Sie sind auf Seite 1von 2

BP-19

FURNITURE, FIXTURES & EQUIPMENT PACKAGE

SCOPE OF WORK

DESIGNATED 100% CBE SUBCONTRACTING SET-ASIDE REQUIREMENT

DEFINITION OF PROJECT AREA:

The Scope of Work includes the furniture, fixtures and equipment at the Georgetown
Neighborhood Library which is located at 3260 R Street, NW, Washington, DC.

FURNITURE, FIXTURES & EQUIPMENT


Contractor shall be responsible for labor, material and equipment for all furniture,
fixtures and equipment including but not limited to library equipment and stack systems,
and residential appliances, and furniture at the existing building and the new addition as
indicated in bid documents (100% Final Construction Drawings and Specifications dated
July 9, 2009). Available on CD. Work includes but is not limited to the following
specification sections
Division 1 – General Requirements
Division 11 – Equipment
11054 Library Stack Systems
11130 Audio Visual Equipment
11451 Residential Appliances
11510 Library Equipment
11511 Library Book and Media Despository
Division 12 – Furnishings
12560 Library Furniture and Equipment

1. Furnish furniture as scheduled and place according to provided furniture


layouts.
2. Furnish and install non-millwork library equipment and stack systems as
scheduled.
3. Furnish and install residential appliances for pantries and meeting rooms
as indicated.
4. Hoisting as required for this work.
5. Provide any Independent Testing & Inspection Services required for this
Work, including materials testing and inspections;
6. During the period of this work, contractor agrees that all employees
must be experienced in performing the work.
7. Contractor shall coordinate this work with other work in progress.
8. The Contractor shall ensure that no elements determined to be unstable
are left unsupported. Any and all required structural bracing for
structural systems to remain shall be included in this scope of work.
9. Contractor shall remove and transport debris resulting from erection
operations and materials to site disposal area. Recyclable materials shall
be separated and stored or stockpiled without intermixing with other
surplus materials before transporting to recycling facilities in accordance
with a recycling program consistent with the Project LEED Certification
Program.
10. Contractor shall comply with all identified performance and
specification requirements to achieve LEED points toward the Silver
certification goal as indicated in the bid documents.
11. Contractor shall take all necessary precautions to avoid damage to all
existing and completed construction in place.
12. It is Contractor’s responsibility to read the Hazardous Materials Survey
Report for Georgetown Neighborhood Library, including the July 8th
2008 addendum.
13. Contractor shall submit bids detailing their proposed means, methods
and schedule for this scope of work.
14. Provide labor for incidental project clean-up
15. Provide miscellaneous temporary protection of existing conditions
during construction as specifically specified herein and OSHA safety
barricades, rails and floor coverings, for this Work.
16. Engineering, site survey and layout for this Work including any required
field measurements.
17. Provide monthly Project construction progress documentation &
photographs, including existing building pre-construction condition
documentation.
18. Contractor shall leave the workplace in a clean and presentable
condition ready for subsequent trades and prepared for finishes as
specified.
Submittals will be required for approval prior to execution of the work.