m2
124.20
600
74520
m2
m2
m2
m2
Nos
37.00
12.60
25.20
35.28
1.00
600
3000
600
760
50000
22200
37800
15120
26812.8
50000
Plastering slab
m2
m2
15.28
9.00
4500
600
68737.5
5400
Duct door
Nos
3.00
5000
15000
m2
m2
40.80
40.80
3000
700
122400
28560
m2
146.40
600
87840
m2
327.00
760
248520
m2
m2
64.00
15.00
600
3500
38400
52500
m2
78.00
1000
Nos
Nos
4.00
9.00
1000
5000
78000
0
4000
45000
Nos
1.00
50000
50000
m2
125.30
4500
563850
m2
m2
m2
51.00
51.00
51.00
4500
3000
700
229500
153000
35700
Painting ( internal)
sofit
column
Coridoor area
Tiling
Painting
6
7
8
9
10
11
12
Plastering
slab
Cover stair case 4 1/2"
Plasrering
Painting
Hand rail painting
Stair case tiling
1ST floor
1
2
ceiling
3
4
Painting ceiling
sofit painting
Wall painting
Plastering
8
9
10
11
12
13
2nd Floor
1
2
3
4
Floor tile
Ceiling
ceiling painting
Wall painting
m2
236.40
700
165480
5 Plastering beam
6 Wall plastering
m2
127.50
600
76500
Nos
4.00
4000
16000
5626073.8
m2
1020.40
3000
3061200
Roof
1
Ground floor
2
3
4
Valance board
Gutter
Downpipe
m
m
m
170.00
108.00
120.00
1000
1000
1000
170000
108000
120000
Ceiling
m2
74.40
1500
111600
3570800
External painting
Plastering
m2
m2
3456.00
288.00
600
600
2073600
172800
2246400
Item
32461.9114
2000000.00
2 Living room
Item
32461.9114
2000000.00
Item No
1
2
3
4
5
6
BILL SUMMERY
Description
Rooms (28Nos)
Other internal Area
Roof and roof plumbing
External Plastering and painting
Gem and juwelary show room
Living room
Provision for electical
Rs
Amount
17584496.80
5626073.80
3570800.00
2246400.00
2000000.00
2000000.00
2000000.00
35027770.60