Sie sind auf Seite 1von 26

ACUAVALLE S.A.

ESP
CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Presupuesto de Obra - Red de Alcantarillado Sanitario
Elaboro : Wilfredo Vasquez Ponce
Santiago de Cali, Noviembre de 2010
ITEM

DESCRIPCION

UND

CANTIDAD

1
2
3
4
5

VALLA INFORMATIVA 2X1


CAMPAMENTO EN GUADUA Y ESTERILLA CON TEJA NEGRA
NIVELACION TOPOGRAFICA
COMISION TOPOGRAFICA
LIMPIEZA,DESCAPOTE A MANO(INCLUYE RETIRO HASTA 10KMS)
POMPONES PARA SEALIZACION 1,20Mt. EN GUADUA PINTADO
AMARILLO Y NEGRO
SUMINISTRO Y COLOCACION DE CINTA PARA SEALIZACION
EXCAVACIN A MQUINA EN SECO EN MATERIAL COMN HASTA 3.0 m
DE PROFUNDIDAD
EXCAVACIN A MNO EN CONGLOMERADO HASTA 3.0 m DE
PROFUNDIDAD
RETIRO DE MATERIAL DE EXCAVACIN CON CARGUE EN VOLQUETA A
MAQUINA EN BANCO- DE 10 A 20Km.CON ACARREO
RELLENO CON MATERIAL SELECCIONADO DEL SITIO COMPACTADO CON
EQUIPO MECNICO AL 95% P.M. COMPACTADO EN CAPAS DE MXIMO
0.30 M. DE ESPESOR, SEGN NORMA INVIAS E-220; CBR>=5%, LL<40%,
PASA 200<= 35%, TAMAO MAXIMO 4"; CONTENIDO DE MATERIA
ORGNICA < 1%.

UND
M2
ML
DIA
M2
UND

3
80
7,400
60
5,920

M3

12

RELLENO CON MATERIAL IMPORTADO SUMINISTRADO POR EL


CONTRATISTA COMPACTADO CON EQUIPO MECNICO AL 95% P.M.
COMPACTADO EN CAPAS DE MXIMO 0.30 M. DE ESPESOR, SEGN
NORMA INVIAS E-220; CBR>=5%, LL<40%, PASA 200<= 35%, TAMAO
MAXIMO 4"; CONTENIDO DE MATERIA O
SUMINISTRO Y COLOCACIN DE TRITURADO O GRAVA DE RO, PARA
CIMENTACIN DE TUBERAS Y FILTROS. COMPACTADO CON EQUIPO
VIBROCOMPACTADOR (INCLUYE ACARREO)

M3

13

SUMINISTRO, TRANSPORTE TUBERA DE PVC PARA ALCANTARILLADO,


=8" (200mm) (INCLUYE ACARREO INTERNO).
INSTALACIN TUBERA DE PVC PARA ALCANTARILLADO, =8" (200mm)
(INCLUYE ACARREO INTERNO).
SUMINISTRO Y TRANSPORTE TUBERA PVC NOVAFORT =6" PARA
CONEXIONES DOMICILIARES (INCLUYE EXCAVACIN, RELLENO CON
MATERIAL IMPORTADO, CIMENTACION Y RETIRO DE SOBRANTES HASTA
20 Km.)

ML

INSTALACIN TUBERA PVC NOVAFORT =6" PARA CONEXIONES


DOMICILIARES (INCLUYE EXCAVACIN, RELLENO CON MATERIAL
IMPORTADO, CIMENTACION Y RETIRO DE SOBRANTES HASTA 20 Km.)

ML

UN

23

SUMINISTRO E INSTALACIN DE SILLA YEE DE 200mm X 160mm, INCLUYE


2 ABRAZADERAS, CAUCHO, ACONDICIONADOR Y ADHESIVO
LOSA INFERIOR CTO. 3000PSI,E=25CMS.PARA CAMARA ALCANTAR
CILINDRICA D= 1,5 INCLUYE CAUELA
LOSA SUPERIOR CTO. 3000PSI, E=25CMS. PARA CAMARA ALCANTAR
CILINDRICA D= 1,5 INCLUYE TAPA
CILINDRO EN CTO. 3000PSI,PARA CAMARA DE ALCANTARILLADO
PISO CTO. 3000PSI,E=10 CMS.PARA CAJA
DOMICILIARIA INCLUYE
CAUELA
TAPA CTO. 3000PSI, E=10 CMS.PARA CAJA DOMICILIARIA

24
25

PAREDES EN CTO. 3000PSI,PARA CAJA DOMICILIARIA


CONSTRUCCION POZOS SEPTICOS, TRAMPA GRASA Y FILTRO

6
7
8
9
10

11

14
15

16

17
18
19
20
21
22

TOTAL COSTO DIRECTO


A.I.U (30%)
SUBTOTAL COSTO + AIU

IVA 16% sobre la utilidad 3%


TOTAL

ML
M3
M3
m3

VALOR
UNITARIO

VALOR
PARCIAL

100
1,000
17,573
1,756
3,497

m3
14,076

2,106

999

ML

7,390
7,390

ML
1,750

1,750

UND
UND

250
111
111

ML
UND

168

UND

250

UND
UND

250
47

250

Pgina 1

WILFREDO VASQUEZ PONCE

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Diseo hidraulico de alcantarillado sanitario

DATOS INICIALES:

Coef. produccion aguas residuales (lps/usuario)=

0.00570

0.0005

Coef. de Infiltracion (lps/m)=


Coeficiente de rugosidad Manning =

0.010

Elaboro: Ing. German Santacruz


Santiago de Cali, Noviembre de 2010
Revisado por:

Tuberia de PVC
Aguas residuales

Usuarios
Camaras
Inicio-Fin

Longitud
(m)
Atras

Propios

Acumula
dos

Infiltracin
l/s

Caudal
Caudal
medio de Factor de
aguas
aguas
mayoraci
residuales
residuales
n
l/s
l/s

Caudal
total q
l/s

Valores reales de diseo


Vel. real Tirante Y
m/s
(m)

Fza Tr.
Kg/m

Pend.
(%)

Diseo a tubo lleno


Diam
interno
(m)

Diam
(")

Capacidad
Vel (m/s)
Caudal Q l/s

Cotas (m)

Fza Tr.
Kg/m

Rasante
Inicial

Final

1088.80
1086.18
1085.80
1085.20
1084.50
1082.40

1-2
2-3
3-4
4-5
5-6
6-8

80.00
90.00
90.00
90.00
28.00
82.00

0
5
7
7
8
8

5
2
0
1
0
5

5
7
7
8
8
13

0.04
0.05
0.05
0.05
0.01
0.04

0.03
0.04
0.04
0.05
0.05
0.07

4.80
4.69
4.69
4.64
4.64
4.48

0.14
0.19
0.19
0.21
0.21
0.33

0.18
0.23
0.23
0.26
0.23
0.37

0.00
0.00
0.26
0.29
0.00
0.60

0.00
0.00
0.02
0.02
0.00
0.02

0.00
0.00
0.04
0.05
0.00
0.23

2.80
2.90
0.50
0.60
2.30
2.60

8
8
8
8
8
8

0.182
0.182
0.182
0.182
0.182
0.182

55.48
56.46
23.45
25.68
50.28
53.46

2.13
2.17
0.90
0.99
1.93
2.06

1.27
1.32
0.23
0.27
1.05
1.18

1091.00
1088.80
1086.18
1085.80
1085.20
1084.50

7-8

60.00

0.03

0.04

4.69

0.19

0.22

0.33

0.02

0.07

0.80

0.182

29.66

1.14

0.36

1082.83 1082.40

8-10

38.00

20

23

0.02

0.13

4.29

0.56

0.58

0.58

0.02

0.22

2.50

0.182

52.43

2.02

1.14

1082.40 1081.40

9-10

39.00

0.02

0.03

4.74

0.16

0.18

0.00

0.00

0.00

1.20

0.182

36.32

1.40

0.55

1081.75 1081.40

10-11
11-12

54.00
90.00

29
32

3
8

32
40

0.03
0.05

0.18
0.23

4.19
4.12

0.76
0.94

0.79
0.99

0.46
0.78

0.02
0.02

0.14
0.39

1.10
4.40

8
8

0.182
0.182

34.78
69.55

1.34
2.67

0.50
2.00

1081.40 1080.83
1080.83 1077.00

13-12

57.00

0.03

0.02

4.88

0.11

0.14

0.29

0.02

0.05

0.60

0.182

25.68

0.99

0.27

1076.96 1077.00

14-15
15-16
16-17
17-18
18-12

90.00
90.00
100.00
100.00
96.00

0
1
2
2
6

1
1
0
4
4

1
2
2
6
10

0.05
0.05
0.05
0.05
0.05

0.01
0.01
0.01
0.03
0.06

5.40
5.14
5.14
4.74
4.56

0.03
0.06
0.06
0.16
0.26

0.08
0.10
0.11
0.21
0.31

0.00
0.00
0.22
0.22
0.26

0.00
0.00
0.02
0.02
0.02

0.00
0.00
0.03
0.03
0.04

0.40
0.40
0.35
0.35
0.35

8
8
8
8
8

0.182
0.182
0.182
0.182
0.182

20.97
20.97
19.62
19.62
19.62

0.81
0.81
0.75
0.75
0.75

0.18
0.18
0.16
0.16
0.16

1076.98
1076.50
1076.00
1076.13
1077.06

19-20
20-23

93.00
100.00

0
5

5
1

5
6

0.05
0.05

0.03
0.03

4.80
4.74

0.14
0.16

0.18
0.21

0.22
0.31

0.02
0.02

0.03
0.06

0.35
0.70

8
8

0.182
0.182

19.62
27.74

0.75
1.07

0.16
0.32

1076.80 1077.50
1077.50 1075.80

21-22
22-23

90.00
56.00

0
3

3
6

3
9

0.05
0.03

0.02
0.05

4.99
4.60

0.09
0.24

0.13
0.26

0.29
0.00

0.02
0.00

0.05
0.00

0.60
5.00

8
8

0.182
0.182

25.68
74.14

0.99
2.85

0.27
2.28

1078.60 1078.00
1078.00 1075.80

24-25
25-26
26-27
27-28

78.00
90.00
90.00
90.00

0
1
9
15

1
8
6
7

1
9
15
22

0.04
0.05
0.05
0.05

0.01
0.05
0.09
0.13

5.40
4.60
4.43
4.31

0.03
0.24
0.38
0.54

0.07
0.28
0.42
0.59

0.00
0.29
0.31
0.47

0.00
0.02
0.02
0.02

0.00
0.05
0.06
0.14

1.30
0.60
0.50
1.60

8
8
8
8

0.182
0.182
0.182
0.182

37.80
25.68
23.45
41.94

1.45
0.99
0.90
1.61

0.59
0.27
0.23
0.73

1076.80
1075.76
1075.25
1074.89

30-29
29-28

100.00
80.00

0
3

3
1

3
4

0.05
0.04

0.02
0.02

4.99
4.88

0.09
0.11

0.14
0.15

0.00
0.26

0.00
0.02

0.00
0.04

2.40
0.50

8
8

0.182
0.182

51.37
23.45

1.97
0.90

1.09
0.23

1075.60 1073.27
1073.27 1073.46

23-31
31-32
32-33
33-34

85.00
66.00
86.00
50.00

15
16
19
21

1
3
2
2

16
19
21
23

0.04
0.03
0.04
0.03

0.09
0.11
0.12
0.13

4.41
4.35
4.32
4.29

0.40
0.47
0.52
0.56

0.44
0.50
0.56
0.59

0.26
0.29
0.29
0.29

0.02
0.03
0.03
0.03

0.04
0.05
0.05
0.05

0.35
0.35
0.35
0.35

8
8
8
8

0.182
0.182
0.182
0.182

19.62
19.62
19.62
19.62

0.75
0.75
0.75
0.75

0.16
0.16
0.16
0.16

1075.80
1076.20
1075.27
1074.90

2 de 26

1076.50
1076.00
1076.13
1077.06
1077.00

1075.76
1075.25
1074.89
1073.46

1076.20
1075.27
1074.90
1074.30

Revisado por:

Cotas (m)
q/Q

Batea
Inicial

1089.62
1087.37
1084.75
1084.29
1083.74
1083.08

Altura a
clave
inicial
(m)

Altura a
clave
final
(m)

RELACION

RELACION

RELACION

v/V

d/D

t/T

Final

1087.38
1084.76
1084.30
1083.75
1083.09
1080.95

0.00
0.00
0.01
0.01
0.00
0.01

1.18
1.23
1.23
1.31
1.26
1.21

1.22
1.22
1.30
1.25
1.20
1.24

0.00
0.00
0.29
0.29
0.00
0.29

0.00
0.00
0.08
0.08
0.00
0.08

0.00
0.00
0.20
0.20
0.00
0.20

1081.55 1081.07

0.01

1.08

1.13

0.29

0.08

0.20

1080.94 1079.99

0.01

1.25

1.20

0.29

0.08

0.20

1080.47 1080.00

0.00

1.08

1.20

0.00

0.00

0.00

1079.99 1079.40
1079.39 1075.43

0.02
0.01

1.21
1.24

1.23
1.37

0.34
0.29

0.11
0.08

0.27
0.20

1075.68 1075.34

0.01

1.08

1.46

0.29

0.08

0.20

1075.80
1075.43
1075.06
1074.70
1074.34

1075.44
1075.07
1074.71
1074.35
1074.00

0.00
0.00
0.01
0.01
0.02

0.98
0.87
0.74
1.23
2.52

0.86
0.73
1.22
2.51
2.79

0.00
0.00
0.29
0.29
0.34

0.00
0.00
0.08
0.08
0.11

0.00
0.00
0.20
0.20
0.27

1075.62 1075.29
1075.27 1074.57

0.01
0.01

0.98
2.02

2.00
1.02

0.29
0.29

0.08
0.08

0.20
0.20

1077.42 1076.88
1076.86 1074.06

0.01
0.00

0.98
0.94

0.92
1.54

0.29
0.00

0.08
0.00

0.20
0.00

1075.62
1074.58
1074.02
1073.55

1074.60
1074.04
1073.57
1072.11

0.00
0.01
0.02
0.01

0.98
0.97
1.02
1.13

0.95
1.00
1.11
1.14

0.00
0.29
0.34
0.29

0.00
0.08
0.11
0.08

0.00
0.20
0.27
0.20

1074.42 1072.02
1072.00 1071.60

0.00
0.01

0.98
1.07

1.05
1.66

0.00
0.29

0.00
0.08

0.00
0.20

1074.04
1073.72
1073.47
1073.15

0.02
0.03
0.03
0.03

1.56
2.28
1.60
1.55

2.26
1.58
1.53
1.12

0.34
0.39
0.39
0.39

0.11
0.13
0.13
0.13

0.27
0.33
0.33
0.33

1073.74
1073.49
1073.17
1072.97

3 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Diseo hidraulico de alcantarillado sanitario

DATOS INICIALES:

Coef. produccion aguas residuales (lps/usuario)=

0.00570

0.0005

Coef. de Infiltracion (lps/m)=


Coeficiente de rugosidad Manning =

0.010

Elaboro: Ing. German Santacruz


Santiago de Cali, Noviembre de 2010
Revisado por:

Tuberia de PVC
Aguas residuales

Usuarios
Camaras
Inicio-Fin

Longitud
(m)
Atras

Propios

Acumula
dos

Infiltracin
l/s

Caudal
Caudal
medio de Factor de
aguas
aguas
mayoraci
residuales
residuales
n
l/s
l/s

Caudal
total q
l/s

Valores reales de diseo


Vel. real Tirante Y
m/s
(m)

Fza Tr.
Kg/m

Pend.
(%)

Diseo a tubo lleno


Diam
interno
(m)

Diam
(")

Capacidad
Vel (m/s)
Caudal Q l/s

Cotas (m)

Fza Tr.
Kg/m

Rasante
Inicial

Final

34-35

86.00

23

28

0.04

0.16

4.23

0.68

0.72

0.32

0.03

0.06

0.35

0.182

19.62

0.75

0.16

1074.30 1074.33

32-35

47.00

0.02

0.02

4.88

0.11

0.13

0.00

0.00

0.00

2.00

0.182

46.89

1.80

0.91

1075.27 1074.33

35-36
36-37
37-44

19.00
50.00
41.00

32
32
32

0
0
0

32
32
32

0.01
0.03
0.02

0.18
0.18
0.18

4.19
4.19
4.19

0.76
0.76
0.76

0.77
0.79
0.79

0.32
0.32
0.50

0.03
0.03
0.02

0.06
0.06
0.16

0.35
0.35
1.30

8
8
8

0.182
0.182
0.182

19.62
19.62
37.80

0.75
0.75
1.45

0.16
0.16
0.59

1074.33 1074.49
1074.49 1073.71
1073.71 1073.00

38-40

40.00

0.02

0.01

5.40

0.03

0.05

0.00

0.00

0.00

2.30

0.182

50.28

1.93

1.05

1076.30 1075.39

39-40

75.00

0.04

0.02

4.88

0.11

0.15

0.23

0.02

0.04

0.40

0.182

20.97

0.81

0.18

1075.39 1075.39

40-42

34.00

0.02

0.03

4.74

0.16

0.18

0.37

0.02

0.09

1.00

0.182

33.16

1.27

0.46

1075.39 1074.70

41-42

52.00

10

0.03

0.06

4.56

0.26

0.29

0.37

0.02

0.09

1.00

0.182

33.16

1.27

0.46

1074.50 1074.70

42-43
43-44

40.00
4.00

16
16

0
0

16
16

0.02
0.00

0.09
0.09

4.41
4.41

0.40
0.40

0.42
0.40

0.83
0.31

0.02
0.02

0.44
0.06

5.00
0.50

8
8

0.182
0.182

74.14
23.45

2.85
0.90

2.28
0.23

1074.70 1072.00
1072.00 1073.00

44-45
45-46
46-47
47-48
48-72

87.00
37.00
9.00
61.00
17.00

48
48
48
48
48

0
0
0
0
0

48
48
48
48
48

0.04
0.02
0.00
0.03
0.01

0.27
0.27
0.27
0.27
0.27

4.07
4.07
4.07
4.07
4.07

1.11
1.11
1.11
1.11
1.11

1.16
1.13
1.12
1.14
1.12

0.35
0.35
0.35
0.35
0.35

0.04
0.04
0.04
0.04
0.04

0.07
0.07
0.07
0.07
0.07

0.35
0.35
0.35
0.35
0.35

8
8
8
8
8

0.182
0.182
0.182
0.182
0.182

19.62
19.62
19.62
19.62
19.62

0.75
0.75
0.75
0.75
0.75

0.16
0.16
0.16
0.16
0.16

1073.00
1072.15
1072.60
1072.70
1072.37

28-49
49-50

90.00
74.00

26
28

2
3

28
31

0.05
0.04

0.16
0.18

4.23
4.20

0.68
0.74

0.72
0.78

0.32
0.32

0.03
0.03

0.06
0.06

0.35
0.35

8
8

0.182
0.182

19.62
19.62

0.75
0.75

0.16
0.16

1073.46 1074.81
1074.81 1074.20

4 de 26

1072.15
1072.60
1072.70
1072.37
1073.80

Revisado por:

Cotas (m)
q/Q

Batea
Inicial

Altura a
clave
inicial
(m)

Altura a
clave
final
(m)

RELACION

RELACION

RELACION

v/V

d/D

t/T

Final

1072.95 1072.65

0.04

1.14

1.47

0.42

0.15

0.38

1074.09 1073.15

0.00

0.98

0.98

0.00

0.00

0.00

1072.63 1072.57
1072.55 1072.37
1072.35 1071.82

0.04
0.04
0.02

1.49
1.74
1.16

1.72
1.14
0.98

0.42
0.42
0.34

0.15
0.15
0.11

0.38
0.38
0.27

1075.12 1074.20

0.00

0.98

0.99

0.00

0.00

0.00

1074.21 1073.91

0.01

0.98

1.28

0.29

0.08

0.20

1073.89 1073.55

0.01

1.30

0.95

0.29

0.08

0.20

1073.32 1072.80

0.01

0.98

1.70

0.29

0.08

0.20

1072.78 1070.78
0.01
1070.76 1070.74
0.02
paso quebrada
1070.72 1070.41
0.06
1070.39 1070.26
0.06
1070.24 1070.21
0.06
1070.19 1069.98
0.06
1069.96 1069.90
0.06

1.72
1.04

1.02
2.06

0.29
0.34

0.08
0.11

0.20
0.27

2.08
1.55
2.15
2.30
2.21

1.53
2.13
2.28
2.19
3.70

0.47
0.47
0.47
0.47
0.47

0.19
0.19
0.19
0.19
0.19

0.45
0.45
0.45
0.45
0.45

1071.58 1071.26
1071.24 1070.98

1.68
3.36

3.34
3.01

0.42
0.42

0.15
0.15

0.38
0.38

0.04
0.04

5 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Cantidades de movimiento de tierras - Red de Alcantarillado
Elaboro: Ing. German Santacruz
Santiago de Cali, Noviembre de 2010

Tramo

Dimetro Dimetro Clase de


(")
Ext (m) tubera

Cota
Batea
Inicial

Cota
Batea
Final

Cota
Terreno
Inicial

Cota
Terreno
Final

H Altura de
cimentacin
(m)

H
Longitud
Excavacin
(m)
(m)

1-2
2-3

0.200

PVC

1089.62 1087.38

1091.00

1088.80

0.10

1.50

0.200

PVC

1087.37 1084.76

1088.80

1086.18

0.10

1.53

3-4
4-5

0.200

PVC

1084.75 1084.30

1086.18

1085.80

0.10

1.57

0.200

PVC

1084.29 1083.75

1085.80

1085.20

0.10

1.58

5-6
6-8

0.200

PVC

1083.74 1083.09

1085.20

1084.50

0.10

1.53

0.200

PVC

1083.08 1080.95

1084.50

1082.40

0.10

1.53

Excavacin Volumen
Ancho de
a maquina de grava
zanja (m)
(m)
(m)

Volumen de
tubera (m)

Relleno
importado
(m)

Retiros
(m)

Relleno del
sitio (m)

80.00
90.00

0.80

96.13

6.40

2.51

13.49

22.40

73.7

0.80

109.94

7.20

2.83

15.17

25.20

84.7

90.00
90.00

0.80

112.82

7.20

2.83

15.17

25.20

87.6

0.80

113.90

7.20

2.83

15.17

25.20

88.7

28.00
82.00

0.80

34.36

2.24

0.88

4.72

7.84

26.5

0.80

100.50

6.56

2.58

13.82

22.96

77.5

0.00

0.00

10.12

16.80

0.00

0.00

6.41

10.64

0.10

7-8

0.200

PVC

1081.55 1081.07

1082.83

1082.40

0.10

1.41

60.00

0.80

67.54

4.80

1.88

0.10

8-10

0.200

PVC

1080.94 1079.99

1082.40

1081.40

9-10

0.200

PVC

1080.47 1080.00

1081.75

1081.40

0.10

1.53

38.00

0.80

46.60

3.04

1.19

1.44

39.00

0.80

44.96

3.12

1.23

0.10
0.10
0.10

10-11
11-12

0.200

PVC

1079.99 1079.40

1081.40

1080.83

0.10

1.52

0.200

PVC

1079.39 1075.43

1080.83

1077.00

0.10

1.61

54.00
90.00

0.200

PVC

1075.68 1075.34

1076.96

1077.00

0.10

1.57

57.00

0.00

6.57

10.92

0.00

0.00

36.0
34.0

0.80

65.75

4.32

1.70

9.10

15.12

50.6

0.80

115.85

7.20

2.83

15.17

25.20

90.6

0.00

0.00

9.61

15.96

0.00

0.00

0.10

13-12

0.00

50.7

0.80

71.73

4.56

1.79

0.10

55.8

14-15

0.200

PVC

1075.80 1075.44

1076.98

1076.50

0.10

1.22

90.00

0.80

87.98

7.20

2.83

15.17

25.20

62.8

15-16
16-17
17-18

0.200

PVC

1075.43 1075.07

1076.50

1076.00

0.10

1.10

0.80

79.34

7.20

2.83

15.17

25.20

54.1

0.200

PVC

1075.06 1074.71

1076.00

1076.13

0.10

1.28

0.80

102.56

8.00

3.14

16.86

28.00

74.6

0.200

PVC

1074.70 1074.35

1076.13

1077.06

0.10

2.17

90.00
100.00
100.00

0.80

173.76

8.00

3.14

16.86

28.00

145.8

18-12

0.200

PVC

1074.34 1074.00

1077.06

1077.00

0.10

2.96

96.00

0.80

227.33

7.68

3.02

16.18

26.88

200.4

0.00

0.00

0.10

19-20
20-23

0.200

PVC

1075.62 1075.29

1076.80

1077.50

0.10

1.79

0.200

PVC

1075.27 1074.57

1077.50

1075.80

0.10

1.83

93.00
100.00

0.80

133.53

7.44

2.92

15.68

26.04

107.5

0.80

146.20

8.00

3.14

16.86

28.00

118.2

0.00

0.00

0.10

21-22

0.200

PVC

1077.42 1076.88

1078.60

1078.00

0.10

1.25

90.00

0.80

90.14

7.20

2.83

15.17

25.20

64.9

22-23

0.200

PVC

1076.86 1074.62

1078.00

1075.80

0.10

1.26

56.00

0.80

56.54

4.48

1.76

9.44

15.68

40.9

6 de 26

Tramo
1-2
2-3
3-4
4-5
5-6
6-8
7-8
8-10
9-10
10-11
11-12
13-12
14-15
15-16
16-17
17-18
18-12
19-20
20-23
21-22
22-23

7 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Cantidades de movimiento de tierras - Red de Alcantarillado
Elaboro: Ing. German Santacruz
Santiago de Cali, Noviembre de 2010

Tramo

Dimetro Dimetro Clase de


(")
Ext (m) tubera

Cota
Batea
Inicial

Cota
Batea
Final

Cota
Terreno
Inicial

Cota
Terreno
Final

H Altura de
cimentacin
(m)

H
Longitud
Excavacin
(m)
(m)

Excavacin Volumen
Ancho de
a maquina de grava
zanja (m)
(m)
(m)

Volumen de
tubera (m)

Relleno
importado
(m)

0.10

0.00

0.00

0.80

79.19

6.24

2.45

13.15

21.84

57.3

0.80

92.95

7.20

2.83

15.17

25.20

67.8

0.80

98.71

7.20

2.83

15.17

25.20

73.5

1.44

90.00
90.00

0.80

103.75

7.20

2.83

15.17

25.20

78.6

0.00

0.00

0.10

1.32

100.00

0.80

105.36

8.00

3.14

16.86

28.00

77.4

0.10

1.67

80.00

0.80

106.69

6.40

2.51

13.49

22.40

84.3

0.00

0.00

0.200

PVC

1075.62 1074.60

1076.80

1075.76

0.10

1.27

0.200

PVC

1074.58 1074.04

1075.76

1075.25

0.10

1.29

26-27
27-28

0.200

PVC

1074.02 1073.57

1075.25

1074.89

0.10

1.37

0.200

PVC

1073.55 1072.11

1074.89

1073.46

0.10

30-29

0.200

PVC

1074.42 1072.02

1075.60

1073.27

29-28

0.200

PVC

1072.00 1071.60

1073.27

1073.46

0.10

0.10

23-31
31-32

0.200

PVC

1074.55 1074.25

1075.80

1076.20

0.10

1.70

0.200

PVC

1074.23 1074.00

1076.20

1075.27

0.10

1.72

32-33
33-34

0.200

PVC

1073.98 1073.68

1075.27

1074.90

0.10

1.35

0.200

PVC

1073.66 1073.06

1074.90

1074.30

0.10

34-35

0.200

PVC

1073.04 1072.74

1074.30

1074.33

0.10

85.00
66.00

0.80

115.52

6.80

2.67

14.33

23.80

91.7

0.80

90.71

5.28

2.07

11.13

18.48

72.2

0.80

93.16

6.88

2.70

14.50

24.08

69.1

1.34

86.00
50.00

0.80

53.58

4.00

1.57

8.43

14.00

39.6

1.52

86.00

0.80

104.92

6.88

2.70

14.50

24.08

80.8

0.00

0.00

7.92

13.16

0.00

0.00

0.10
8

0.200

PVC

1074.09 1073.90

1075.27

1074.33

35-36

0.200

PVC

1072.72 1072.64

1074.33

1074.49

36-37
37-44

0.200

PVC

1072.62 1072.42

1074.49

0.200

PVC

1072.40 1071.87

1073.71

0.91

47.00

0.80

34.07

3.76

1.48

0.10

1.83

19.00

0.80

27.79

1.52

0.60

3.20

5.32

22.5

1073.71

0.10

1.68

0.80

67.06

4.00

1.57

8.43

14.00

53.1

1073.00

0.10

1.32

50.00
41.00

0.80

43.23

3.28

1.29

6.91

11.48

31.8

0.00

0.00

6.74

11.20

0.00

0.00

12.64

21.00

0.00

0.00

5.73

9.52

0.10
0.10

0.10

38-40

0.200

PVC

1075.12 1074.20

1076.30

1075.39

0.10

1.29

40.00

0.80

41.18

3.20

1.26

0.10

39-40

0.200

PVC

1074.21 1073.91

1075.39

Relleno del
sitio (m)

78.00
90.00

24-25
25-26

32-35

Retiros
(m)

1075.39

0.10

1.43

75.00

0.80

85.92

6.00

2.36

0.10

40-42

0.200

PVC

1073.89 1073.55

1075.39

1074.70

41-42

0.200

PVC

1073.32 1072.80

1074.50

1074.70

0.10

1.43

34.00

0.80

38.81

2.72

1.07

1.64

52.00

0.80

68.31

4.16

1.63

0.10
0.10
0.10

8 de 26

0.00

0.00

8.77

14.56

0.00

0.00

20.9

30.0
64.9
29.3
53.7

Tramo

24-25
25-26
26-27
27-28
30-29
29-28
23-31
31-32
32-33
33-34
34-35
32-35
35-36
36-37
37-44
38-40
39-40
40-42
41-42

9 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Cantidades de movimiento de tierras - Red de Alcantarillado
Elaboro: Ing. German Santacruz
Santiago de Cali, Noviembre de 2010

Tramo
42-43
43-44

Dimetro Dimetro Clase de


(")
Ext (m) tubera

Cota
Batea
Inicial

Cota
Batea
Final

Cota
Terreno
Inicial

Cota
Terreno
Final

H Altura de
cimentacin
(m)

H
Longitud
Excavacin
(m)
(m)

0.200

PVC

1072.78 1070.78

1074.70

1072.00

0.10

1.67

0.200

PVC

1070.76 1070.74

1072.00

1073.00

0.10

1.85

paso quebrada

40.00
4.00

Excavacin Volumen
Ancho de
a maquina de grava
zanja (m)
(m)
(m)

Volumen de
tubera (m)

Relleno
importado
(m)

Retiros
(m)

Relleno del
sitio (m)

0.80

53.50

3.20

1.26

6.74

11.20

42.3

0.80

5.93

0.32

0.13

0.67

1.12

4.8

0.00

0.00

0.10

44-45
45-46

0.200

PVC

1070.72 1070.41

1073.00

1072.15

0.10

2.11

0.200

PVC

1070.39 1070.26

1072.15

1072.60

0.10

2.15

87.00
37.00

0.80

146.80

6.96

2.73

14.67

24.36

122.4

0.80

63.53

2.96

1.16

6.24

10.36

53.2

46-47
47-48

0.200

PVC

1070.24 1070.21

1072.60

1072.70

0.10

2.52

0.200

PVC

1070.19 1069.98

1072.70

1072.37

0.10

9.00
61.00

0.80

18.16

0.72

0.28

1.52

2.52

15.6

2.55

0.80

124.40

4.88

1.92

10.28

17.08

107.3

48-72

0.200

PVC

1069.96 1069.90

1072.37

1073.80

0.10

3.26

17.00

0.80

44.28

1.36

0.53

2.87

4.76

39.5

0.00

0.00

0.10

28-49
49-50

0.200

PVC

1071.58 1071.26

1073.46

1074.81

0.10

2.81

0.200

PVC

1071.24 1070.98

1074.81

1074.20

0.10

3.49

50-51
51-52

0.200

PVC

1070.96 1070.68

1074.20

1073.02

0.10

2.89

0.200

PVC

1070.66 1070.60

1073.02

1072.94

0.10

2.45

52-53
53-54
54-55

0.200

PVC

1070.58 1070.32

1072.94

1073.00

0.10

2.62

0.200

PVC

1070.30 1070.17

1073.00

1072.22

0.10

2.47

0.200

PVC

1070.15 1069.83

1072.22

1072.40

0.10

2.42

55-56
56-57

0.200

PVC

1069.81 1069.57

1072.40

1071.22

0.10

2.22

0.200

PVC

1069.55 1069.41

1071.22

1071.82

0.10

2.14

57-58
58-59

0.200

PVC

1069.39 1069.35

1071.82

1071.82

0.10

2.55

0.200

PVC

1069.33 1069.05

1071.82

1071.21

0.10

2.43

59-60
60-61

0.200

PVC

1069.03 1069.00

1071.21

1071.12

0.10

2.25

0.200

PVC

1068.98 1068.92

1071.12

1070.95

0.10

2.18

61-62
62-63

0.200

PVC

1068.90 1068.84

1070.95

1070.82

0.10

2.11

0.200

PVC

1068.82 1068.75

1070.82

1070.70

0.10

2.07

63-64
64-65
65-66

0.200

PVC

1068.73 1068.56

1070.70

1070.64

0.10

2.12

0.200

PVC

1068.54 1068.51

1070.64

1070.62

0.10

2.20

0.200

PVC

1068.49 1068.47

1070.62

1070.64

0.10

2.25

66-67
67-68

0.200

PVC

1068.45 1068.39

1070.64

1070.36

0.10

2.18

0.200

PVC

1068.37 1068.30

1070.36

1070.14

0.10

2.01

10 de 26

90.00
74.00

0.80

202.64

7.20

2.83

15.17

25.20

177.4

0.80

206.70

5.92

2.32

12.48

20.72

186.0

81.00
17.00

0.80

187.13

6.48

2.54

13.66

22.68

164.4

0.80

33.31

1.36

0.53

2.87

4.76

28.5

74.00
38.00
90.00

0.80

155.02

5.92

2.32

12.48

20.72

134.3

0.80

75.22

3.04

1.19

6.41

10.64

64.6

0.80

174.13

7.20

2.83

15.17

25.20

148.9

70.00
41.00

0.80

124.24

5.60

2.20

11.80

19.60

104.6

0.80

70.28

3.28

1.29

6.91

11.48

58.8

11.00
80.00

0.80

22.47

0.88

0.35

1.85

3.08

19.4

0.80

155.39

6.40

2.51

13.49

22.40

133.0

8.00
16.00

0.80

14.41

0.64

0.25

1.35

2.24

12.2

0.80

27.96

1.28

0.50

2.70

4.48

23.5

17.00
20.00

0.80

28.72

1.36

0.53

2.87

4.76

24.0

0.80

33.14

1.60

0.63

3.37

5.60

27.5

49.00
8.00
6.00

0.80

83.19

3.92

1.54

8.26

13.72

69.5

0.80

14.09

0.64

0.25

1.35

2.24

11.9

0.80

10.78

0.48

0.19

1.01

1.68

9.1

18.00
20.00

0.80

31.37

1.44

0.57

3.03

5.04

26.3

0.80

32.24

1.60

0.63

3.37

5.60

26.6

Tramo
42-43
43-44
44-45
45-46
46-47
47-48
48-72
28-49
49-50
50-51
51-52
52-53
53-54
54-55
55-56
56-57
57-58
58-59
59-60
60-61
61-62
62-63
63-64
64-65
65-66
66-67
67-68

11 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Cantidades de movimiento de tierras - Red de Alcantarillado
Elaboro: Ing. German Santacruz
Santiago de Cali, Noviembre de 2010

Tramo
68-75

Dimetro Dimetro Clase de


(")
Ext (m) tubera
8

0.200

PVC

Cota
Batea
Inicial

Cota
Batea
Final

1068.28 1068.07

Cota
Terreno
Inicial

Cota
Terreno
Final

H Altura de
cimentacin
(m)

1070.14

1069.50

0.10

H
Longitud
Excavacin
(m)
(m)

1.75

60.00

Excavacin Volumen
Ancho de
a maquina de grava
zanja (m)
(m)
(m)
0.80

83.76

4.80

Volumen de
tubera (m)

Relleno
importado
(m)

Retiros
(m)

Relleno del
sitio (m)

1.88

10.12

16.80

67.0

0.00

0.00

0.10

12-69

0.200

PVC

1073.98 1073.63

1077.00

1077.52

0.10

3.55

100.00

0.80

284.24

8.00

3.14

16.86

28.00

69-70
70-71

0.200

PVC

1073.61 1073.56

1077.52

1076.80

0.10

3.68

0.80

47.05

1.28

0.50

2.70

4.48

42.6

0.200

PVC

1073.54 1073.26

1076.80

1074.90

0.10

2.55

16.00
78.00

0.80

159.15

6.24

2.45

13.15

21.84

137.3

71-72

0.200

PVC

1073.24 1072.73

1074.90

1073.88

0.10

1.50

73.00

0.80

87.75

5.84

2.29

12.31

20.44

67.3

0.00

0.00

0.10

256.2

72-73
73-74

0.200

PVC

1069.88 1069.55

1073.88

1072.87

0.10

3.76

279.61

7.44

2.92

15.68

26.04

253.6

0.200

PVC

1069.53 1069.25

1072.87

1071.20

0.10

2.74

93.00
82.00

0.80

0.80

180.04

6.56

2.58

13.82

22.96

157.1

74-75

0.200

PVC

1069.23 1068.41

1071.20

1069.50

0.10

1.63

91.00

0.80

118.85

7.28

2.86

15.34

25.48

93.4

0.00

0.00

75-76
76-77

0.200

PVC

1068.05 1066.61

1069.50

1067.76

0.10

1.40

0.80

100.80

7.20

2.83

15.17

25.20

75.6

0.200

PVC

1066.59 1065.33

1067.76

1066.59

0.10

1.31

90.00
90.00

0.80

94.68

7.20

2.83

15.17

25.20

69.5

77-78
78-79
79-80

0.200

PVC

1065.31 1064.41

1066.59

1065.66

0.10

1.36

0.80

65.52

4.80

1.88

10.12

16.80

48.7

0.200

PVC

1064.39 1063.04

1065.66

1064.36

0.10

1.39

0.80

100.44

7.20

2.83

15.17

25.20

75.2

0.200

PVC

1063.02 1062.12

1064.36

1063.47

0.10

1.45

60.00
90.00
90.00

0.80

104.04

7.20

2.83

15.17

25.20

78.8

80-81
81-82

0.200

PVC

1062.10 1061.82

1063.47

1063.26

0.10

1.51

68.74

4.56

1.79

9.61

15.96

52.8

0.200

PVC

1061.80 1060.72

1063.26

1061.84

0.10

1.39

57.00
90.00

0.80

0.80

100.44

7.20

2.83

15.17

25.20

75.2

82-83
83-84

0.200

PVC

1060.70 1060.00

1061.84

1061.30

0.10

1.33

0.80

106.00

8.00

3.14

16.86

28.00

78.0

0.200

PVC

1059.98 1059.28

1061.30

1060.52

0.10

1.38

100.00
100.00

0.80

110.80

8.00

3.14

16.86

28.00

82.8

84-85
85-86

0.200

PVC

1059.26 1059.02

1060.52

1060.39

0.10

1.42

0.80

37.37

2.64

1.04

5.56

9.24

28.1

0.200

PVC

1059.00 1058.59

1060.39

1060.00

0.10

1.50

33.00
59.00

0.80

70.68

4.72

1.85

9.95

16.52

54.2

86-87
87-88

0.200

PVC

1058.57 1057.58

1060.00

1058.80

0.10

1.42

0.80

102.53

7.20

2.83

15.17

25.20

77.3

0.200

PVC

1057.56 1056.84

1058.80

1058.10

0.10

1.35

90.00
90.00

0.80

97.13

7.20

2.83

15.17

25.20

71.9

88-89
89-90
90-91

0.200

PVC

1056.82 1056.10

1058.10

1057.49

0.10

1.43

0.80

103.25

7.20

2.83

15.17

25.20

78.0

0.200

PVC

1056.08 1054.28

1057.49

1055.45

0.10

1.39

0.80

100.01

7.20

2.83

15.17

25.20

74.8

0.200

PVC

1054.26 1052.82

1055.45

1054.02

0.10

1.29

90.00
90.00
90.00

0.80

93.17

7.20

2.83

15.17

25.20

68.0

91-92
92-93

0.200

PVC

1052.80 1052.17

1054.02

1053.51

0.10

1.38

0.80

99.29

7.20

2.83

15.17

25.20

74.1

0.200

PVC

1052.15 1051.70

1053.51

1053.09

0.10

1.47

90.00
90.00

0.80

106.13

7.20

2.83

15.17

25.20

80.9

0.10

12 de 26

Tramo
68-75
12-69
69-70
70-71
71-72
72-73
73-74
74-75
75-76
76-77
77-78
78-79
79-80
80-81
81-82
82-83
83-84
84-85
85-86
86-87
87-88
88-89
89-90
90-91
91-92
92-93

13 de 26

ACUAVALLE S.A. ESP


CORREGIMIENTO DE BARRANCAS
MUNICIPIO DE PALMIRA -VALLE DEL CAUCA
Cantidades de movimiento de tierras - Red de Alcantarillado
Elaboro: Ing. German Santacruz
Santiago de Cali, Noviembre de 2010

Tramo

Dimetro Dimetro Clase de


(")
Ext (m) tubera

Cota
Batea
Inicial

Cota
Batea
Final

Cota
Terreno
Inicial

Cota
Terreno
Final

H Altura de
cimentacin
(m)

H
Longitud
Excavacin
(m)
(m)

93-94
94-95
95-96

0.200

PVC

1051.68 1050.78

1053.09

1052.00

0.10

1.41

0.200

PVC

1050.76 1049.14

1052.00

1050.36

0.10

1.33

0.200

PVC

1049.12 1048.76

1050.36

1050.10

0.10

1.39

96-97
97-98

0.200

PVC

1048.74 1048.38

1050.10

1051.05

0.10

2.11

0.200

PVC

1048.36 1048.00

1051.05

1050.15

0.10

2.52

98-99
99-100

0.200

PVC

1047.98 1047.80

1050.15

1049.40

0.10

1.99

0.200

PVC

1047.78 1047.62

1049.40

1049.22

0.10

1.71

100-101
101-102

0.200

PVC

1047.60 1046.88

1049.22

1048.15

0.10

1.55

0.200

PVC

1046.86 1045.78

1048.15

1047.00

0.10

1.36

102-103
103-104

0.200

PVC

1045.76 1044.50

1047.00

1045.73

0.10

1.34

0.200

PVC

1044.48 1043.58

1045.73

1044.84

0.10

1.36

104-105
105-106

0.200

PVC

1043.56 1043.16

1044.84

1044.52

0.10

1.42

0.200

PVC

1043.14 1042.24

1044.52

1043.68

0.10

1.51

106-107
107-108
108-109

0.200

PVC

1042.22 1041.86

1043.68

1044.34

0.10

2.07

0.200

PVC

1041.84 1041.48

1044.34

1043.42

0.10

2.32

0.200

PVC

1041.46 1040.37

1043.42

1041.50

0.10

1.65

109-110
110-111

0.200

PVC

1040.35 1040.24

1041.50

1042.00

0.10

1.56

0.200

PVC

1040.22 1040.03

1042.00

1041.70

0.10

1.83

111-CM ACU

0.200

PVC

1040.01 1039.32

1041.70

1040.47

0.10

1.52

TOTALES

14 de 26

Excavacin Volumen
Ancho de
a maquina de grava
zanja (m)
(m)
(m)

Volumen de
tubera (m)

Relleno
importado
(m)

Retiros
(m)

Relleno del
sitio (m)

90.00
90.00
90.00

0.80

101.81

7.20

2.83

15.17

25.20

76.6

0.80

95.69

7.20

2.83

15.17

25.20

70.5

0.80

100.01

7.20

2.83

15.17

25.20

74.8

90.00
90.00

0.80

152.21

7.20

2.83

15.17

25.20

127.0

0.80

181.37

7.20

2.83

15.17

25.20

156.2

46.00
40.00

0.80

73.08

3.68

1.45

7.75

12.88

60.2

0.80

54.82

3.20

1.26

6.74

11.20

43.6

90.00
90.00

0.80

111.46

7.20

2.83

15.17

25.20

86.3

0.80

97.78

7.20

2.83

15.17

25.20

72.6

90.00
90.00

0.80

96.34

7.20

2.83

15.17

25.20

71.1

0.80

97.78

7.20

2.83

15.17

25.20

72.6

40.00
90.00

0.80

45.54

3.20

1.26

6.74

11.20

34.3

0.80

108.94

7.20

2.83

15.17

25.20

83.7

90.00
90.00
42.00

0.80

149.26

7.20

2.83

15.17

25.20

124.1

0.80

167.26

7.20

2.83

15.17

25.20

142.1

0.80

55.41

3.36

1.32

7.08

11.76

43.6

27.00
48.00

0.80

33.67

2.16

0.85

4.55

7.56

26.1

0.80

70.23

3.84

1.51

8.09

13.44

56.8

30.00
7,390

0.80

36.60

2.40

0.94

5.06

8.40

28.2

13,517

768

302

1,620

2,690

10,828

Tramo
93-94
94-95
95-96
96-97
97-98
98-99
99-100
100-101
101-102
102-103
103-104
104-105
105-106
106-107
107-108
108-109
109-110
110-111
111-CM ACU
TOTALES

15 de 26

Diametros
DIAMETROS INTERNOS - NOVAFORT Y NOVALOC
"
NOMINAL
Interno en m Exter en m Ancho Zanja
4
110
0.099
6
160
0.145
8
200
0.182
0.2
0.8
10
250
0.227
0.25
0.8
12
315
0.284
0.315
0.8
15
0.33
0.36
0.8
16
400
0.362
0.4
0.8
18
450
0.407
0.45
0.9
20
500
0.452
0.5
0.9
21
0.48
0.55
1
24
24
0.595
0.625
1.1
27
27
0.671
0.71
1.1
30
30
0.747
0.786
1.1
33
33
0.823
0.86
1.2
36
36
0.899
0.95
1.3
39
39
0.974
1.025
1.4
42
42
1.05
1.101
1.4
45
45
1.127
1.18
1.5
48
48
1.202
1.271
1.6
51
51
1.295
1.363
1.7
54
54
1.355
1.423
1.8
60
60
1.507
1.575
1.9

Pgina 16

Tramo
1-2
2-3
3-4
4-5
5-6
6-8
7-8
8-10
9-10
10-11
11-12
13-12
14-15
15-16
16-17
17-18
18-12
19-20
20-23
21-22
22-23
24-25
25-26
26-27
27-28
30-29
29-28
23-31
31-32
32-33
33-34
34-35
32-35
35-36
36-37
37-44
38-40
39-40
40-42
41-42
42-43
43-44
44-45

Longitud

(m)
80.00
90.00
90.00
90.00
28.00
82.00
60.00
38.00
39.00
54.00
90.00
57.00
90.00
90.00
100.00
100.00
96.00
93.00
100.00
90.00
56.00
78.00
90.00
90.00
90.00
100.00
80.00
85.00
66.00
86.00
50.00
86.00
47.00
19.00
50.00
41.00
40.00
75.00
34.00
52.00
40.00
4.00
87.00

Dimetro (")
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

Suma de Longitud
Dimetro (")

(m)
0
10
12
16
20

Total general

45-46
46-47
47-48
48-72
28-49
49-50
50-51
51-52
52-53
53-54
54-55
55-56
56-57
57-58
58-59

37.00
9.00
61.00
17.00
90.00
74.00
81.00
17.00
74.00
38.00
90.00
70.00
41.00
11.00
80.00

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

59-60
60-61
61-62
62-63
63-64
64-65
65-66
66-67
67-68
68-75
12-69
69-70
70-71
71-72
72-73
73-74
74-75
75-76
76-77
77-78
78-79
79-80
80-81
81-82
82-83
83-84
84-85

8.00
16.00
17.00
20.00
49.00
8.00
6.00
18.00
20.00
60.00
100.00
16.00
78.00
73.00
93.00
82.00
91.00
90.00
90.00
60.00
90.00
90.00
57.00
90.00
100.00
100.00
33.00
5348.00

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

Total
0
1706.15
124.8
169
66.4
2066.35

0
1706
125
169

RELACIONES HIDRAULICAS PARA TUBERIAS


PARCIALMENTE LLENAS EN FUNCION DE q/Q
q/Q

v/V
0
0.01
0.02
0.03
0.04
0.05
0.06
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41

d/D
0
0.29
0.344
0.386
0.419
0.445
0.468
0.506
0.523
0.539
0.553
0.567
0.579
0.591
0.602
0.614
0.625
0.636
0.646
0.656
0.665
0.674
0.683
0.692
0.7
0.708
0.716
0.724
0.732
0.739
0.747
0.754
0.761
0.768
0.775
0.782
0.788
0.795
0.801
0.807
0.813

t/T
0
0.076
0.108
0.131
0.152
0.169
0.186
0.215
0.228
0.241
0.253
0.265
0.276
0.287
0.297
0.307
0.317
0.326
0.335
0.344
0.353
0.362
0.37
0.379
0.387
0.395
0.403
0.411
0.418
0.426
0.433
0.44
0.448
0.455
0.462
0.469
0.476
0.483
0.49
0.497
0.503

0
0.195
0.273
0.328
0.375
0.315
0.452
0.515
0.542
0.568
0.592
0.615
0.637
0.658
0.678
0.697
0.715
0.732
0.748
0.764
0.779
0.794
0.809
0.822
0.836
0.849
0.862
0.874
0.885
0.897
0.908
0.918
0.929
0.939
0.949
0.959
0.968
0.978
0.987
0.996
1.004

0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86

0.819
0.825
0.83
0.836
0.841
0.847
0.852
0.857
0.862
0.857
0.872
0.877
0.882
0.887
0.891
0.896
0.9
0.904
0.909
0.913
0.917
0.921
0.925
0.929
0.933
0.937
0.941
0.944
0.948
0.951
0.955
0.959
0.963
0.967
0.97
0.974
0.977
0.981
0.984
0.988
0.991
0.994
0.997
1
1.003

0.51
0.517
0.523
0.53
0.537
0.543
0.55
0.556
0.563
0.569
0.576
0.582
0.589
0.595
0.602
0.608
0.614
0.621
0.627
0.634
0.64
0.646
0.653
0.659
0.666
0.672
0.679
0.689
0.692
0.699
0.705
0.712
0.718
0.724
0.731
0.738
0.744
0.751
0.758
0.764
0.771
0.778
0.785
0.792
0.8

1.013
1.021
1.029
1.037
1.045
1.052
1.059
1.067
1.074
1.08
1.087
1.093
1.1
1.106
1.112
1.118
1.124
1.129
1.135
1.14
1.145
1.15
1.155
1.159
1.164
1.168
1.173
1.177
1.181
1.184
1.188
1.191
1.194
1.197
1.2
1.202
1.205
1.207
1.209
1.211
1.213
1.214
1.215
1.216
1.217

0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
1.01
1.02

1.007
1.012
1.016
1.02
1.024
1.028
1.032
1.036
1.04
1.043
1.047
1.05
1.053
1.056
1.059
1.061

0.806
0.812
0.818
0.825
0.831
0.838
0.845
0.852
0.859
0.866
0.874
0.881
0.89
0.898
0.908
0.918

1.217
1.217
1.217
1.217
1.216
1.215
1.214
1.213
1.211
1.209
1.206
1.202
1.198
1.193
1.187
1.179

1.03

1.063

0.93

1.168

SILLAS YEE
Diametro Numero de casas
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

8
6
7
4
4
9

Suma de Numero de casas


Diametro
Total
10 194
12
7
18
7
20
23
Total general
231

6 METROS DE TUBERIA DE 6 POR CASA


3
5
16
10
4
3
11
5
22
5
14
7
5
14
18
14
6
9
7
8

mas sector B

6 POR CASA

150

344
7
7
23
381

6
2286

Sheet10
Diametro
10
10
18
0
10
10
10
0
20
0
10
0
20
0
10
10
0
10
0
10
0
10
10
0
10
0
10
0
10
0
12
0
20
0
10
0
10
10
0
20
0
10
10
0
10

Page 26

Das könnte Ihnen auch gefallen