The District of Columbia Public Library is asking contractors to respond to this Addendum to the Request for Proposal to furnish all parts, labor, material and equipment necessary to complete the Work of the following named Bid Packages (BP) tasks associated with the complete renovation and addition at the Georgetown Neighborhood Library.
The District of Columbia Public Library is asking contractors to respond to this Addendum to the Request for Proposal to furnish all parts, labor, material and equipment necessary to complete the Work of the following named Bid Packages (BP) tasks associated with the complete renovation and addition at the Georgetown Neighborhood Library.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
The District of Columbia Public Library is asking contractors to respond to this Addendum to the Request for Proposal to furnish all parts, labor, material and equipment necessary to complete the Work of the following named Bid Packages (BP) tasks associated with the complete renovation and addition at the Georgetown Neighborhood Library.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
The Scope of Work includes the furniture, fixtures and equipment at the Georgetown Neighborhood Library which is located at 3260 R Street, NW, Washington, DC.
FURNITURE, FIXTURES & EQUIPMENT
Contractor shall be responsible for labor, material and equipment for all furniture, fixtures and equipment including but not limited to library equipment and stack systems, and residential appliances, and furniture at the existing building and the new addition as indicated in bid documents (100% Final Construction Drawings and Specifications dated July 9, 2009). Available on CD. Work includes but is not limited to the following specification sections Division 1 – General Requirements Division 11 – Equipment 11054 Library Stack Systems 11130 Audio Visual Equipment 11451 Residential Appliances 11510 Library Equipment 11511 Library Book and Media Despository Division 12 – Furnishings 12560 Library Furniture and Equipment
1. Furnish furniture as scheduled and place according to provided furniture
layouts. 2. Furnish and install non-millwork library equipment and stack systems as scheduled. 3. Furnish and install residential appliances for pantries and meeting rooms as indicated. 4. Hoisting as required for this work. 5. Provide any Independent Testing & Inspection Services required for this Work, including materials testing and inspections; 6. During the period of this work, contractor agrees that all employees must be experienced in performing the work. 7. Contractor shall coordinate this work with other work in progress. 8. The Contractor shall ensure that no elements determined to be unstable are left unsupported. Any and all required structural bracing for structural systems to remain shall be included in this scope of work. 9. Contractor shall remove and transport debris resulting from erection operations and materials to site disposal area. Recyclable materials shall be separated and stored or stockpiled without intermixing with other surplus materials before transporting to recycling facilities in accordance with a recycling program consistent with the Project LEED Certification Program. 10. Contractor shall comply with all identified performance and specification requirements to achieve LEED points toward the Silver certification goal as indicated in the bid documents. 11. Contractor shall take all necessary precautions to avoid damage to all existing and completed construction in place. 12. It is Contractor’s responsibility to read the Hazardous Materials Survey Report for Georgetown Neighborhood Library, including the July 8th 2008 addendum. 13. Contractor shall submit bids detailing their proposed means, methods and schedule for this scope of work. 14. Provide labor for incidental project clean-up 15. Provide miscellaneous temporary protection of existing conditions during construction as specifically specified herein and OSHA safety barricades, rails and floor coverings, for this Work. 16. Engineering, site survey and layout for this Work including any required field measurements. 17. Provide monthly Project construction progress documentation & photographs, including existing building pre-construction condition documentation. 18. Contractor shall leave the workplace in a clean and presentable condition ready for subsequent trades and prepared for finishes as specified. Submittals will be required for approval prior to execution of the work.